| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹4.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.7 CrAdmitted-Finance | ₹4.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹5.7 CrAdmitted-Finance B 4 301 CHLORIS APPARTMENT SECTOR 19 MATHURA ROAD FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | ₹5.7 Cr | L3 | Admitted-Finance |
| 4 | L4₹5.9 CrAdmitted-Finance B4 301 MAHINDRA CHLORIS MATHURA ROAD FARIDABAD HARYANA | FARIDABAD | FARIDABAD | HARYANA | ₹5.9 Cr | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical 1 VILLAGE JYOTISAR DISTT KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | aay kay enterprises L2 | M/s Gee Dee Enterprises L3 | Ketan Enterprises L4 | Suresh Kumar L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | `Searching of manholes with metal detector / through pipe internal survey and hiring of JCB machine for excavation and dismantling of RCC slab/footpath and providing requisite labour etc. complete in all respect to the entire satisfaction of Engioneer-in-charge.
Note:-GMDA similar work allotment letter no. GMDA/SEW/2021/80 dated 15.01.2021 item no.03/NS Item copy enclosed Annexure-B` | 100 | Each | 3,000 ₹3 L | 2,000 ₹2 L | 2,020 ₹2.0 L | 1,500 ₹1.5 L |
| 2.00 | Providing CCTV survey by Pan Till Camera with zooming and rotating 360 degree of pipe line after desilting and proper cleaning of existing storm water line for inspection and condition of pipe line and submit the soft/hard copy of the result showing the location and date of survey complete in all respect to the entire satisfaction of engineer-in-charge. | 10,850 | Metre | 200 ₹21.7 L | 200 ₹21.7 L | 210 ₹22.8 L | 200 ₹21.7 L |
| 3.00 | O and M of Master Sewer line of Mirzapur zone of various sizes for 2.5 years (Approx 45.8KM or more) including patrolling and resolve all complaints (overflow, blockage, settlement of sewer line, missing manhole cover with in 04 hrs. of related master sewer line) | 30 | Per Month | 2,50,000 ₹75 L | 6,25,000 ₹1.9 Cr | 6,50,000 ₹1.9 Cr | 2,50,000 ₹75 L |
| 4.00 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026)
21.113.7 For 600mm i/d sewer line | 6,200 | Metre | 2,495 ₹1.5 Cr | 2,100 ₹1.3 Cr | 2,150 ₹1.3 Cr | 2,050 ₹1.3 Cr |
| 5.00 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge
and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item
also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of
workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per
satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026)
21.113.7 For 900mm i/d sewer line | 4,650 | Per Mtr. | 3,800 ₹1.8 Cr | 4,200 ₹2.0 Cr | 4,220 ₹2.0 Cr | 3,900 ₹1.8 Cr |
| 6.00 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 1200 mm i/d sewer line | 60 | Per Metre | 4,680 ₹2.8 L | 5,000 ₹3 L | 5,050 ₹3.0 L | 6,000 ₹3.6 L |
| 7.00 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 450 mm i/d sewer line | 1,500 | Per Metre | 1,755 ₹26.3 L | 1,550 ₹23.3 L | 1,580 ₹23.7 L | 1,500 ₹22.5 L |
Tender Value
₹4.2 Cr
EMD Value
₹8.5 L
Closing Date
14 May 2026, 5:00 pmClosed
SAMUNDER SINGH
Division FMDA
Master Sewerage Scheme Faridabad- Desilting and Cleaning of Balance Master Sewer Lines including Operation and maintenance of all sewer lines for 2.5 years relating to Mirzapur zone Faridabad.
2026_HRY_519650_1
202632C88C6C 08BC 4E47 B3CE 4C79639E5F4B1851002
Open Tender
Civil Works
915 days
Faridabad (MC)
2 documents required · 2 mandatory
₹1,180
₹8.5 L
Yes
16 Jun 2026
5 May 2026
15 May 2026
5 May 2026
14 May 2026
5 May 2026
5 May 2026 - 7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | `Searching of manholes with metal detector / through pipe internal survey and hiring of JCB machine for excavation and dismantling of RCC slab/footpath and providing requisite labour etc. complete in all respect to the entire satisfaction of Engioneer-in-charge.
Note:-GMDA similar work allotment letter no. GMDA/SEW/2021/80 dated 15.01.2021 item no.03/NS Item copy enclosed Annexure-B` | 100 | Each | - | - |
| 2 | Providing CCTV survey by Pan Till Camera with zooming and rotating 360 degree of pipe line after desilting and proper cleaning of existing storm water line for inspection and condition of pipe line and submit the soft/hard copy of the result showing the location and date of survey complete in all respect to the entire satisfaction of engineer-in-charge. | 10,850 | Metre | - | - |
| 3 | O and M of Master Sewer line of Mirzapur zone of various sizes for 2.5 years (Approx 45.8KM or more) including patrolling and resolve all complaints (overflow, blockage, settlement of sewer line, missing manhole cover with in 04 hrs. of related master sewer line) | 30 | Per Month | - | - |
| 4 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026)
21.113.7 For 600mm i/d sewer line | 6,200 | Metre | - | - |
| 5 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge
and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item
also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of
workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per
satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026)
21.113.7 For 900mm i/d sewer line | 4,650 | Per Mtr. | - | - |
| 6 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 1200 mm i/d sewer line | 60 | Per Metre | - | - |
| 7 | De-silting of sewer lines by providing pumping system and temporary bypass arrangements (rising mains) to maintain flow, including removal of silt, sludge and debris using mechanical equipment. The work includes stacking, site cleaning, and safe disposal within municipal limits as directed by Engineer-in-Charge. Item also includes all safety measures (gas detectors, ventilation, barricading, lighting, traffic control, signboards), as guidelines laid in IS- 11972 (1987), insurance of workmen, and provision of all materials, labour, tools, plants, temporary power with standby, removal of malba, and all incidental works complete in all respect as per satisfaction of Engineer-in-Charge.(As per HSR new Haryana GOVT. GAZ., APR. 13, 2026) 21.113.7 For 450 mm i/d sewer line | 1,500 | Per Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_598546.xls
BOQ • 0.28 MB
SD9X8HZ162512.pdf
Additional Documents • 0.59 MB