Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC COOCHBEHAR HAZRAPARA | JALPAIGURI | WEST BENGAL | 735122 | L1 | Accepted-AOC STANDS LOWEST L1 | |
| 2 | L2₹13.5 L+₹2,152.91 (0.16%)Rejected-Finance HAZRAPARA ASHRAM ROAD COOCHBEHAR | COOCHBEHAR | COOCHBEHAR | WEST BENGAL | L2 | Rejected-Finance HIGHER THAN L1 | |
| 3 | L3₹13.5 L+₹2,494.23 (0.18%)Rejected-Finance B C ROAD COOCHBEHAR 736101 | COOCHBEHAR | COOCHBEHAR | WEST BENGAL | 736101 | L3 | Rejected-Finance HIGHER THAN L1 and L2 |
Tender Value
₹13.5 L
EMD Value
₹27,043
Closing Date
8 Apr 2026, 5:00 pmClosed
EXCUTIVE ENGINEER NMD-II PHE DTE
MAYA TALKIES ROAD ,BABUPARA ,ALIPURDUAR 736121
Operation AND Guarding of Pumping Machinery Run by 30KVA Diesel Generation Set at PH-I AND II Under Balabhut Zone-II Chhit Tillai W/S Scheme in the dist of Coochbehar under NMD-II, PHE, Dte.
2026_PHED_1018619_149
WBPHED/EE/NMD-II/NIeT- 30 OF 2025-26
Open Tender
MECHANICAL
Percentage
276 days
Balabhut
Pre Qualification
6 documents required · 6 mandatory
₹27,043
19 May 2026
14 Mar 2026
10 Apr 2026
15 Mar 2026
8 Apr 2026
15 Mar 2026
Part-A/1 Part-A/2 Labour charges for 1 (One) No. operating personnel for operation of pumping machinery of each pump house by Automatic Panel including operation of valve, disinfection arrangement, internal / external illuminations as per specification and round the clock guarding of the whole installation with all accessories. (ESIC and EPF Contribution of Employers for @ 3.25% and @ 13% are include for establishment having 20 Employers or more.) Period From :- 01.05.2026 to 31.01.2027 Rates has been inclusive @1% CESS
For P/H NO.I
For P/H NO.II
"Cost of fuel for running of 30KVA Diesel Generation Unit as & when required to be recorded in log book. (rate of consumption of fuel is @ 6 .1 Ltr /Hr bill will be drawn as per actual measurement Period From :- 01.05.2026 to 31.01.2027 Rates has been inclusive @1% CESS
For P/H NO.I
For P/H NO.II
"Cost of Lubricant for running 30 KVA Diesel Generation Set as & when required to be recorded in log book ( rate of consumption of Lubricants @65 Hr/Ltr Period From :- 01.02.2026 to 31.01.2027 Rates has been inclusive @1% CESS
For P/H NO.I
For P/H NO.II
Part - B Supervision charges for electrical installation within the pump house by Licensed Electrician as per IE Rules, 1956 read with latest amendments Overhead expenditure as per specification & direction of the EIC. Period From :- 01.05.2026 to 31.01.2027 Rates has been inclusive @1% CESS
For ZONE-II P/H NO.I
For ZONE-II P/H NO.II
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
Tendernotice_2.pdf
PDF • 0.09 MB
Tendernotice_3.pdf
PDF • 1.23 MB
Tendernotice_4.pdf
PDF • 0.92 MB
BOQ_2511979.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .