| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC 10 370 NEAR GEETA MANDIR GAS GODAM ROAD OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.7 L+₹31,641 (5.91%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹5.9 L+₹53,724 (10.0%)Rejected-AOC B 1 1769 PREM NAGAR KOTKAPURA | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SURJIT SINGH AND SONS L3 | M/s Mukul Kumar Prajapati L2 | G.S. CONSTRUCTION CO. L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations, trenches etc. In all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including diposal of all surplus soil as directed within a lead of 30 metres. | 48.81 | Cum | 178.75 ₹8,725 | 170 ₹8,298 Lowest | 170 ₹8,298 Lowest |
| 2.00 | Shuttering for faces of concrete foundations and foundation
beam & plinth beam (vertical or battering) | 81.12 | Sqm | 206.25 ₹16,731 | 200 ₹16,224 | 197 ₹15,981 Lowest |
| 3.00 | Centering and shuttering for columns (Square or rectangular
or poly gonal in plain) | 127.4 | Sqm | 468.48 ₹59,684 | 450 ₹57,330 | 447 ₹56,948 Lowest |
| 4.00 | Cement concrete 1:8:16 With stone aggregates 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 16.8 | Cum | 2,527.97 ₹42,470 | 2,400 ₹40,320 Lowest | 2,413 ₹40,538 |
| 5.00 | Cement Concrete 1:6:12 with stone aggregate 40mm gauge(mixing by mechanical means using concrete mixer volumetric type) | 5.27 | Cum | 2,522.08 ₹13,291 | 2,400 ₹12,648 Lowest | 2,407 ₹12,685 |
| 6.00 | Cement concrete 1:5:10 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 0.44 | Cum | 2,514.94 ₹1,107 | 2,400 ₹1,056 Lowest | 2,400 ₹1,056 Lowest |
| 7.00 | Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type | 23.97 | Cum | 2,625.07 ₹62,923 | 2,500 ₹59,925 Lowest | 2,505 ₹60,045 |
| 8.00 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 17.62 | Cum | 3,039.09 ₹53,549 | 2,900 ₹51,098 Lowest | 2,900 ₹51,098 Lowest |
| 9.00 | First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth | 5.08 | Cum | 4,489.66 ₹22,807 | 5,000 ₹25,400 | 4,285 ₹21,768 Lowest |
| 10.00 | 115mm thick brick wall in cement sand mortar 1:4 without reinforcement in foundations and plinth | 33 | Sqm | 539.36 ₹17,799 | 500 ₹16,500 Lowest | 514 ₹16,962 |
Tender Value
₹5.4 L
EMD Value
₹10,720
Closing Date
1 Apr 2026, 3:00 pmClosed
Sr. Xen, Civil Works Division, PSTCL, Jalandhar.
Room No. 301, Shakti Sadan, Jalandhar
Construction of allied civil works for replacement of defunct 100 MVA, 220/132 kV Auto T/F at 220 kV S/S Sri Muktsar Sahib.
2026_POWER_163849_1
CWJ/T-24/2025-26
Open Tender
Civil Works
Item Rate
135 days
at 220 kV S/S Sri Muktsar Sahib.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,720
Yes
22 Sept 2026
17 Mar 2026
2 Apr 2026
17 Mar 2026
1 Apr 2026
17 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations, trenches etc. In all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches , stacking the excavated soil clear from the edge of excavation and subsequent filling around masonary in 15 cm layers with compaction including diposal of all surplus soil as directed within a lead of 30 metres. | 48.81 | Cum | 162.5 | ₹7,931.63 |
| 2 | Shuttering for faces of concrete foundations and foundation
beam & plinth beam (vertical or battering) | 81.12 | Sqm | 187.5 | ₹15,210 |
| 3 | Centering and shuttering for columns (Square or rectangular
or poly gonal in plain) | 127.4 | Sqm | 425.89 | ₹54,258.39 |
| 4 | Cement concrete 1:8:16 With stone aggregates 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 16.8 | Cum | 2,298.15 | ₹38,608.92 |
| 5 | Cement Concrete 1:6:12 with stone aggregate 40mm gauge(mixing by mechanical means using concrete mixer volumetric type) | 5.27 | Cum | 2,292.8 | ₹12,083.06 |
| 6 | Cement concrete 1:5:10 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 0.44 | Cum | 2,286.31 | ₹1,005.98 |
| 7 | Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type | 23.97 | Cum | 2,386.43 | ₹57,202.73 |
| 8 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 17.62 | Cum | 2,762.81 | ₹48,680.71 |
| 9 | First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth | 5.08 | Cum | 4,081.51 | ₹20,734.07 |
| 10 | 115mm thick brick wall in cement sand mortar 1:4 without reinforcement in foundations and plinth | 33 | Sqm | 490.33 | ₹16,180.89 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.23 MB
TC.pdf
Tender Documents • 0.23 MB
TCA.pdf
Tender Documents • 0.32 MB
TECHSPEC1.pdf
Tender Documents • 9.95 MB
TECHSPEC2.pdf
Tender Documents • 19.10 MB
muktsarDnit220.pdf
Tender Documents • 0.10 MB
BOQ_331809.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .