| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC 4 35 B EAST STREET JAMBULINGAPURAM K VELAYUTHAPURAM POST KALUGUMALAI VIA KAYATHAR TALUK THOOTHUKUDI DISTRICT 628 | THOOTHUKUDI | TAMIL NADU | ₹3.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 CrRejected-AOC NO 5 255 G E B COLONY A SALAIPUDUR KOVILPATTI TUTICORIN 628 502 | KOVILPATTI | TUTICORIN | TAMIL NADU | 628502 | ₹4.2 Cr | L2 | Rejected-AOC REJECTED |
| 3 | L3₹4.4 CrRejected-AOC 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | ₹4.4 Cr | L3 | Rejected-AOC REJECTED |
| 4 | Rejected-Technical | - | - | Rejected-Technical BQR D NOT SATISFIED |
| 5 | Rejected-Technical | - | - | Rejected-Technical BQR CONDITIONS A and B NOT SATISFIED |
| Sl No | Description | Qty | Unit | S S AND CO L3 | AYYAPPAN AND CO L2 | vbsminfraprivatelimited L1 |
|---|---|---|---|---|---|---|
| 1.00ABSTRACT | ||||||
| 1.01 | Schedule A (Civil and Erection works) | 1 | No | 1,20,33,370 ₹1.2 Cr | 1,00,33,773 ₹1.0 Cr | 1,16,00,689.4 ₹1.2 Cr |
| 2.00 | Schedule B (Supply of Materials) | 1 | No | 2,52,52,000 ₹2.5 Cr | 2,52,21,620 ₹2.5 Cr | 2,17,13,066.2 ₹2.2 Cr |
| 3.00 | Applicable GST Amount (Total GST Amount @18%) | 1 | No | 67,11,366.6 ₹67.1 L | 63,45,970.74 ₹63.5 L | 59,96,476.01 ₹60.0 L |
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
16 Mar 2026, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Erection of 110 KV DC line on DC tower by making LILO of the existing Pudukkottai - Thirumayam 110 KV feeder to the proposed Kadiyapatti 110KV SS
2026_EB_667787_1
CE/TP-II/TRY/C-121/25-26
Open Tender
Civil Works
210 days
KADIYAPPTI
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹4.2 L
Yes
1 Jun 2026
27 Feb 2026
17 Mar 2026
27 Feb 2026
16 Mar 2026
3 Mar 2026
ABSTRACT
Schedule A (Civil and Erection works)
Schedule B (Supply of Materials)
Applicable GST Amount (Total GST Amount @18%)
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE A - Civil and Erection works (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Civil works
Clearing light jungle including cost of clearing away the site with all labour, lead, lift , T&P etc complete.
Conducting check survey,pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead lift etc complete.
Earthwork excavation in hard stiff clay, black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earthwork excavation in soft disintegrated rock or kankar not requiring blasting.
Earthwork excavation in MR and DMR requiring blasting.
Earthwork excavtion in hard rock measured in solid including blasting and stacking
Setting of stub and cleat,template including assembling of template setting of stub ,cleat and dismantling of template and shifting the template from loc to loc and reassembling including cost of template , all labour, T&P , lead, lift , fabrication charges etc complete.
KCR wet
HCR wet
GCR wet
PCC1:2:4 using 20mm metal for foundation for tower concrete without form work including cost of all materials, lead, lift , etc complete .
PCC1:2:4 using 20mm metal for foundation, Chimney tower concrete with steel frustum box and chimney box work including cost of all materials, lead, lift , etc complete .
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Providing pipe type earthing for each tower location including extra excavation in foundation pits of towers for fixing 3m long 25mm dia GI "B" class earthpipe and GI wire 2.40m long with legs on both terminals for connecting the GI pipe with tower leg ,refilling with excavated earth mixed with solt and charcoal as per standard specification including all cost of 25 mm GI B class pipe as per IS fabrication of legs for connection arrangement materials,transport, all labours, leads, lifts etc complete.
Providing earthing arrangements for terminal tower including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub including all cost of materials lead lift etc complete as per standard specifications.
Removal of surplus earth in a low lying area to a average distance of 200m by head load.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges,labour, fuel, oil, transport etc complete.
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
Erection of GI tower/tower extension parts ,square cross arm , DP structures with bolt & nuts including sorting out of tower parts as per the specification and punching of bolt & nuts, final checking and all other incidental charges for erection,including cost of all T&P,labour, lead, lift etc complete. as per approved drawing , BOM and specification. The rectification of defects found by operation staff during handing over of line to be done at free of cost...
Labour charges for hoisting of 7 units of 90 KN ordinary disc insulators with necessary hardware fittings for panther including all cost of labour,lead, lift, T & P etc complete.
With PA rod
Without PA rod
Labour charges for hoisting of 8 units of 120 KN ordinary disc insulators with necessary hardware fittings for panther including all cost of labour,lead, lift, T & P etc complete.
Labour charges for stringing of 6Nos of ACSR Panther conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P ,moving the drum to work spot all labour ,lead, lift, etc complete in all respects .
Continuous span without LC
Single Span without LC
Single Span with LC
Erection of OPGW - 48 Fibre with all accessories including all T&Ps, testing and commissioning cost of labour, lead, lift, etc., complete.
Laying , erection, testing and commissioning of 48core optic fiber (ADSS) cable with joints 40mm dia HDPE duct hose pipe, FODP and all accessories including all T&Ps,cost of labour, lead, lift, etc., complete.
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift,etc complete .
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials,labour, lead lift etc complete
Labour charges for fixing of number plates, danger board,phase plate & name board including all cost of labour transport,lead, lift,etc complete.
Labour charges for cutting and clearing away from site
Large Tree
Small Tree
Providing temporary guys wherever necessary including excavation, burying out of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials,lead,lift,labour etc complete.
Lowering the HT/LT Line during stringing of power conductor and earthwire after restringing the same in original position including labour,lead ,lift etc complete.
Providing special type trussles for Minor and major road crossing including cost of all materials, lead, lift etc complete
Land plan schedule for this transmission line towards compensation for the land in the route adopted including detailed survey of land in transmission line in coordination with revenue department preparation of land plan schedule with drawing in FMB sketch including cost of hire charges for all instrument ,labour etc ,as per the instruction of TANTRANSCO engineers incharge at site complete .
Dismantling of existing tower and devoluted to store including cost of all labour charges, lead , lift , transport etc complete.
Dismantling of existing suspension insulators along with fittings and devoluted to store including cost of all labour charges, lead , lift , transport etc complete.
Releasing, lowering and restringing of existing 3nos panther conductor along with insulators , fittings including all labour, lead,lifts,T&P,etc complete. Under LC..
Item Rate BoQ
BoQ_Ver4.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE B Supply of Materials (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)
NUMBER #
Supply of Materials
Supply of GI tower/extension parts/DP structures/ X arm including stub & cleat in accordance with boards design as per approved drawing and BOM as detailed in this specification including cost of all materials ,labour, transport,lead, lift etc complete .
MS Tower parts.
Supplying of hot dip Galvanising & bolt & nuts,stepbolt with various sizes of required length,Spring Washers as per relevant latest IS Specification including cost of Transport charges and all lead,lift,etc, complete as as per approved drawing and BOM as detailed in this specification .
ACSR Panther conductor
OPGW 48fibre with all accessories.
90 KN ordinary disc insulator
120 KN ordinary disc insulator
Supply of Hardware fittings as per IS and technical specification including transport charge etc complete suitable for panther conductor, GI Earth wire (7/3.55mm) .
Single Suspension fitting for panther
Single Tension fitting for Panther
SB damber for panther
MSJ for panther
Repair sleeve for panther
PA rod
Aluminium earthbond
Number plate
Phase plate set of three
Danger board
Name Board
ADSS 48 f with all accessories
D Shackle
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_802286.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid