Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC CAMP PALI PROJECT COLONY QTR NO 18 3 BIRSINGHPUR DISTT UMARIA MP 484551 | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484551 | L1 | Accepted-AOC 1 | |
| 2 | L2₹6.0 L+₹41,064 (7.37%)Rejected-AOC SP 48 MPPGCL COLONY BIRSINGHPUR | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | L2 | Rejected-AOC 2 | |
| 3 | Rejected-Technical | - | Rejected-Technical disqualified |
Tender Value
Refer Docs
EMD Value
₹17,100
Closing Date
15 Mar 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE(PNW) SGTPS MPPGCL Birsinghpur
SE(PNW) SGTPS MPPGCL Birsinghpur
Work contract for condenser tube cleaning by hydrojet method of Unit 1 to4 of 210 MW Units of PH-I and PH-II at SGTPS, MPPGCL, Birsinghpur during AOH-2021 AND 2022
2020_MPPGC_118850_1
118850
Open Tender
Electrical and Maintenance Works
Lump-sum
7 days
SGTPS MPPGCL BIRSINGHPUR UMARIA
Status of Bidder as per NIT clause 5 a, Copies of previously executed orders as per NIT clause 5 b, Copy of EPF registration as per NIT clause 5c, Copy of GST registration as per NIT clause 5d
13 documents required · 13 mandatory
₹500
Yes
₹17,100
Yes
12 Mar 2022
2 Feb 2021
18 Mar 2021
2 Feb 2021
15 Mar 2021
2 Feb 2021
180 days
SGTPS Birsinghpur
Condenser tubes cleaning by Hydro jet method in units 1,2,3 & 4 SGTPS, Birsinghpur during AOH-(2021-22) The technical specification of condensers are as under:- UNITS 1&2 UNIT 3&4 OD of tube : 25.4 mm 25.4mm Thickness : 01 mm 01 mm Length : 6,300 mm 7,600 mm Tube material : Cu-Ni 90/10 Cu-Ni 90/10 No of tubes installed :19,218 19,218 No of tubes to be : 18,860 18,000 cleaned
Condenser tubes cleaning by Hydro jet method in units 1,2,3 & 4 SGTPS, Birsinghpur during AOH-(2022-23) The technical specification of condensers are as under:- UNITS 1&2 UNIT 3&4 OD of tube : 25.4 mm 25.4mm Thickness : 01 mm 01 mm Length : 6,300 mm 7,600 mm Tube material : Cu-Ni 90/10 Cu-Ni 90/10 No of tubes installed :19,218 19,218 No of tubes to be : 18,860 18,000 cleaned
R C CONSTRUCTION
stage.html
html • 0.05 MB
technical_147363.pdf
PDF • 0.04 MB
techsummary_147363.pdf
PDF • 0.08 MB
finance_147363.pdf
PDF • 0.04 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_147363.pdf
PDF • 0.04 MB
T118850Order.pdf
PDF • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .