Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 LAccepted-Finance | 1 | Accepted-Finance Quoted value is lesser than the estimated value and lesser than L2.Hence,Accepted. | |
| 2 | 2₹2.7 L+₹4,474 (1.69%)Rejected-Finance | 2 | Rejected-Finance Quoted value is higher than the L1 value. Hence, Rejected. |
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
6 Nov 2023, 3:00 pmClosed
Assistant Commissioner Zone 4,Tiruppur Corporation
Zone 4 Office,Andipalayam,Tiruppur City Municipal Corporation
Providing and Laying of water supply distribution main Velliyangadu 1st street and Citharakar nagar and Construction of SWD at Velliyangadu in ward no 55.
2023_MAWS_383860_29
02/2023-24/Z4
Open Tender
Coal
Works
90 days
Zone 4, Tiruppur City Municipal Corporation
Please Refer Tender Documents
3 documents required · 3 mandatory
₹0
₹5,800
19 Mar 2024
31 Oct 2023
6 Nov 2023
31 Oct 2023
6 Nov 2023
31 Oct 2023
Amount
Earth work excavation and depositing on bank with initial lead and lift as initial of 10 M and lift of 2 M in narrow trenches for laying of pipes for water supply works in Hard stiff clay, stiff black cotton, hard red earth shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravel soil including refilling the sides of foundation in layer of 15m thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification.
Supply of PVC pipes 6Kg/cm² as per standard specification.
Supply of 2" PVC (63mm) Pipes
Supply of G.M Gate Valves as per is Bs 5154 as directed by the departmental officers etc., complete complying with standard specification.
Supply of 2" (65 mm) Gate Valves
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment jointing with PVC couplers with cement paste and testing to the required pressure including conveyance of water for filling during testing.
Supply of 2" PVC (63mm) Pipes
Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete.
Plain Cement concrete 1:4:8 [one cement, four M-sand and eight course aggregates] using 40mm size Hard Broken/Machine crushed Granite Stone Jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Supplying and erecting centering including necessary supports for the plane surfaces such as Drainage & Culvert Retaining walls etc., using mild steel sheets of size 90cm x 60cm and BG 10 stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding supported by casurina props of 10cm to 13cm dia spaced at suitable intervals etc., complete complying with standard specification.
Plain Cement concrete in 1:3:6 [one cement, three M-sand and six course aggregate] using 20mm and 40mm size Hard Broken/Machine crushed Granite Stone Jelly at 1/3 part and 2/3 part respectively including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification.
Plastering with cement mortar 1:4 mix (one cement four P-sand), 20mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification.
Plastering with cement mortar 1:4 mix (one cement four P-sand), 12mm thick in all floors using clean screened M-Sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification.
Add GST @ 18%
JAGANATHAN & CO
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .