| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹17.7 L+₹1.2 L (7.49%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹21.0 L+₹4.6 L (28.1%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CRESCENT ELECTRICAL ENGINEERS L3 | M/S NEW HORIZON ENGINEERS L2 | IRSHAD AHMAD LONE L1 |
|---|---|---|---|---|---|---|
| 1.00Shifting/Re-alignment of HT/LT Network along with Sub-Stations from Sangam to Kreshbal for road widening to be carried by Executive Engineer, Division Ganderbal PMGSY (JKRRDA) falling under the jurisdiction of ESD Nawakadal, ED-3rd (Turnkey Basis). | ||||||
| 1.01 | Supply, Installation, Testing and commissiong of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. | 26 | No. | 17,000 ₹4,42,000 | 16,911 ₹4,39,686 | 16,000 ₹4,16,000 Lowest |
| 1.02 | Supply, installation, testing and commissioning of 11 KV Gapless Surge Arrestor,9 kV, 10 kA, LA with polymer housing, Stn. Type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V) | 1 | set | 6,000 ₹6,000 | 4,411 ₹4,411 | 3,000 ₹3,000 Lowest |
| 1.03 | Supply, installation, testing and commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS. | 1 | Set | 5,000 ₹5,000 | 3,711 ₹3,711 Lowest | 4,200 ₹4,200 |
| 1.04 | Supply, installation, testing and commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V) | 1 | Set | 12,000 ₹12,000 | 8,500 ₹8,500 Lowest | 10,500 ₹10,500 |
| 1.05 | Supply, installation, testing and commissioning of 120 mm² Cable, 1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type including lugs/clamps/thimbles. | 40 | Mtr | 300 ₹12,000 | 210 ₹8,400 Lowest | 300 ₹12,000 |
| 1.06 | Supply, Fabrication and fixing of GI Channel/Angle/Flat of sizes including clamps /Collars 50x8mm | 852 | Kg | 150 ₹1,27,800 | 125 ₹1,06,500 Lowest | 140 ₹1,19,280 |
| 1.07 | Supply, Installation, Testing and commissiong of 11kV Polymeric composite Pin Insulator with pins 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 81 | No. | 250 ₹20,250 | 190 ₹15,390 Lowest | 200 ₹16,200 |
| 1.08 | Supply, Installation, Testing and commissiong of 11KV Disc Insulators (Polymer Type) 12 KV, 45KN Complete with fittings (Lighting Impulse 75 KV positive and 80 KV negative , creepage distance 320 mm) | 9 | No. | 700 ₹6,300 | 380 ₹3,420 Lowest | 500 ₹4,500 |
| 1.09 | Proving and laying of Pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm | 48 | No. | 2,500 ₹1,20,000 | 1,100 ₹52,800 | 800 ₹38,400 Lowest |
Tender Value
₹21.4 L
EMD Value
₹42,780
Closing Date
23 Oct 2025, 4:00 pmClosed
Executive Engineer, ED-3rd Srinagar
Office of Executive Engineer, ED-3rd Srinagar
Shifting/Re-alignment of HT/LT Network along with Sub-Stations from Sangam to Kreshbal for road widening to be carried by Executive Engineer, Division Ganderbal PMGSY (JKRRDA) falling under the jurisdiction of ESD Nawakadal, ED-3rd (Turnkey Basis)
2025_PDD_290867_1
ED-III /26 of 2025-26, Dated - 06/10/2025
Open Tender
Electrical Works
Turn-key
20 days
Office of Executive Engineer, ED-3rd Srinagar
Refer SBD, Technical Specification, Drawings
7 documents required · 7 mandatory
₹1,000
Office of Executive Engineer, ED-3rd Srinagar
₹42,780
Yes
28 Oct 2025
6 Oct 2025
24 Oct 2025
6 Oct 2025
23 Oct 2025
10 Oct 2025
10 Oct 2025 - 20 Oct 2025
Amount
Shifting/Re-alignment of HT/LT Network along with Sub-Stations from Sangam to Kreshbal for road widening to be carried by Executive Engineer, Division Ganderbal PMGSY (JKRRDA) falling under the jurisdiction of ESD Nawakadal, ED-3rd (Turnkey Basis).
Supply, Installation, Testing and commissiong of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, installation, testing and commissioning of 11 KV Gapless Surge Arrestor,9 kV, 10 kA, LA with polymer housing, Stn. Type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V)
Supply, installation, testing and commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS.
Supply, installation, testing and commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V)
Supply, installation, testing and commissioning of 120 mm² Cable, 1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type including lugs/clamps/thimbles.
Supply, Fabrication and fixing of GI Channel/Angle/Flat of sizes including clamps /Collars 50x8mm
Supply, Installation, Testing and commissiong of 11kV Polymeric composite Pin Insulator with pins 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Supply, Installation, Testing and commissiong of 11KV Disc Insulators (Polymer Type) 12 KV, 45KN Complete with fittings (Lighting Impulse 75 KV positive and 80 KV negative , creepage distance 320 mm)
Proving and laying of Pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm
Providing of material and laying of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set, along with baby insulators & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Design, Fabrication, Supply, installation, testing and commissioning of LT Fuse Set for Distribution Transformers (Customised) as per KPDCL Drawing no. CE/P&P/DRG/2023/LTFS/001
Supply and Fixing of GI Wire 6 SWG & 8 SWG
Supply, Laying, installation, testing and commissioning of 50 mm² ACSR Conductor
Supply and Fixing of Danger Plates with Clamps
Supply & fixing of PG Clamps/ Wedge connectors
Supply and Fixing of Anti-Climbing Device with Clamps
Supply and Fixing of Galvanized Nuts and Bolts of sizes
Supply and Painting of poles with red Oxide
Supply and Painting of poles with Aluminium Paint
Supply and fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 )mm, nut?bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Supply, installation, Testing & commissioning of 11 kV Isolator, Double Break, 3-pole, 630 Amp, horizontal mounting Type, with Earth Switch including all clamps, collars, nuts & bolts or any item required for integetration with system.
Supply, Installation, Testing and commissiong of S.T. poles 8.0 Meter long swaged Type conforming to ST 410 SP-15, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 15). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, Laying, installation, testing and commissioning of 100 mm² ACSR Conductor
Supply and Fixing of 16 kN Polymer Shackle Insulators along with GI U-Clamps
Providing of material and laying of Cement bottoming 1:2:4 mix as per Standards 0.40 cum /pole
Providing of material and laying of Cement bottoming 1:2:4 mix as per Standards 0.48 cum /pole
Shifting (Dismantling & re-erection, Testing and Commissioning) of 100 KVA Distribution Transformer from current site to Proposed Site including carriage, transportation, loading, unloading.
Dismantling of old PCC Poles (to be broken at site)
Dismantling of old ST Poles and Transportation of same to Divisional Stores including carriage, transportation, loading, unloading.
Dismantling of old ACSR of different sizes and Transportation of same to Divisional Stores including carriage, transportation, loading, unloading.
Dismantling of Allied Material of old sub-station, old isolator set and Transportation of same to Divisional Stores including carriage, transportation, loading, unloading.
M/S NEW HORIZON ENGINEERS (BID ID -2613465)
CRESCENT ELECTRICAL ENGINEERS (BID ID -2613142)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_934135.xls
BOQ • 0.35 MB
Combineapprovedkpdcl.pdf
Other Document • 28.39 MB
SBD26.pdf
Tender Documents • 0.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .