Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹82,022.40Admitted-Finance | -4.00% | ₹82,022.40 | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical disqualified |
Tender Value
₹85,440
EMD Value
₹4,272
Closing Date
12 Feb 2026, 1:00 pmClosed
Executive Engineer MHD Srinagar
Executive Engineer MHD Srinagar
Repairing of central heating system installed at Director School Education
2026_PWDJK_302418_4
MHDS/TS /2025-26/139/e-tendering dt 05.02.2026
Open Tender
Repair and Maintenance Works
10 days
Director School Education
as detailed in nit
4 documents required · 4 mandatory
₹50
Executive Engineer MHD Srinagar
₹4,272
14 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
Opening of the AMW-1 Kcal/hr Hot water 02 Boiler: The job includes opening of the boiler, thoroughly cleaning inside and outside both in case of coil and the shell type, removing of soot and carbon deposits. The inside of the shell be cleaned by circulating through a solution of Max Clean All ether accessories of including burner gun, nozzles, electrodes, the boiler diffuser plate etc have to be dismantled and reassembled of all seals, gaskets, asbestos rope/ sheet/belt, defective nuts and bolts etc. The tools & tackles required for the job and any other consumables shall be provided by the Contractor. Complete Job includes the job of material and labour.
Refractory Works: The job includs replacement of damaged Refractory of Thermax Make AMW-1 Kcal/hr Hot water Boiler. The job includes complete removal of old/damaged refractory and thorough cleaning of refractory surfaces/bases. The job includes providing and making of new refractory of suitable size of the Boiler. The old damaged refractory is to be dumped in the nearest municipal waste dumping site.
Providing,fitting,testing and commissioning of Temperature Controller Meter TC-513 AX-NS207 for AMW-1 Kcal/hr hot water boiler, inclusive of replacement of damaged or malfunctioning part to ensure proper operation.
Providing and Fitting of Photocells of burner assembly for AMW-1 Kcal/hr Hot water Boiler inclusive of replacement of damaged or malfunctioning part to ensure proper of operation.
Replacement of Burner Nozzels of appropriate Size by new one for 1 Kcal/hr Hot water Boiler
Providing and fixing of sequence controller inclusive of replacement of damaged or malfunctioning part to ensure proper operation
Replacement of damaged oil pump by new one for 1 Kcal/hr Hot water Boiler.
Providing of diesel pipes 1.5 m long for 1 Kcal/hr Hot water Boiler
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 0.56 MB
BOQ_981372.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid