| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 3RD MILE SEVOKE ROAD SALUGARA SILIGURI 734001 | JALPAIGURI | WEST BENGAL | 734001 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹100.0 L
EMD Value
₹2.0 L
Closing Date
21 Mar 2026, 6:00 pmClosed
Executive Engineer, Kalimpong Engineering Division
Executive Engineer, Kalimpong Engineering Division,Kalimpong
Construction of Cement Concrete road from Makum Khola Taar to Fangtar Picnic Spot,Yangmakum G.P. under 42nd constituency, Kalimpong Block I. Length 1.00 km
2026_GTA_1017298_1
61/EE/KED/KPG/GTA/2025-26
Open Tender
CIVIL WORKS
Percentage
270 days
Kalimpong
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹2.0 L
30 Jul 2026
7 Mar 2026
24 Mar 2026
8 Mar 2026
21 Mar 2026
8 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works)) | 3,392.39 | Cum | 107.14 | ₹3,63,460.66 |
| 0.0 | (iii) In mixed hard soil (i,e hard moorum and soil
containing laterite and boulders which do not require blasting) | 376.93 | Cum | 130.98 | ₹49,370.29 |
| 0.0 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge | 561.62 | Cum | 137.06 | ₹76,975.64 |
| 0.0 | Hand Packed rough dressed stone walls by masons with hard stones from approved quarries including all carriage of materials to site | 99 | Cum | 2,923.25 | ₹2,89,401.75 |
| 0.0 | Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site | 339.26 | Cum | 5,347.37 | ₹18,14,148.75 |
| 0.0 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge. [Rate provided is exclusive of the cost of stone boulders and sausage crate] | 85.95 | Cum | 2,977.43 | ₹2,55,910.11 |
| 0.0 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. | 527.33 | Sqm | 255.05 | ₹1,34,495.52 |
| 0.0 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. | 108.99 | Cum | 4,725.25 | ₹5,15,005 |
| 0.0 | Labour for laying stone edging with departmental stone materials laid to correct line and level including carriage of departmental stone materials within a lead of 150 metres cutting necessary trench in soil or in hard metalled surface, laying the stones and repacking the trench on both sides of the edging with spoils and ramming the same thoroughly. | 3,752 | M | 74.79 | ₹2,80,612.08 |
| 0.0 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 4,684.8 | Sqm | 361.55 | ₹16,93,789.44 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.59 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
Tendernotice_2.pdf
PDF • 2.02 MB
BOQ_2503238.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .