Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.0 CrAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | Rejected-Technical | - | Rejected-Technical Non Responsive |
Tender Value
₹8.6 Cr
EMD Value
₹17.2 L
Closing Date
12 Jun 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Chief Engineer
Water Resources Zone, Banswara
Strengthening of Kagdi Reservoir Tehsil and District Banswara
2023_WRDAS_337905_1
ACE E NIT No 02 of 2023-24
Open Tender
Civil Works
Percentage
545 days
Banswara
Pre-bid
2 documents required · 2 mandatory
₹10,000
Executive Engineer
₹17.2 L
Yes
Banswara
29 Dec 2023
24 May 2023
13 Jun 2023
24 May 2023
12 Jun 2023
24 May 2023
1 Jun 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 22,500 | Sqm | 2.5 | ₹56,250 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | 1,216.22 | Cum | 93 | ₹1,13,108.46 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum
5.12 Add extra over item code 5.1.1 to 5.5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. | 1,216.22 | Cum | 143.75 | ₹1,74,831.63 |
| 4 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock
5.12 Add extra over item code 5.1.1 to 5.5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. | 810.81 | Cum | 193.75 | ₹1,57,094.44 |
| 5 | Preparation of foundation of structure including removal of all loose stones, silt and final washing. By manual labour | 1,351.35 | Sqm | 23 | ₹31,081.05 |
| 6 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) | 581 | Sqm | 160 | ₹92,960 |
| 7 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 44,138.93 | Kg. | 95 | ₹41,93,198.35 |
| 8 | (i) Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.at least 95% of Standard Proctor s density | 22,585 | Cum | 38 | ₹8,58,230 |
| 9 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 22,585 | Cum | 11.1 | ₹2,50,693.5 |
| 10 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With initial lead of 250 m
5.17.1 Deduct in item CODE 5.16.1 to 5.16.4 above if Standard Proctor s density to be achived is at least 95%
5.29 Add extra for earth taken from private land with all lead and lift, land to be arrangged by contractor through private negotiations. Item applicable on certification by E.E. that no Government land is available with 250 meters from borrow area. | 22,585 | Cum | 149 | ₹33,65,165 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tendernotice_1.pdf
Tender Document • 1.22 MB
FB24052023KR.pdf
Tender Document • 7.79 MB
TB24052023KR.pdf
Tender Document • 0.63 MB
BOQ_599494.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .