| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Finance GSTIN: 06AAGAT8251P1ZTDARBA KALAN WARD NO 9 GIGORANI DISTT SIRSA C O SIRSA ROAD NATHUSARI CHOPTA WARD NO 9 GIGORANI DISTT SIRSA C O SIRSA ROAD NATHUSARI CHOPTA 125110 | SIRSA | HARYANA | 125110 | -31.15% | ₹6.0 L | L1 | Admitted-Finance |
| 2 | L2₹6.7 LAdmitted-Finance GSTIN: 06AABAT7738C1ZJHARYANA HR | -23.59% | ₹6.7 L | L2 | Admitted-Finance |
| 3 | L3₹8.3 LAdmitted-Finance VPO KANWARI VPO KANWARI DISTT HISAR 125037 | HISAR | HARYANA | 125037 | -4.77% | ₹8.3 L | L3 | Admitted-Finance |
| 4 | L4₹8.6 LAdmitted-Finance 62 PINK ROSE COLONY KAIMARI ROAD 125001 | HISAR | HARYANA | 125001 | -1.50% | ₹8.6 L | L4 | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹17,480
Closing Date
23 Apr 2026, 5:00 pmClosed
Harvinder Kumar
Electrical Hissar
Annual Maintenance of Street Light Points (EDC) Dividing road and outer road Sector 19P and 20P-III at Sirsa for the year 2026-27. (Rates taken in DNIT are excluding GST)
2026_HBC_515138_1
2026D67ED6EF 3861 44DA A081 ABB1121052EA246HSV
Open Tender
Electrical Works
365 days
Sirsa
Annual Maintenance of Street Light Points (EDC) Dividing road and outer road Sector 19P and 20P-III at Sirsa for the year 2026-27. (Rates taken in DNIT are excluding GST)
2 documents required · 2 mandatory
₹500
Yes
₹17,480
Yes
20 May 2026
15 Apr 2026
24 Apr 2026
15 Apr 2026
23 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 24.5.2.3
MISCELLANEOUS ITEMS 2.3. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work.
DWC/HDPE pipe 63/50 mm outer dia/inner dia | - | Metre | - | - |
23.22.1.3
MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 1.3. Supply and erection of Modular case circuit breaker single pole/4 pole on existing wall/pedestal/Panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire satisfaction of the Engineer-in-charge of the work. TRIPLE POLE MCCB 16 to 100 Amp, 25 KA | - | Each | - | - | |
23.22.5.1
MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker 240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole | - | Each | - | - | |
24.13.32
LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 32. 25 Sq mm 4 core (Arm.) | - | Metre | - | - | |
Job Work
Repair with complete material, labour and ON/OFF operation of LED Street light fitting/LED flood light fitting 90 Watt to 200 Watt including fault finding of electrical circuits complete in all respect (Excluding GST). | - | Each | - | - | |
Job Work
Supply, erection, testing and commissioning of ELEX-TWS-2EXT / Amson’s make Automatic electric timer to switch ON/OFF the street light / road light automatically. It should have lux level adjustable switch, with extensible mountable senor. It will change ON/OFF timing automatically as per lux level of season throughout the year as purchase in the timing of sun-rising and sun setting suitable for street / road light. It will have three Nos. LandT make, 3 poles power contactor model MNX-25 to control 25 amp. Per phase with 220 Volt coils. It will have auto/manual switching mode for repair of street light during day time and the whole unit fixed on Bakelite sheet to assemble the components etc. The erection of the complete unit in the existing pedestal with complete wiring upto the satisfaction of the Engineer-in-charge. (Excluding GST). | - | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_593971.xls
BOQ • 0.28 MB
AD0156801.pdf
Additional Documents • 0.33 MB
Download all tender documents and submit your bid