Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹67.4 LAdmitted-Finance | -0.09% | ₹67.4 L | L1 | Admitted-Finance |
| 2 | L2₹67.8 L+₹39,785.40 (0.59%)Admitted-Finance | +0.50% | ₹67.8 L+₹39,785.40 (0.59%) | L2 | Admitted-Finance |
| 3 | L3₹68.8 L+₹1.4 L (2.09%)Admitted-Finance | +2.00% | ₹68.8 L+₹1.4 L (2.09%) | L3 | Admitted-Finance |
Tender Value
₹67.4 L
EMD Value
₹67,500
Closing Date
4 Jun 2026, 5:00 pmClosed
Add. Chief Executive Officer
Z P Works Division Buldana
IMPROVEMENT OF DIGHI KEDAR ROAD GRAMA. 16 KM 0/00 TO 3/00 (WITH HOTMIX) TQ. NANDURA DIST. BULDHANA
2026_BULDH_1304641_8
01/2026-27
Open Tender
Civil Works
Percentage
180 days
IMPROVEMENT OF DIGHI KEDAR ROAD GRAMA. 16 KM 0/00
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
₹67,500
22 Jun 2026
21 May 2026
6 Jun 2026
21 May 2026
4 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . (SSR 2.07) | 3,688.5 | Sqm | 4 | ₹14,754 |
| 2 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 2,766.38 | Cum | 119 | ₹3,29,198.63 |
| 3 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). | 368.85 | Cum | 1,030.77 | ₹3,80,199.51 |
| 4 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete .
a)40 mm Metal, By breaking Boulders (Hand broken). | 737.7 | Cum | 1,080.77 | ₹7,97,284.03 |
| 5 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . Item no. 50.58 | 737.7 | Cum | 85 | ₹62,704.5 |
| 6 | Supplying Soft murum/ kankar at the road site, including conveying and stacking complete. | 243.44 | Cum | 762.77 | ₹1,85,689.49 |
| 7 | Compacting the sub grade / gravel / size metal (100 mm loose) layers for all widths with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete. . (SSR I No 50.61) | 7,377 | Sqm | 25 | ₹1,84,425 |
| 8 | Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all mataerials, preparing the existing road surface, spreading 40mm. stone metal layers 30% crusher broken metal
+ 70% Hand broken (by breaking rubble obtained by blasting) heating and spraying the bitumen of specified grade @ 1.75 kg/sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface.(VG-30 bulk bitumen rates are considered to arrive at rates) | 7,377 | Sqm | 247.35 | ₹18,24,671.74 |
| 9 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.VG30 bulk bitumen (E CSR Item No.3.3) (Reference No.MORTH 503) | 7,377 | Sqm | 17.86 | ₹1,31,766.13 |
| 10 | Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) (E CSR Item No.4.12) (Reference No.MORTH 511 | 7,377 | Sqm | 205.29 | ₹15,14,424.33 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
8_dighi.pdf
Tender Documents • 0.91 MB
BOQ_2239643.xls
BOQ • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .