Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance | ₹1.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.6 LRejected-Finance | ₹1.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 LRejected-Finance | ₹1.7 L | L3 | Rejected-Finance L3 |
| 4 | L4₹1.7 LRejected-Finance | ₹1.7 L | L4 | Rejected-Finance L4 |
| 5 | L5₹1.8 LRejected-Finance | ₹1.8 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | RAMA YADAV L1 | M/S TANVI CONTRACTOR L6 | LEKHRAJ L5 | M/s CHANDRA PAL SINGH L4 | M/S M. S INFRACON L7 | RR CONSTRUCTION L2 | Jagannath prasad L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site. | 1,784 | M2 | 22.57 ₹40,264.88 | 25 ₹44,600 | 27.3 ₹48,703.20 | 5 ₹8,920 | 15 ₹26,760 | 19.7 ₹35,144.80 | 25.51 ₹45,509.84 |
| 2.00 | Cleaning thick bushes and thorny jungle without uprooting. | 7,137 | M2 | 2.83 ₹20,197.71 | 4.2 ₹29,975.40 | 3.43 ₹24,479.91 | 5 ₹35,685 | 6 ₹42,822 | 5.5 ₹39,253.50 | 3.21 ₹22,909.77 |
| 3.00 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 3,404 | M3 | 24.5 ₹83,398 | 33.1 ₹1.1 L | 32 ₹1.1 L | 38 ₹1.3 L | 38.9 ₹1.3 L | 25 ₹85,100 | 30.62 ₹1.0 L |
Tender Value
₹2.8 L
EMD Value
₹6,000
Closing Date
25 May 2026, 11:00 amClosed
Executive Engineer
L.M.B.D.G.C., Mathura
Internal Clearance Work of Alipur Drain Between Km 4.000 to Km. 8.400
2026_UPIDC_1148556_9
01EE Lower Mat 2026-27
Open Tender
Civil Works - Canal
10 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹6,000
2 Jun 2026
20 May 2026
25 May 2026
20 May 2026
25 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site. | 1,784 | M2 | - | - |
| 2 | Cleaning thick bushes and thorny jungle without uprooting. | 7,137 | M2 | - | - |
| 3 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 3,404 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2150021.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid