Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 CrAccepted-AOC | ₹24.5 Cr | L1 | Accepted-AOC Tender Accepted |
| 2 | L2₹24.8 CrRejected-Finance | ₹24.8 Cr | L2 | Rejected-Finance Financial bid Rejected being higher rate |
| 3 | L3₹25.0 CrRejected-Finance | ₹25.0 Cr | L3 | Rejected-Finance Financial bid Rejected being higher rate |
| 4 | L4₹25.4 CrRejected-Finance AGRA ROAD ETA | ETA | ETA | UTTAR PRADESH | ₹25.4 Cr | L4 | Rejected-Finance Financial bid Rejected being higher rate |
| 5 | L5₹25.7 CrRejected-Finance 0 ABHISHEK ENTERPRISES CHARWA PACHIMTHOK KAUSHAMBI UTTAR PRADESH 212203 | KAUSHAMBI | UTTAR PRADESH | 212203 | ₹25.7 Cr | L5 | Rejected-Finance Financial bid Rejected being higher rate |
Tender Value
Refer Docs
EMD Value
₹42 L
Closing Date
12 Apr 2021, 12:00 pmClosed
SE, Unnao Circle, PWD, Unnao
SE, Unnao Circle, PWD, Unnao
WIDENING AND STRENGTHENING OF MOHAN AURAS (ODR) ROAD FROM KM. 1 TO KM. 20.83 IN DISTT. UNNAO
2021_CEUCZ_574552_1
2086M/1M/E-Tender/Unnao Circle/20-21 dt. 2.03.2021
Open Tender
Civil Works
365 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹42 L
Yes
Unnao
19 Oct 2024
22 Mar 2021
13 Apr 2021
22 Mar 2021
12 Apr 2021
22 Mar 2021
25 Mar 2021
Amount
Construction of Embankment with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2..Including Labour Cess and Excluding G.S.T.
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Including Labour Cess and Excluding G.S.T.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Including Labour Cess and Excluding G.S.T.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density..Including Labour Cess and Excluding G.S.T.
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with with water at OMC in mechanical mix plant carriage of mixed material by tipper to site , laying with 1% OPC Cement and 3.5% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density.Including Labour Cess and Excluding G.S.T.
Providing and applying tack coat with Bitumen V.G._10 using Bitumin pressure distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom ..Including Labour Cess and Excluding G.S.T.
Providing and laying bituminious concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects. Including Labour Cess and Excluding G.S.T.
Extention of 1000 mm hume pipe culvert :-Earthwork in excavation for structures as per drawing & technical specification clause 305.1 including setting out, construction of shoring & backing, removal of stumps & other delecterious matter, dressing of sides & botton, backfilling the excavation the remaining earth locally for road work'.Including Labour Cess and Excluding G.S.T..
Extention of 1000 mm hume pipe culvert :--Plain cement concrete mix 1:3:6 40mm nominal size brick ballast , placed in foundation and compacted by vibration including curing for 14 days..Including Labour Cess and Excluding G.S.T..
Extention of 1000 mm hume pipe culvert Granular material(O. B. B.) filling in foundation trenches as per drawing & technical specition clause 305.3.9 on the sides of Hume pipe.Including Labour Cess and Excluding G.S.T..
Extention of 1000 mm hume pipe culvert Providing reinforced concrete pipe NP3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar1:2(1cement: 2 coarse sand)..Including Labour Cess and Excluding G.S.T.
Extention of 1000 mm hume pipe culvert Brick masonry work in cement mortar 1:3(C:Cs) in foundation complete excluding pinting and plastering as per drawing & technical specifications clause 600, 1202 & 1203Including Labour Cess and Excluding G.S.T
Extention of 1000 mm hume pipe culvert Pointing with cement mortar 1:3(C:Cs) deep veriety (cut or weather) on brick & tile work including supply of all materials, labour and T&P reqd. for proper completion of work as per drawing & technical specification clauses 613.3 and 1204 Standard data book for analysis of rates for Rural Roads, Sr. no. 12.2,.Including Labour Cess and Excluding G.S.T
Construction of Shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2..Including Labour Cess and Excluding G.S.T
Drain in Abadi Portion Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Including Labour Cess and Excluding G.S.T..
Drain in Abadi Portion Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.ncluding Labour Cess and Excluding G.S.T..
Drain in Abadi Portion RCC Grade M 20 in substructure Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications.Including Labour Cess and Excluding G.S.T..
Drain in Abadi PortionSupplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses.Including Labour Cess and Excluding G.S.T.
Road Flair Including Labour Cess and Excluding G.S.T.
M/s Raj Laxmi Enterprises
Ajay Builders
RAM SANEHI AND SONS
ABHISHEK ENTERPRISES
SHAKUNTALA SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid