Loading…
Loading…
Tender Value
₹84.0 L
EMD Value
₹1.7 L
Closing Date
6 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Repairs to formation and construction of side drain at various locations in Peralam - Karaikal section.
TPJ-10-2026-10
TPJ-10-2026-10
Open
6 Months
Karaikal, Puducherry
₹0
₹1.7 L
11 Jun 2026
11 Jun 2026
22 Jun 2026
percentage above or below the advertised value of schedule 'A1' (The advertised value is inclusive
of Railways escalation over CPWD-DSR 2023 basic value)
Improvement of newly constructed LCs, Strengthening of meeting post and A-Base concreting in
disturbed locations between PEM and KIK stations
S No. Item Description of Item Unit Qty Rate Amount
4.0 CONCRETE WORK
4.14S MISCELLANEOUS
Providing and laying in position ready mixed or
site batched design mix cement concrete for plain
cement concrete work; using coarse aggregate
and fine aggregate derived from natural sources,
Portland Pozzolana/Ordinary Portland /Portland
Slag cement, admixtures in recommended
proportions as per IS: 9103 to accelerate / retard
setting of concrete, to improve durability and
workability without impairing strength; including
pumping of concrete to site of laying, curing,
carriage for all leads; but excluding the cost of
centering, shuttering and finishing as per direction
of the engineer-in-charge; for the following grades
4.20.2 All works above plinth and upto floor V level
4.20.2.3 Concrete of M20 grade with minimum cement cum 10 9568.25 95682.5
content of 270 kg /cum
Item- 2 Construction of side drain.
S No. Item Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
2.1S General
Earth work in excavation by mechanical means
(Hydraulic excavator)/manual means over areas
(exceeding 30 cm in depth, 1.5 m in width as well
as 10 sqm on plan) including getting out and
disposal of excavated earth lead upto 50 m and for
all lift, as directed by Engineer-in-charge.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement concrete
4.1 of specified grade excluding the cost of centering
and shuttering - All work up to plinth level :
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
4.1.6 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived cum 48 7178.75 344580
2 from natural sources : 6 graded stone aggregate
40 mm nominal size derived from natural sources)
5.0 REINFORCEMENT CEMENT CONCRETE
5.9S FORM WORK
Centering and shuttering including strutting,
propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for Sqm 150 392.15 58822.5
5.9.2 Walls (any thickness) including attached pilasters, Sqm 1200 842.5 1011000
buttresses, plinth and string courses etc.
5.33S DESIGN MIX CONCRETE
Providing and laying in position ready mixed or
site batched design mix cement concrete for
reinforced cement concrete work; u s i n g coarse
aggregate and fine aggregate derived from natural
sources, Portland Pozzolana / Ordinary Portland
/Portland Slag c e m e n t , admixtures in
recommended proportions as per IS: 9103 to
accelerate / retard setting of concrete, to improve
durability and workability without impairing
strength; including pumping of concrete to site of
laying, curing, carriage for all leads; but excluding
the cost of centering, shuttering, finishing and
reinforcement as per direction of the engineer-in-
charge, for the following grades of concrete.:
5.33.1 All works upto plinth level
5.33.1.1 Concrete of M25 grade with minimum cement cum 146 9504.75 1387693.5
content of 330 kg /cum
13.0 FINISHING
13.44S EXTERIOR FINISHING
Finishing walls with water proofing cement paint of
required shade :
Schedule A2-All items which are covered by Unified Standard Schedule of rates 2021 for
Tiruchchirappalli Division - Except supply of cement and reinforcement steel. (The
Schedule tenderer/contractor shall quote a rate 'at par' or a collective percentage above or below the
advertised value of schedule 'A2' (The advertised value is inclusive of Railways escalation over
USSOR 2021 basic value)
Item- 1 Repairs to formation between PEM and KIK stations.
S No. Item Description of Item Unit Qty Rate Amount
Earthwork in filling in embankment, guide bunds,
around buried type abutments, bridge gaps, trolley
refuges, platforms etc. with contractor's own earth
conforming to Soil Quality Class SQ1/SQ2/SQ3,
after preparation of foundations as applicable,
benching in existing banks wherever required,
spreading in layers with motor grader, bringing the
moisture content to OMC, mechanical compaction
to specified density and dressing of bank to final
profile as per RDSO Specifications: RDSO/2020/GE:
IRS-0004 with latest correction slips. Note: 1)
Foundation preparation, Benching including
additional earthwork on account of this, wherever
required, shall be paid extra under relevant
schedule item for benching. 2) Payment for
Earthwork under this item shall be made based on
the cross section measurements calculated (i) with
original ground profile of existing bank based on
initial ground levels before doing benching and (ii)
final profile of the bank worked out with final
levels as per prevailing guidelines.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
2 051060 Providing and laying Pitching with Stone Boulders, cum 750.00 2423.99 1817992.50
weighing not less than 35kg each with voids filled
with spalls on slopes, laid over prepared filter
media including boulder apron laid dry in front of
toe of embankment complete as per drawing and
Technical Specifications (filter media to be paid
separately under the relevant item).
Improvement of newly constructed LCs and Strengthening of meeting post and A-Base concreting
in disturbed locations between PEM and KIK stations.
S No. Item Description of Item Unit Qty Rate Amount
Earthwork in filling in embankment, guide bunds,
around buried type abutments, bridge gaps, trolley
refuges, platforms etc. with contractor's own earth
conforming to Soil Quality Class SQ1/SQ2/SQ3,
after preparation of foundations as applicable,
benching in existing banks wherever required,
spreading in layers with motor grader, bringing the
moisture content to OMC, mechanical compaction
to specified density and dressing of bank to final
profile as per RDSO Specifications: RDSO/2020/GE:
IRS-0004 with latest correction slips. Note: 1)
Foundation preparation, Benching including
additional earthwork on account of this, wherever
required, shall be paid extra under relevant
schedule item for benching. 2) Payment for
Earthwork under this item shall be made based on
the cross section measurements calculated (i) with
original ground profile of existing bank based on
initial ground levels before doing benching and (ii)
final profile of the bank worked out with final
levels as per prevailing guidelines.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-V-VA-16082023.pdf
ATTACHMENT
SpecialConditions-updationoflabourdata.pdf
ATTACHMENT
annexurefortechnicalcomplaince18122022.pdf annexure for technical compliance
ATTACHMENT
JPO.pdf
ATTACHMENT
Registersatworksite.pdf
ATTACHMENT
specialconditionofcontract-pem-kik.pdf
ATTACHMENT
Tenderformfirstpagesecondpage.pdf
ATTACHMENT
GCC-April-2022updatedandCSNo-10.pdf
ATTACHMENT
ACSNo.11forGCC2022dt.13.3.26.pdf
ATTACHMENT
RDSOcircularforsteelreinforcement.pdf
ATTACHMENT
SpecialconditionsforsubmissionofBG.pdf
ATTACHMENT
specificationforworks.pdf
ATTACHMENT
BOCWWcessRBletterdt.02.01.2026.pdf
ATTACHMENT
FormforPoliceverificationofcontractualstaff.pdf Verification for contractual staff
ATTACHMENT
annexureforcommercialcomplaince.pdf
ATTACHMENT
PPEforsafetyinconstructionsite_1.pdf
ATTACHMENT
annexurefortechnicalcomplaince18122022.pdf
ATTACHMENT
FormforPoliceverificationofcontractualstaff.pdf
ATTACHMENT