Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC | ₹3.0 Cr Quoted ₹3.1 Cr | L1 | Accepted-AOC work order |
| 2 | L2₹3.2 CrRejected-Finance | ₹3.2 Cr | L2 | Rejected-Finance Due to highest rate quoted bidder is rejected |
| Sl No | Description | Qty | Unit | Shiva Engineering Work L2 | vaiyapuri & co L1 |
|---|---|---|---|---|---|
| 1.00Source improvement, Replacement of pipes & Pumpsets, Cables in CWSS to Nallur and 74 other habitations in Tiruvannamalai District (Construction period: 9 months and Free Maintenance: 3 months). - e–Submission | |||||
| 1.01 | Supply, Delivery and laying of pipes and specials etc, for Connecting main i) 150mm DI PN 10
ii) 160mm HDPE Pipe PN 6 | 1 | No | 2,57,103.7 ₹2.6 L | 2,45,623.7 ₹2.5 L |
| 1.02 | Supply, Delivery and laying of pipes and specials etc, for Branch pumping main
i) 160mm HDPE Pipe PN 6
ii) 90mm HDPE Pipe PN 6
iii) 63mm HDPE Pipe PN 6 and allied works | 1 | No | 1,98,00,030.29 ₹2.0 Cr | 1,89,15,990.16 ₹1.9 Cr |
| 1.03 | Supply and delivery of 95 sqmm and 25 sqmm LT 3 Core 1.1 KV Grade Armoured Aluminium conductor cross linked Polyethylene insulated PVC sheathed cables for IW and Open well | 1 | No | 21,61,252.8 ₹21.6 L | 20,64,768.3 ₹20.6 L |
| 1.04 | Supply, delivery and erection of Electro-Mechanical Items for Head works and boosters and valves and specials with allied works | 1 | No | 52,06,972.14 ₹52.1 L | 49,74,580.33 ₹49.7 L |
| 1.05 | Maintenance Of the Scheme | 1 | No | - | - |
| 1.06 | Add GST @ 18% on Basic value | 1 | No | 49,36,564.61 ₹49.4 L | 47,16,173.25 ₹47.2 L |
Tender Value
₹2.9 Cr
EMD Value
₹2.2 L
Closing Date
3 Jul 2025, 3:00 pmClosed
Chief Engineer
No.8, First East Main Road, Gandhi Nagar, Vellore-6
Revamping work for CWSS to Nallur
2025_TWAD_573473_1
NIT04 nallur11062025
Open Tender
Civil Works
270 days
Tiruvannamalai
Refer bid documents
4 documents required · 4 mandatory
₹0
₹2.2 L
Vellore
8 Jan 2026
25 Jun 2025
4 Jul 2025
25 Jun 2025
3 Jul 2025
25 Jun 2025
27 Jun 2025
Amount
Source improvement, Replacement of pipes & Pumpsets, Cables in CWSS to Nallur and 74 other habitations in Tiruvannamalai District (Construction period: 9 months and Free Maintenance: 3 months). - e–Submission
Supply, Delivery and laying of pipes and specials etc, for Connecting main i) 150mm DI PN 10 ii) 160mm HDPE Pipe PN 6
Supply, Delivery and laying of pipes and specials etc, for Branch pumping main i) 160mm HDPE Pipe PN 6 ii) 90mm HDPE Pipe PN 6 iii) 63mm HDPE Pipe PN 6 and allied works
Supply and delivery of 95 sqmm and 25 sqmm LT 3 Core 1.1 KV Grade Armoured Aluminium conductor cross linked Polyethylene insulated PVC sheathed cables for IW and Open well
Supply, delivery and erection of Electro-Mechanical Items for Head works and boosters and valves and specials with allied works
Maintenance Of the Scheme
Add GST @ 18% on Basic value
Shiva Engineering Work (BID ID -1389841)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid