Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 CrAccepted-AOC GSTIN: 27AAIFU2749N1ZH, 27ACAPB9568Q1ZY | ₹6.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.1 CrRejected-Finance GSTIN: 27AKFPG9303H1Z9 | ₹6.1 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹6.9 CrRejected-Finance GSTIN: 27AAEFT8919P1ZARAJIV GANDHI COMPLEX NEAR OLD BUS STAND TIRORA DIST GONDIA 441911 | TIRORA | GONDIA | MAHARASHTRA | 441911 | ₹6.9 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹7.1 CrRejected-Finance GSTIN: 27AAIFV5749H1ZN, 27AEPPU4347B1Z8, 27AIBPM8617L1ZV, 27ARTPB5524E1ZT | ₹7.1 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹7.3 CrRejected-Finance GSTIN: 27AAAFU4255D1ZD | ₹7.3 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | vedant construction L4 | M/s.United Builders L5 | SARFARAJ A GODIL L2 | Trimurti Constructions L3 | M/s. Uma Construction Deori L1 | S H Chakole L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Cleaning grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201 | |||||||||
| 1.10 | SH-359 TO DABHA- SONULI ROAD | 1.46 | One Hector | 25,000 ₹36,500 | 10 ₹14.60 | 27,000 ₹39,420 | 20,000 ₹29,200 | 2,555 ₹3,730.30 | 30,528 ₹44,570.88 |
| 1.20 | SH-355 TO PAHELA PAGORA ROAD | 0.86 | One Hector | 25,000 ₹21,500 | 10 ₹8.60 | 27,000 ₹23,220 | 20,000 ₹17,200 | 2,555 ₹2,197.30 | 30,100 ₹25,886 |
| 1.30 | SH-359 TO LAWESHWAR ROAD | 0.39 | One Hector | 25,000 ₹9,750 | 10 ₹3.90 | 27,000 ₹10,530 | 20,000 ₹7,800 | 2,555 ₹996.45 | 30,528 ₹11,905.92 |
| 1.40 | SH-355 TO PAHELA- CHIKHALPAHELA ROAD | 1.28 | One Hector | 25,000 ₹32,000 | 10 ₹12.80 | 27,000 ₹34,560 | 20,000 ₹25,600 | 2,555 ₹3,270.40 | 30,100 ₹38,528 |
| 2.00Dismantaling of flexible pavements and disposal of dismantled materials upto a lead of 100 m. stacking serviceable and unserviceable materials separately as per technical Specification Clause | |||||||||
| 2.10 | SH-359 TO LAWESHWAR ROAD | 92.88 | One Cubic Meter | 350 ₹32,508 | 50 ₹4,644 | 337 ₹31,300.56 | 400 ₹37,152 | 139 ₹12,910.32 | 387 ₹35,944.56 |
| 2.20 | SH-355 TO PAHELA- CHIKHALPAHELA ROAD | 125.76 | One Cubic Meter | 350 ₹44,016 | 50 ₹6,288 | 340 ₹42,758.40 | 400 ₹50,304 | 139 ₹17,480.64 | 387 ₹48,669.12 |
| 3.00Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lift and lead as per Technical Specification Clause 302.3 | |||||||||
| 3.10 | SH-359 TO DABHA- SONULI ROAD | 8,842.35 | One Cubic Meter | 65 ₹5.7 L | 50 ₹4.4 L | 55 ₹4.9 L | 60 ₹5.3 L | 79 ₹7.0 L | 69 ₹6.1 L |
Tender Value
Refer Docs
EMD Value
₹4.1 L
Closing Date
2 Apr 2026, 5:00 pmClosed
Executive Engineer PMGSY MRRDA Bhandara
Superintending Engineer, PMGSY, MRRDA, Nagpur
1.SH 359 DABHA- SONULI ROAD 2.SH 355 PAHELA PAGORA ROAD 3.SH 359 LAWESHWAR ROAD 4.SH 355 PAHELA CHIKHALPAHELA ROAD
2026_MMGSY_1289754_1
02/2025-26
Open Tender
Civil Works - Roads
365 days
Bhandara
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹4.1 L
14 May 2026
24 Mar 2026
4 Apr 2026
24 Mar 2026
2 Apr 2026
24 Mar 2026
24 Mar 2026 - 27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201 | |||||
| 1.1 | SH-359 TO DABHA- SONULI ROAD | - | One Hector | - | - |
| 1.2 | SH-355 TO PAHELA PAGORA ROAD | - | One Hector | - | - |
| 1.3 | SH-359 TO LAWESHWAR ROAD | - | One Hector | - | - |
| 1.4 | SH-355 TO PAHELA- CHIKHALPAHELA ROAD | - | One Hector | - | - |
| 2Dismantaling of flexible pavements and disposal of dismantled materials upto a lead of 100 m. stacking serviceable and unserviceable materials separately as per technical Specification Clause | |||||
| 2.1 | SH-359 TO LAWESHWAR ROAD | - | One Cubic Meter | - | - |
| 2.2 | SH-355 TO PAHELA- CHIKHALPAHELA ROAD | - | One Cubic Meter | - | - |
| 3Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lift and lead as per Technical Specification Clause 302.3 | |||||
| 3.1 | SH-359 TO DABHA- SONULI ROAD | - | One Cubic Meter | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.69 MB
ADBBHAII09SDBMarch.pdf
Tender Documents • 4.62 MB
BOQ_2217398.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid