| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC | ₹4.3 Cr | L1 | Accepted-AOC l1 |
| 2 | Rejected-Technical SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | - | - | Rejected-Technical failed to submit CREDENTIAL as per PQR |
| Sl No | Description | Qty | Unit | ABZAN CONSTRUCTION PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00Boiler Cleaning | ||||
| 1.01 | External Cleaning of Boiler from Top to Bottom & upto ID Fans (During AOH) | 4 | LS | - |
| 1.02 | External Cleaning of Boiler Structure (During Preventive / Break Down Maintenance) | 16 | Nos | - |
| 1.03 | Pent House (During AOH) | 4 | LS | - |
| 1.04 | Pent House (During Preventive / Break Down Maintenance) | 12 | Nos | - |
| 1.05 | Dead Chamber (During AOH) | 4 | LS | - |
| 1.06 | Dead Chamber (During Preventive / Break Down Maintenance) | 4 | Nos | - |
| 1.07 | Economizer Hoppers with Connecting Ducts (During AOH) | 4 | LS | - |
| 1.08 | Economizer Hoppers with Connecting Ducts (During Preventive / Break Down Maintenance) | 16 | Nos | - |
| 1.09 | Bottom Ash Hoppers | 4 | LS | - |
Tender Value
₹4.5 Cr
EMD Value
₹4.5 L
Closing Date
24 Mar 2020, 3:00 pmClosed
SE PNW,SGTPS,MPPGCL,BIRSINGHPUR
SE PNW,SGTPS,MPPGCL,BIRSINGHPUR
Work of Annual Capital Overhauling an Preventive , Break Down Maintenance of Boiler Pressure Parts for Unit No. 1 to 4 of 210 MW Units of PH1 and PH 2 at SGTPS, MPPGCL, Birsinghpurfor the year 2020 21 .As per attached tender Schedule and SOW
2019_MPPGC_72474_1
72474
Open Tender
Miscellaneous Works
Fixed-rate
365 days
SGTPS, MPPGCL, BIRSINGHPUR
As per PQR clause of NIT
16 documents required · 16 mandatory
₹5,000
Sr AO SGTPS MPPGCL Birsinghpur
₹4.5 L
Yes
16 Oct 2025
17 Jan 2020
28 Mar 2020
17 Jan 2020
24 Mar 2020
17 Jan 2020
Boiler Cleaning
External Cleaning of Boiler from Top to Bottom & upto ID Fans (During AOH)
External Cleaning of Boiler Structure (During Preventive / Break Down Maintenance)
Pent House (During AOH)
Pent House (During Preventive / Break Down Maintenance)
Dead Chamber (During AOH)
Dead Chamber (During Preventive / Break Down Maintenance)
Economizer Hoppers with Connecting Ducts (During AOH)
Economizer Hoppers with Connecting Ducts (During Preventive / Break Down Maintenance)
Bottom Ash Hoppers
Cleaning of Entire Second Pass Coils / Tubes
Hydrojet Cleaning of Coils & Tubes
Cleaning of Final Super Heater Coils
Cleaning of Platen Super Heater Coils
Cleaning of Pendent Re-heater Coils
Cleaning of Water Wall Tubes
SCAFFOLDING
Re-heater / Final / Platen Super Heater (from Goose Neck to Roof)
Furnace (From Bottom Ash Hopper to Goose Neck)
a) Convection Method
b) Cup-lox Method (Entire Boiler 1st & 2nd Pass)
Preparation of Scaffolding above Goose Neck for Inspection of Pendent Re-heater Final / Platen Super Heater (During Preventive / Break Down Maintenance)
HP Joints in Boiler Tubes
Economiser
Primary Super Heater / Baffle Tubes
Final & Platen Super Heater
Water Wall
Horizontal Re-heater (100% radiography)
Pendant Re-heater (100% radiography)
Slings (Riser Tubes)
Bleed Tubes
Stringer Tubes
Cage Tubes
Hydra Step
Drains
Vents
Instrument Piping
Reinforcement of Welding Joints
Economiser / Bleed
Re-heater / Water Wall
Slings / Riser
Drum Vent
Assistance in Non-destructive Test (During AOH)
Assistance in Thickness Survey & Radiography (During Preventive / Break Down Maintenance)
Alignment of Economizer / Super Heater / Re-heater Coils
Welding on Eroded Tubes
a) Size 50x50 sqmm
Welding of Fins
Header Inspection & Flashing / Inspection of Spray Nozzle Attemperator
Bend Fabrication
Fabrication & Fixing of Erosion Shield / Casstte Baffle
Fabrication & Fixing
Fixing Only
Fabriction / repairing / fixing of Cassette Baffle in Economizer, Primary Super Heater, Horizontal Re-heater
H.P.Valves
Root Valves (Upto 25 mm)
a) Replacement
b) Repair / Servicing
c) Gland Packing
Above 25 mm to 100 mm
a) Replacement
b) Repair / Servicing
c) Gland Packing
Above 100 mm
a) Replacement
b) Repair / Servicing
c) Gland Packing
Boiler Safety Valves
a) Repair / Servicing
Feed Regulating Valve with Actuator
a) Repair / Servicing
Boiler Drum Cleaning & Repairing with Associated Piping
Repairing of Pent House and Internals
Replacement of Pent House Boxses
a) With Steel
b) With out Steel
Repairing of Dead Chamber
a) With Steel
b) With out Steel
Repairing of Economiser Hoppers & Connection Joint Ducting & Making / Strenghten of their Platform
Repairing of Economiser Casing
Repairing of Bottom Ash Hopper Liner & Seal Trough Including Fixing of Dipper Plate
Repairing of Furnace Zone & Rest of the Areas
a) With Steel
b) With out Steel
Repairing of Second pass casing
a) With Steel
b) With out Steel
Replacement / Strengthening of Baffle Plate between PSH & Re-heater
a) With Steel
b) With out Steel
Repairing of Cat House
a) With Steel
b) With out Steel
Repairing & Servicing
a) Buckstays
b) Diamond Type Locks
c) Rockers
Servicing of Hangers and Supports
Application of Refractory Grade “A”
Application of Refractory Grade-“C”
a) Penthouse
b) Dead Chamber & Screen Wall
c) Other Areas like BAH/Hoppers/Headers etc.
Assistance in Hydraulic Test.
Installation of MITP
Servicing / Repairing of Drum Sampling Cooler
Repairing of Furnace Man Hole / Peep Hole / View Window
Application of Thermal Insulation at Boiler and Associated Auxiliaries
Complete Bolier from Bottom Ash Hopper to Penthouse
Steam and Water Piping
Boiler Drum and Piping
Wind Box
Air and Flue Gas Ducting upto Chimney
ID/FD/PA Fan Ducting
Coal Mill and Fuel Pipings
Painting of Boiler Base Structure
Repairing of Re- heater & PSH Aero Dynamic Damper inclding Top / Bottom and Near by Area
Removal of Thermal Insulation of Boiler and Associated Auxiliaries
Disposal of Rubbish Thermal Insulation
Removal of Erosion Shield
WIND BOX
Cleaning of Wind Box & Ash Transportation
Repairing of Wind Box
a) With Steel
b) With out Steel
Repairing of Wind Box roof
a) With Steel
b) With out Steel
AIR RESISTERS
Servicing of Air Resisters in position (Major)
Making Air registers operative (Minor)
Replacement of Air Resisters
Repairing of Core Tube
Replacement of Core Tube
COAL BURNERS
Servicing of PF Burners (During AOH) (PH-I)
Repairing of PF Burner Assembly (During Preventive / Break Down Maintenance)
Servicing of PF Nozzle (PH-I)
Servicing of PF Burners (PH-II)
Replacement of PF Burners Assembly (PH-I)
Replacement of PF Nozzle
Replacement of PF Burners Assembly (PH-II)
Refractory
Repair/Replacement of Liners of Banjo
FUEL OIL CIRCUIT
Servicing of Complete Oil Burner Assembly
Re-visioning of isolating and control valve
HFO Isolating V/v Glove 25 mm
LDO Isolating V/v Glove 20 mm
Attomisation Steam V/v Glove 15 mm
NRV's Glove 25 mm
Control Valve Glove 25 mm
HFO Control / Shut off Valve 50 mm
LDO Control /Shut off Valve 50 mm
HFO /LDO Isolating Valve 50mm
Heating Line Drain / Trapes Glove V/v 25 mm
SERVICING OF HFO /LDO PRES. SYSTEM
Serv. of HFO COMP. Press. Sys. Pumps, Filter
Heaters
Serv. of LDO COMP. Press. Sys. Pumps, Filter
Servicing / Replacement of Valves
a. Up to 50 mm
b. Above 50 mm
HFO / LDO Unloading System
Servicing of Basket Filter.
Serv. of Newly Installed HFO / LDO COMP. Unloading Sys. Pumps from Tankers, Heaters
Cleaning and Disposal of Fly Ash / Coarse Ash Debris upto the suitable place i.e. Ash Dyke etc. (During Preventive / Break Down Maintenance)
Assistant in Safety Valve Setting
Initial Mobilization Charges during Tube Leakage Attending
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .