Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC SUKANTA PALLY ISLAMPUR UTTAR DINAJPUR | ISLAMPUR | UTTAR DINAJPUR | WEST BENGAL | 733202 | ₹4.5 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹4.5 LRejected-AOC DANGAPARA MATIKUNDA ISLAMPUR UTTAR DINAJPUR | ISLAMPUR | UTTAR DINAJPUR | WEST BENGAL | ₹4.5 L | L2 | Rejected-AOC REJECTED |
| 3 | L3₹4.5 LRejected-AOC | ₹4.5 L | L3 | Rejected-AOC REJECTED |
Tender Value
₹4.5 L
EMD Value
₹9,048
Closing Date
14 Mar 2026, 3:00 pmClosed
SDO. ISLAMPUR SUB DIVISION
OFFICE OF THE SDO, ISLAMPUR SUB DIVISION, ISLAMPUR
STRONG ROOM CIVIL WORK AND OTHER WORKS AT ISLAMPUR COLLEGE GOUND FOR DCRC AND COUNTING IN CONNECTION WITH WEST BENGAL LEGISLATIVE ASSEMBLY ELECTION 2026 AT ISLAMPUR COLLEGE ISLAMPUR UTTAR DINAJPUR
2026_DMUD_1019172_1
130-INFRA-WBLA-2026
Open Tender
CIVIL WORKS
ISLAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,048
Yes
19 Mar 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
14 Mar 2026
7 Mar 2026
WBLA Election relater works as per direction of E.I.C.
125mm. thick Brick work with 1st. class bricks in cement mortar (4:1) in 1st. Floor. including the cost of carried earth (18 % GST with 1% labour cess) (Ref.- Item No. 16 Page 16, PWD.)
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary. including the cost of carried earth (18 % GST with 1% labour cess) 15mm thick Plaster. 1st. Floor. (Ref.- Item No. 1 Page 189) PWD.)
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In 1st floor including roof. including the cost of carried earth (18 % GST with 1% labour cess) (Ref.- Item No. 1a Page 10 PWD.)
White washing including cleaning and smoothening surface thoroughly (5 part of stone lime and 1 part of shell lime should be used in the finishing coat) all floors Two coat to be done on specific instruction. including the cost of carried earth (18 % GST with 1% labour cess) (Ref.- Item No. 1a Page 194 PWD.)
Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. including the cost of carried earth (18 % GST with 1% labour cess) (Ref.- Item No. 1 Page 1 PWD.)
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the c) (i) With carried earth arranged by the contractor within a radius of 1 km. including cost of carried earth. including the cost of carried earth (18 % GST with 1% labour cess) (Ref.- Item No. 3 Page 4 PWD.)
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision) For Construction of Sub Base by compacting river bed materials (Ref: It No.- 4.09, Page No- 247)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2504351.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid