Loading…
Loading…
Tender Value
₹3.4 Cr
EMD Value
₹3.2 L
Closing Date
4 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
GSUBKN
17 conditions · 5 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Each tenderer at the time of tendering for supply of ballast shall submit the following:- (a) Test report of impact value, abrasion value, and water absorption value from reputed laboratory/institution as mentioned in the list in Annexure-D(attached in special condition of the contract). These shall have to be in accordance with IS codes as under: Aggregate abrasion value test..........IS: 2386 part IV 1963. Aggregate impact value test ............IS: 2386 Part IV 1963 Water absorption test ......................IS: 2386 Part III 1963.
The tenderer shall also furnish an undertaking as Annexure- E(attached in special condition of the contract) incorporated in the tender document that the ballast supply at all times will confirm to specification for track ballast as specified by Railway without these the tender will be summarily rejected.
The test viz. determination of Abrasion value, Impact value and water absorption should be got done through approved laboratories or Railway's own laboratories.(List in Annexure-D attached in special condition of the contract). It may be noted by tenderer/s that they are required to submit the test report of the stone ballast, along with their offer, issued from the approved laboratory as listed in the tender documents. The tenderer/s is/are also required to mention the name of the quarry from which he/they are intended to supply the ballast either in the ballast testing report of approved laboratories .Test report should not be older than 6 (Six) months from the date of opening of tender".
3 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1.The Income tax will be deducted at source at the prescribed enforceable rate for the item involving labour component only on terms of latest instructions of Ministry of Finance.2.The rates should be quoted including all lead & Lift, handling, re-handling and crossing of track, Canal, Nallah etc. Nothing-extra payment other than accepted rates will be made under any circumstances. The quoted rates shall include all expenditure for any special arrangement, if required, such as mechanical equipment, tools and plants etc.3.The contract shall be governed by General condition of Contract 2022. (Amended up to date) 4.The ballast shall be procured strictly as per specifications IS/RDSO-GE/0001:2023,February-2023 and Tender Condition and Instructions to Tenders and amended upto date.5.It will be the responsibility of the contractor to obtain the clearance from ADEN before stacking of the ballast at any location. The ADEN after inspecting the site and being satisfied regarding leveling of the site, will allow the stacking of ballast to the contractor in writing. A record of clearance given by the ADEN will be kept in which location wise plan of the stacking area indicated. 6.The quantities mentioned above are approximate and may vary according to the needs of Railway, variation thereof to the extant of 25% will not be the basis of any claim against the Railway.7.The location of work may be changed by the Rly. Administration under DyCE/GSU,N.W.Rly., Bikaner and no extra payment on this account will be made to the contractor.8. Contractor/ suppliers/ service providers/ parties shall registered their firms under GSTIN (GST Identification Number).
Supply of stone Ballast(machine crushed) 65mm gauge as per specification of RDSO track ballast of IS/RDSO-GE/0001:2023 February 2023 in connection with Track work in c/w Development of Coaching Maintenance Facilities, stabling lines, Marshalling line, and sick/fit coaches line in Hisar yard.
15R-2025-GSU-BKN~NWR
15R-2025-GSU-BKN
Open
Works - General
12 Months
Bikaner, Rajasthan
₹0
₹3.2 L
4 Feb 2026
12 Jan 2026
21 Jan 2026
3 items across 1 schedule · ₹3,40,87,950 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| supply and stacking of machine Ballast conforming to RDSO (IRS-GE-1) with latest correction depot or nominated location. nearest quarry mentioned is only for the purpose items for preparation schedule, based on between nearest quarry points and will not affect during physical supply in specification is met fully. | in of of the and the any | — | — | — | |
| 1 | nearest quarry is more than km | 40 cum | 22500.00 | 1,155.66 | 2,60,02,350 |
| 2 | nearest quarry is more than 250 km | cum | 4000.00 | 2,021.4 | 80,85,600 |
| Schedule total | ₹3,40,87,950 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .