Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical OPPOSITE VIPUL GAS AGENCY HOSPITAL ROAD SOLAN H P | SOLAN | SOLAN | HIMACHAL PRADESH | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹43.8 L
EMD Value
₹73,300
Closing Date
19 Jun 2026, 11:00 amClosed
AGM WSD SJPNL Us Club Shimla 171001
AGM WSD SJPNL Us Club Shimla 171001
Providing Fixing Commissioning and Testing of Vacuum Operated Gaseous Chlorination System 2000 gm per hr capacity chlorinators including Supply of Chlorine Gas and Operation Maintenance of Scheme for a period of 3 Years complete in all respect
2026_SJPNL_136525_1
2739-2740 dated 12/06/2026
Open Tender
Civil Works
Item Rate
1095 days
Shimla
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
MD
₹73,300
6 Jul 2026
12 Jun 2026
19 Jun 2026
12 Jun 2026
19 Jun 2026
12 Jun 2026
12 Jun 2026 - 19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Designing, providing, fixing, commissioning and testing of vacuum-operated gaseous chlorination system alongwith automatic switchover gas chlorination system with 2 chlorinators (1 Working + 1 stand by) make Regal USA/ Eco-Chlor of CIT(USA)/Advance Chloro Systems Ltd (UK)/ Aquasafe Solutions Ltd. (UK)/PEC (Perfect Engineering Corporation) having capacity upto 2000 grams/ hrs. as designed having the control of gas upto 20th part of max. dose and which can start working automatically on switching on the supply of water complete in all respects. The complete system consists of (a) Vacuum regulator (b) Measuring Glass Tube (c) Ejector (d) P F tubing (e) Spanner with cylinder opening key (f) Ammonia Gas (Liquid) for leaking test ) (i) Electronic Chlorine gas leak detector with sensor and hooter. (j) Eye Googles (k) mask with cainster. | 2 | No. | - | - |
| 2 | Providing,Fixing,Testing & Commissioning of Multi-Stage Pump with 5 HP motor 2 Nos (1 Working + 1 stand by)mounted on Steel Stand duly grouted along with Electric Starter and ISI marked (Grade 1) PVC ISI marked (Grade 1) PVC Pipes & Fittings, Electric Cable and Clamps, Conduit Pipes, Ball valve, lead washers, clamps, Steel stand for mounting ejector etc. Required for installation of gas chlorination plant as per site condition, complete in all respects. | 2 | No. | - | - |
| 3 | Designing, providing, fixing, commissioning and testing of online water quality analyzer make Regal USA/ ECO CHLOR of CIT(USA)/ADVANCE CHLORO SYSTEMS/ AQUASAFE SOLUTIONS LTD/HACH/TIPL/E&H for testing residual chlorine and turbidity of water. The monitor installation shall be located in a covered location easily accessible for viewing and maintenance and shall be provided complete with sample pumps as necessary to ensure the continuity of the sample. The sampling pipework complete with isolation valves etc. shall be designed to ensure the sample reaches the monitor in a time not greater than 1 minute. The monitor drainage pipework shall permit the visual checking of the presence of flow and shall discharge to the foul drain. The residual signals shall be displayed at the local control.The system should have GPRS/4G functionality to record and send data on network and make the data accessable through IoT(Internet of Things) The system shall consist of: (i) Online Residual Chlorine Monitor using DPD solution with auto calibration and non mechanical mixing. Measurement range 0-5 ppm. Indicator and Buffer Solution quantity low sensor with indicator. (ii) Online Turbidity Monitor using nephlometric spectrophometry using an array of 4 optical sensors. (iii)Measurement range 0-5nTu. | 2 | No. | - | - |
| 4 | Designing, providing, fixing, commissioning and testing of Chlorine Leak detector make Regal USA/ ECO CHLOR of CIT(USA)/ADVANCE CHLORO SYSTEMS/ AQUASAFE SOLUTIONS LTD//PEC (PERFECT ENGINEERING CORPORATION) | 2 | No. | - | - |
| 5 | Designing, providing, fixing, commissioning and testing of Auto-shut off valve make Regal USA/ ECO CHLOR of CIT(USA)/ADVANCE CHLORO SYSTEMS/ AQUASAFE SOLUTIONS LTD//PEC (PERFECT ENGINEERING CORPORATION) compatible with existing chlorine leak detectors installed which in case of a gas leak automatically switches on the actuator to close the chlorine gas (Cl2) cylinder valve. The system should also be provisioned for manually triggering through a switch. The shut-off valve should be operational for both 100-Kg and Ton Containers of chlorine gas (Cl2) and should be compatible with the existing cylinders installed on site. The shut off valve should be suitable for horizontal and vertical mounting. There should be provision for manual operation of chlorine cylinder valve through a wrench key.
Operation Method Electric with DC power supply
Working Input Voltage 12V DC
Minimum torque 30 lb-ft
Connector 5m connecting cable
Protection Class IP54 | 2 | No. | - | - |
| 6 | P/F Prefabricated MS Shed size 2.70 x2.40 m for Safe Custody of Chlorination System. Shed shall be fabricated in Four Frames made of A.I. 50x50x6mm & T-Angle 50x50x6 mm in between the frame which will be joined together with MS Nuts and Bolts. Clear Height of front frame shall be 2.40m and back frame 2.10m. Inside portion will be welded with MS Wire Mesh. MS door 0.90x2.10m shall be provided in front. Further legs shall be imbedded in ground 45 cm deep in C.C 1:4:8 Mix and inside CC Flooring 50mm thick will be provided. Top of the shed will be covered by Color Coated MS Sheet Roofing.P/F Prefabricated MS Shed size 2.70 x2.40 m for Safe Custody of Chlorination System. Shed shall be fabricated in Four Frames made of A.I. 50x50x6mm & T-Angle 50x50x6 mm in between the frame which will be joined together with MS Nuts and Bolts. Clear Height of front frame shall be 2.40m and back frame 2.10m. Inside portion will be welded with MS Wire Mesh. MS door 0.90x2.10m shall be provided in front. Further legs shall be imbedded in ground 45 cm deep in C.C 1:4:8 Mix and inside CC Flooring 50mm thick will be provided. Top of the shed will be covered by Color Coated MS Sheet Roofing. | 2 | No. | - | - |
| 7 | Providing of chlorine gas cylinder duly certified and approved by BIS and by explosive department of Govt. of India, Nagpur of 100 kg capacity As per IS 3196 part –IV (cylinder) | 5 | No. | - | - |
| 8 | Comprehensive Maintenance and Operation of complete system in all respect including replacement of any part, network and cloud storage, and consumables including reagents of original make free of charge. | 36 | Month | - | - |
| 9 | Refilling of Chlorine Gas Cylinders including transportation, loading, unloading, complete in all respect at site of work and periodic hydrotesting of chlorine gas cylinders | 9,000 | kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_202057.xls
BOQ • 0.28 MB
From8.pdf
Tender Documents • 1.93 MB
From6.pdf
Tender Documents • 0.64 MB
NIT2739.pdf
Tender Documents • 1.13 MB
Undertaking.pdf
Tender Documents • 0.04 MB
Tc.pdf
Tender Documents • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .