Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
20 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Deepening and Improvements to the Ooranies_ 4 nos in AGAMT-II-2021-22 Village panchayats of Thirumangalam Block in Madurai District in Package no.Tmg_01
2022_RDTN_238482_2
568/2022/D7 /Tmg01/24.06.22
Open Tender
Civil Works
Item Rate
180 days
THIRUMANGALAM
REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹0
₹33,000
1 Aug 2022
5 Jul 2022
20 Jul 2022
6 Jul 2022
20 Jul 2022
6 Jul 2022
Amount
Clearing the light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the stregthening of the bund and the ground shall be left in a perfectly clean conditon etc. complete.
Earth work excavation in all soils except hard rock for the formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc.complete.
Production wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Bathing Ghat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Name Board charges
Clearing the light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the stregthening of the bund and the ground shall be left in a perfectly clean conditon etc. complete.
Earth work excavation in all soils except hard rock for the formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc.complete.
Leading Channel & Sluice Repair
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Cement concrete 1:2:4 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Providing and fixing best countrywood plug with 50 mm dia MS screw gearing rod 4 m height support on 2 Nos.ISMB 125 RJ Joists of 1.5 m length and guide beam 1 no of the same size resting in turn of MS base plate of 50mmx30mm size 6 mm thick with cast iron hexagonal head set and a collar plate of 300mmx 300mmx6mm thick fixed with necessary bolts and nuts and other fixtures etc.complete.
Provision for Name Board charges
Clearing the light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the stregthening of the bund and the ground shall be left in a perfectly clean conditon etc. complete.
Earth work excavation in all soils except hard rock for the formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc.complete.
Production wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Bathing Ghat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Sluice Repair
Diamandling , clearing away stack materials
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 40 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Cement concrete 1:2:4 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Providing and fixing best countrywood plug with 50 mm dia MS screw gearing rod 4 m height support on 2 Nos.ISMB 125 RJ Joists of 1.5 m length and guide beam 1 no of the same size resting in turn of MS base plate of 50mmx30mm size 6 mm thick with cast iron hexagonal head set and a collar plate of 300mmx 300mmx6mm thick fixed with necessary bolts and nuts and other fixtures etc.complete.
INLET
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supply and fixing of 600mm Np2 RCC Pipe
Labour and Fixing charges for RCC Pipe
Provision for Name Board charges
Clearing the light jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the stregthening of the bund and the ground shall be left in a perfectly clean conditon etc. complete.
Earth work excavation in all soils except hard rock for the formation of bund with lead of 0-100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc.complete.
Production wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Bathing Ghat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with Cement Morter 1:4 mix 20 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Sluice Repair
INLET
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Cement concrete 1:3:6 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supply and fixing of 600mm Np2 RCC Pipe
Labour and Fixing charges for RCC Pipe
Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K ELAMPARITHI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .