Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.5 LAccepted-AOC ANURAGPUR PO PANAGARH BAZAR DIST BURDWAN WEST BENGAL 713 148 | PANAGARH BAZAR | BURDWAN | WEST BENGAL | 713148 | ₹40.5 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹44.7 L+₹4.2 L (10.3%)Rejected-Finance VILL PO KOTA VIA PANAGARH BAZAR DIST BURDWAN WB PIN 713148 | BURDWAN | BURDWAN | WEST BENGAL | 713148 | ₹44.7 L+₹4.2 L (10.3%) | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹45.3 L+₹4.8 L (11.7%)Rejected-Finance | ₹45.3 L+₹4.8 L (11.7%) | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹46.5 L+₹6.0 L (14.7%)Rejected-Finance VILLAGE PO BUD BUD DIST BURDWAN WB PS BUD BUD PIN 713403 | BUD BUD | BURDWAN | WEST BENGAL | 713403 | ₹46.5 L+₹6.0 L (14.7%) | L4 | Rejected-Finance Other than lowest bidder |
| 5 | L5₹47.2 L+₹6.6 L (16.3%)Rejected-Finance | ₹47.2 L+₹6.6 L (16.3%) | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | UNIQUE ENTERPRISE L1 | NATIONAL CONSTRUCTION CO L2 | S.P.S. SUPPLIERS L3 | M/S DYNAMIC INDIA (PROJECT) CONSTRUCTION L5 | K L BAKSHI AND SONS L7 | M/s Raj Kumar Chopra L8 | SANJAY KUMAR SUPAN L6 | rahul enterprise L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Mechanized cleaning of vegetation and grass around the Runway/Taxi track and link roads of Runway within Air Force Station Panagarh by providing two Nos tractor except sundays and holidays not less than 35 H.P capacity with 'D' type Jungle jim having steel chain & in built gear box (including each tractor having 01 No driver having valid licence, 01 No helper, necessary fuel, oil, lubricant, etc and removing of debrises, stone metal etc from work at site) all as specified and as directed by Engineer-in-charge.
Note:-
(a) When the running hours is not a full hour or in multiple of a hour but involves a fraction of a hour, then payment payble for that fraction shall be proportional to the quarter hours involved.
(b) Daily log sheet/log book to be maintained commensurate with users duly signed by SATCO. A certificate as per Appx 'A' enclosed to the tender documents, and to be enclosed claiming running payment/Final Bill
(c) No claim shall be entertained if the tractor is not requied for full working days or any days as directed by Engr-in-charge and not ordered by users.
(d) Additional tractors per day may be ordered as and when required and directed. Contractor to arrange accordingly without any extra cost. Payment shall be made at contract rate per tractor.
(e) Detail measurement with location entered in measurement book before payment.
(f) Document of tractor, valid driving licence of driver and document of helper & driver shall be submit before commencement of work.
(g) Unit rate quoted by the contractor for per hour for one tractor only. | 4,800 | Per hour | 350 ₹16,80,000 Lowest | 380 ₹18,24,000 | 372 ₹17,85,600 | 392 ₹18,81,600 | 425 ₹20,40,000 | 600 ₹28,80,000 | 402 ₹19,29,600 | 385 ₹18,48,000 |
| 2.00 | Mechanized cleaning of vegetation and grass around the Runway/Taxi track and link roads of Runway within Air Force Arjan Singh by providing four Nos bush cutter (four stroke not and less than 1.00 KW engine power and two blade cutter type) except sundays and holidays (including each bush cutter having 01 No operator, necessary fuel, oil, lubricant, etc and removing of debrises, stone metal etc from work at site) all as specified and as directed by Engineer-in-charge including removing of material obtained from cutting & cleaning.
Note : (i) When the running hours is not a full hour or in multiple of a hour but involves a fraction of a hour, then payment payble for that fraction shall be proportional to the quarter hours involved.
(ii) Daily log sheet/log book to be maintained commensurate with users duly signed by SATCO. A certificate as per Appx 'A' enclosed to the tender documents, and to be enclosed claiming running payment/Final Bill
(iii) No claim shall be entertained if the T&P is not requied for full working days or any days as directed by Engr-in-charge and not ordered by users.
(iv) Additional bush cutter per day may be ordered as and when required and directed. Contractor to arrange accordingly without any extra cost. Payment shall be made at contract rate per unit.
(v) Detail measurement with location entered in measurement book before payment.
(vi) Unit rate quoted by the contractor for per hour for one bush cutter only. | 8,640 | Per hour | 120 ₹10,36,800 Lowest | 135 ₹11,66,400 | 136 ₹11,75,040 | 142 ₹12,26,880 | 145 ₹12,52,800 | 160 ₹13,82,400 | 152 ₹13,13,280 | 142 ₹12,26,880 |
| 3.00 | Systematically cleaning and removal of soil/muddy soil/grass/vegitation etc by mechanical means (Hydraulic exacavator and tractor) or manually in saucer/open drains (appox 10.00 mtr wide and n. exceeding 1.5 m in depth) including dressing of sides and cleaning of bottoms, lift upto 1.5m, including getting out the excavated soil etc.and disposal of surplus excavated soil etc. as directed within a lead of 500m from the drain complete all as specified and directed by Engineer-in-Charge. | 10,000 | RM | 30 ₹3,00,000 Lowest | 38 ₹3,80,000 | 50 ₹5,00,000 | 45 ₹4,50,000 | 56 ₹5,60,000 | 120 ₹12,00,000 | 52 ₹5,20,000 | 42 ₹4,20,000 |
| 4.00 | Systematically cleaning of covered drains/culvert by removal of muddy soil/grass/vegitation etc. n exceeding 2m in width and 1.5 in depth by mechanical means/ manually, removing of all mud/soil deposited in drain by manually including removal of covers and refixing after cleaning also removal of mud/material etc. to a distance n exceeding 500m complete all as specified and directed by Engineer-in-Charge. | 1,000 | RM | 50 ₹50,000 Lowest | 60 ₹60,000 | 58 ₹58,000 | 50 ₹50,000 Lowest | 62 ₹62,000 | 120 ₹1,20,000 | 55 ₹55,000 | 62 ₹62,000 |
| 5.00 | M&L for Brick work with fly ash bricks straight or curved on plan exc 6 m mean radius, built in cement mortar (1:6) after demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings complete all as specified and directed. | 15 | Cum | 5,500 ₹82,500 Lowest | 6,000 ₹90,000 | 7,000 ₹1,05,000 | 6,800 ₹1,02,000 | 7,500 ₹1,12,500 | 11,000 ₹1,65,000 | 7,200 ₹1,08,000 | 6,200 ₹93,000 |
| 6.00 | M&L for PCC type C1, (1:3:6) (using 20mm graded crushed stone aggregate) as in coping, kerb, benching, hold fast, water troughs, bed block and the like including weathering, slightly rounded or chamfered angle and throating including necessary form work complete all as specified and directed. | 1.5 | Cum | 5,500 ₹8,250 Lowest | 6,000 ₹9,000 | 6,800 ₹10,200 | 6,500 ₹9,750 | 6,000 ₹9,000 | 8,000 ₹12,000 | 6,200 ₹9,300 | 6,500 ₹9,750 |
| 7.00 | Taking down cement plaster, any description on brick or stone or cement concrete surfaces including racking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed. | 50 | Sqm | 10 ₹500 | 8 ₹400 Lowest | 15 ₹750 | 10 ₹500 | 10 ₹500 | 20 ₹1,000 | 15 ₹750 | 12 ₹600 |
| 8.00 | M&L for rendering 15 mm thick on fair faces of brick wall or concrete surface in cement mortar (1:4), mixed with and including water proofing compound as per manufacturer's instruction finished even and smooth without using extra cement complete all as specified and directed.
(Note: Water proofing compound shall be measured and paid separately under relevant items in this schedule.) | 160 | Sqm | 200 ₹32,000 Lowest | 210 ₹33,600 | 250 ₹40,000 | 242 ₹38,720 | 260 ₹41,600 | 400 ₹64,000 | 250 ₹40,000 | 222 ₹35,520 |
| 9.00 | Mechanized levelling of undulation portion, lifting of drain covers and clearing of debis around the Runway/Taxi track and roads of Runway within Air Force Station Panagarh by providing 01 No. BACKHOE LOADER not less than 0.55 cum GP of loader performance (including 01 operator, 01 NO helper, necessary fuel, oil and lubricant etc) all as specified and directed by Engineer-in-Charge as and when required basis.
Note :-
(a) When the running hours is not a full hour or in multiple of a hour but involves a fraction of a hour, then payment payble for that fraction shall be proportional to the quarter hours involved.
(b) Daily log sheet/log book to be maintained commensurate with users duly signed by SATCO. A certificate as per Appx 'A' enclosed to the tender documents, and to be enclosed claiming running payment/Final Bill
(c) No claim shall be entertained if the backhoe loader is not requied for full working days or any days as directed by Engr-in-charge and not ordered by users.
(d) Additional backhoe loader per day may be ordered as and when required and directed. Contractor to arrange accordingly without any extra cost. Payment shall be made at contract rate per backhoe loader.
(e) Detail measurement with location entered in measurement book before payment.
(f) Document of backhoe loader, valid driving licence of driver and document of helper & driver shall be submit before commencement of work.
(g) Unit rate quoted by the contractor for per hour for one backhoe loader only. | 87 | Per hour | 1,000 ₹87,000 Lowest | 1,020 ₹88,740 | 1,088 ₹94,656 | 1,050 ₹91,350 | 1,150 ₹1,00,050 | 2,000 ₹1,74,000 | 1,120 ₹97,440 | 1,050 ₹91,350 |
| 10.00 | Scrapping of vegetation and grass around the Runway/Taxi track and link roads of Runway within Air Force Station Arjan Sing by providing four Nos person with the help of kassi/shovel/pick axe/sickle/Khurpa except sundays and holidays and removing of debrises, stone metal etc from work at site all as specified and as directed by Engineer-in-charge.
(a) When the running hours is not a full hour or in multiple of a hour but involves a fraction of a hour, then payment payble for that fraction shall be proportional to the quarter hours involved.
(b) Daily log sheet/log book to be maintained commensurate with users duly signed by SATCO. A certificate as per Appx 'A' enclosed to the tender documents, and to be enclosed claiming running payment/Final Bill
(c) No claim shall be entertained if the work is not requied for full working days or any days as directed by Engr-in-charge and not ordered by users.
(d) Detail measurement with location entered in measurement book before payment.
(e) Unit rate quoted by the contractor for per hour is for one person only. | 8,640 | Per hour | 90 ₹7,77,600 | 95 ₹8,20,800 | 88 ₹7,60,320 Lowest | 100 ₹8,64,000 | 105 ₹9,07,200 | 150 ₹12,96,000 | 90 ₹7,77,600 | 100 ₹8,64,000 |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
25 Jul 2026, 6:00 pmClosed
GE AF PANAGARH
GE AF PANAGARH MES AF STATION PANAGARH PO AF STATION WEST BENGAL 713155
CUTTING OF GRASS AND ALLIED MISC B/R WORKS AT AIR FORCE STATION ARJAN SINGH PANAGARH UNDER GE (AF) PANAGARH
2026_MES_765290_2
C/8883/E8
Open Tender
Civil Works - Others
Item Rate
365 days
AF STATION PANAGARH
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE AF PANAGARH
₹1 L
11 Aug 2026
11 Jul 2026
27 Jul 2026
11 Jul 2026
25 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Mechanized cleaning of vegetation and grass around the Runway/Taxi track and link roads of Runway within Air Force Station Panagarh by providing two Nos tractor except sundays and holidays not less than 35 H.P capacity with 'D' type Jungle jim having steel chain & in built gear box (including each tractor having 01 No driver having valid licence, 01 No helper, necessary fuel, oil, lubricant, etc and removing of debrises, stone metal etc from work at site) all as specified and as directed by Engineer-in-charge.
Note:-
(a) When the running hours is not a full hour or in multiple of a hour but involves a fraction of a hour, then payment payble for that fraction shall be proportional to the quarter hours involved.
(b) Daily log sheet/log book to be maintained commensurate with users duly signed by SATCO. A certificate as per Appx 'A' enclosed to the tender documents, and to be enclosed claiming running payment/Final Bill
(c) No claim shall be entertained if the tractor is not requied for full working days or any days as directed by Engr-in-charge and not ordered by users.
(d) Additional tractors per day may be ordered as and when required and directed. Contractor to arrange accordingly without any extra cost. Payment shall be made at contract rate per tractor.
(e) Detail measurement with location entered in measurement book before payment.
(f) Document of tractor, valid driving licence of driver and document of helper & driver shall be submit before commencement of work.
(g) Unit rate quoted by the contractor for per hour for one tractor only. | 4,800 | Per hour | - | - |
| 2 | Mechanized cleaning of vegetation and grass around the Runway/Taxi track and link roads of Runway within Air Force Arjan Singh by providing four Nos bush cutter (four stroke not and less than 1.00 KW engine power and two blade cutter type) except sundays and holidays (including each bush cutter having 01 No operator, necessary fuel, oil, lubricant, etc and removing of debrises, stone metal etc from work at site) all as specified and as directed by Engineer-in-charge including removing of material obtained from cutting & cleaning.
Note : (i) When the running hours is not a full hour or in multiple of a hour but involves a fraction of a hour, then payment payble for that fraction shall be proportional to the quarter hours involved.
(ii) Daily log sheet/log book to be maintained commensurate with users duly signed by SATCO. A certificate as per Appx 'A' enclosed to the tender documents, and to be enclosed claiming running payment/Final Bill
(iii) No claim shall be entertained if the T&P is not requied for full working days or any days as directed by Engr-in-charge and not ordered by users.
(iv) Additional bush cutter per day may be ordered as and when required and directed. Contractor to arrange accordingly without any extra cost. Payment shall be made at contract rate per unit.
(v) Detail measurement with location entered in measurement book before payment.
(vi) Unit rate quoted by the contractor for per hour for one bush cutter only. | 8,640 | Per hour | - | - |
| - | Systematically cleaning and removal of soil/muddy soil/grass/vegitation etc by mechanical means (Hydraulic exacavator and tractor) or manually in saucer/open drains (appox 10.00 mtr wide and n. exceeding 1.5 m in depth) including dressing of sides and cleaning of bottoms, lift upto 1.5m, including getting out the excavated soil etc.and disposal of surplus excavated soil etc. as directed within a lead of 500m from the drain complete all as specified and directed by Engineer-in-Charge. | 10,000 | RM | - | - |
| - | Systematically cleaning of covered drains/culvert by removal of muddy soil/grass/vegitation etc. n exceeding 2m in width and 1.5 in depth by mechanical means/ manually, removing of all mud/soil deposited in drain by manually including removal of covers and refixing after cleaning also removal of mud/material etc. to a distance n exceeding 500m complete all as specified and directed by Engineer-in-Charge. | 1,000 | RM | - | - |
| - | M&L for Brick work with fly ash bricks straight or curved on plan exc 6 m mean radius, built in cement mortar (1:6) after demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings complete all as specified and directed. | 15 | Cum | - | - |
| - | M&L for PCC type C1, (1:3:6) (using 20mm graded crushed stone aggregate) as in coping, kerb, benching, hold fast, water troughs, bed block and the like including weathering, slightly rounded or chamfered angle and throating including necessary form work complete all as specified and directed. | 1.5 | Cum | - | - |
| - | Taking down cement plaster, any description on brick or stone or cement concrete surfaces including racking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed. | 50 | Sqm | - | - |
| - | M&L for rendering 15 mm thick on fair faces of brick wall or concrete surface in cement mortar (1:4), mixed with and including water proofing compound as per manufacturer's instruction finished even and smooth without using extra cement complete all as specified and directed.
(Note: Water proofing compound shall be measured and paid separately under relevant items in this schedule.) | 160 | Sqm | - | - |
| - | Mechanized levelling of undulation portion, lifting of drain covers and clearing of debis around the Runway/Taxi track and roads of Runway within Air Force Station Panagarh by providing 01 No. BACKHOE LOADER not less than 0.55 cum GP of loader performance (including 01 operator, 01 NO helper, necessary fuel, oil and lubricant etc) all as specified and directed by Engineer-in-Charge as and when required basis.
Note :-
(a) When the running hours is not a full hour or in multiple of a hour but involves a fraction of a hour, then payment payble for that fraction shall be proportional to the quarter hours involved.
(b) Daily log sheet/log book to be maintained commensurate with users duly signed by SATCO. A certificate as per Appx 'A' enclosed to the tender documents, and to be enclosed claiming running payment/Final Bill
(c) No claim shall be entertained if the backhoe loader is not requied for full working days or any days as directed by Engr-in-charge and not ordered by users.
(d) Additional backhoe loader per day may be ordered as and when required and directed. Contractor to arrange accordingly without any extra cost. Payment shall be made at contract rate per backhoe loader.
(e) Detail measurement with location entered in measurement book before payment.
(f) Document of backhoe loader, valid driving licence of driver and document of helper & driver shall be submit before commencement of work.
(g) Unit rate quoted by the contractor for per hour for one backhoe loader only. | 87 | Per hour | - | - |
| - | Scrapping of vegetation and grass around the Runway/Taxi track and link roads of Runway within Air Force Station Arjan Sing by providing four Nos person with the help of kassi/shovel/pick axe/sickle/Khurpa except sundays and holidays and removing of debrises, stone metal etc from work at site all as specified and as directed by Engineer-in-charge.
(a) When the running hours is not a full hour or in multiple of a hour but involves a fraction of a hour, then payment payble for that fraction shall be proportional to the quarter hours involved.
(b) Daily log sheet/log book to be maintained commensurate with users duly signed by SATCO. A certificate as per Appx 'A' enclosed to the tender documents, and to be enclosed claiming running payment/Final Bill
(c) No claim shall be entertained if the work is not requied for full working days or any days as directed by Engr-in-charge and not ordered by users.
(d) Detail measurement with location entered in measurement book before payment.
(e) Unit rate quoted by the contractor for per hour is for one person only. | 8,640 | Per hour | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_871206.xls
BOQ • 1.96 MB
Tender8883R.pdf
Tender Documents • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .