Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹27.5 L
EMD Value
₹27,500
Closing Date
4 Apr 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP
Block Development Office, Nambiyur
Repair and Renovation of Work at Samathuvapuram in Anjanur of Nambiyur Block under Samathuvapuram 2022-23
2023_RDTN_297951_1
Roc No.891/2021/A2, Dated 27.03.2023
Open Tender
Civil Works
Item Rate
180 days
Nambiyur Block
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹27,500
4 Apr 2023
28 Mar 2023
4 Apr 2023
28 Mar 2023
4 Apr 2023
28 Mar 2023
Amount
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Chipping and Clean Removel of Cement Concrete Including all cost and conveyance and all labour charges etc., complete
PLASTERING with cement mortar 1:3 - 10mm thick in all floors complying with standard specifications.
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Toilet Repair Sub Estimate
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Rainwater Harvesting Structure Sub Estimate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply and filling of 40 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 20 mm metal including all cost and conveyance of materials and labour charges etc., complete
Supply and filling of 10 - 20 mm Chips including all cost and conveyance of materials and labour charges etc., complete
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends, and clamps., including all cost and conveyance of materials and labour charges etc., complete
PVC 110mm dia Elbow
Clearingthe Scrub jungle including all labour charges for burrying and burning etc., complete
Collection and supply of Gravel in layers including cost and conveyance of all materials to site and labour charges etc., complete.
Provision for Play Materials
See Saw fourseated
Slide with Ladder
Duck shaped Merry go Round
Swing double seater
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Clearingthe Scrub jungle including all labour charges for burrying and burning etc., complete
Collection and supply of Gravel in layers including cost and conveyance of all materials to site and labour charges etc., complete.
Dismantaling and Clearing Plastering Wall including all labour charges etc., complete
Providing Granolythic floor finish in cement concrete 1:2:4 mix using 10-12 mm ISS metal including cost and conveyance of all materials to site and all labour charges etc.,
White washing two coats using shell lime including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Painting two coats over old iron work with synthetic enamel paint of approved quality including all cost and conveyance of materials and labour charges etc., complete
Exterior emulsion finishing two coats over one coat of primer including all cost and conveyance of materials and labour charges etc., complete
Earth work excavation and depositing on banks with initial lead of 10 metres and lift of 2 metres in all classes of soil to strengthen the side berms as per SS20 A
Providing and laying Gravel soling to 100 mm compacted thick including cost and conveyance of gravel from approved sources to work site including labour for spreading ,watering and compacting by power roller to achieve the requird proctor dencity at 100 % compaction etc,complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying TACK COAT over the BT surface using 3.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over the WMM surface using 2.50 Kg of bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18 cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.6 kg of bitumen for 10 sqm of premix carpet including laying of seal coat type A over the premix carpet using 0.09 cum of 6.7 mm IRC size HBG machine crushed chips with 9.8 kg of 60/70 grade bitumen per 10 sqm using 1.168 Kg plastic waste including cost and conveyance of chips and stacking them to departmental gauge for premeasurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80-100 KN capacity and all incidental charges etc., complete.
Repirs to the parapet (sub Estimate)
Supply and errection of centering using steel shutters with necessary supports including hire and labour charges.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc. complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
POOMIKA INFRA DEVELOPER SATHY
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .