Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.8 L
Closing Date
5 Apr 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER ED BIJBEHARA
EXECUTIVE ENGINEER ED BIJBEHARA
Loading Unloading, Transportation, Operation and Maintenance of 10KVA, 62.5KVA, 100KVA and 125KVA DG Sets (Departmental) during Shri Amarnath Ji Yatra 2022
2022_PDD_164827_1
EDB/e-tender/105 of 2021-22
Open Tender
Electrical Works
Turn-key
14 days
PAHALGAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Loading Unloading, Transportation, Operation and M
Exempted
7 Apr 2022
17 Mar 2022
7 Apr 2022
17 Mar 2022
5 Apr 2022
17 Mar 2022
17 Mar 2022 - 28 Mar 2022
60 days
Amount
Loading Installation, Putting in service including fixing of Change over Switches & Earthings of 62.5KVA DG Set from Divisional Stores Bijbehara, Carraige / Transporation of the same and unloading and placement at Nuwan Base Camp including loading, back carriage and unloading at Divisional Stores Bijbehara after Culmination of Yatra - 2022
Loading Installation, Putting in service including fixing of Change over Switches & Earthings of 62.5KVA DG Set from Divisional Stores Bijbehara, Carraige / Transporation of the same and unloading at placement Impregable Gate Chandanwari including loading, back carriage and unloading at Divisional Stores Bijbehara after Culmination of Yatra - 2022
Loading Installation, Putting in service including fixing of Change over Switches & Earthings of 100KVA DG Set from Divisional Stores Bijbehara, Carraige / Transporation of the same and unloading and placement of 1No at Lower Chandanwari including their loading, back carriage and unloading at Divisional Stores Bijbehara after Culmination of Yatra - 2022
Loading Installation, Putting in service including fixing of Change over Switches & Earthings of 125KVA DG Set from Divisional Stores Bijbehara, Carraige / Transporation of the same and unloading and placement of 1No at Upper Chandanwari including their loading, back carriage and unloading at Divisional Stores Bijbehara after Culmination of Yatra - 2022
Operation and Maintenance by utilizing skilled mechanics (including providing & replacement of M.Oil as per requirement & providing of minor spare parts if any) of 3x62.5KVA DG Set at Nuwan/ Chandanwari Rates should be quoted per day and Tentative no of days are 86 Days
Operation and Maintenance by utilizing skilled mechanics (including providing & replacement of M.Oil as per requirement & providing of minor spare parts if any) of 100KVA DG Set at Chandanwari Rates should be quoted per day and Tentative no of days are 86 Days
Operation and Maintenance by utilizing skilled mechanics (including providing & replacement of M.Oil as per requirement & providing of minor spare parts if any) of 2x125KVA DG Set at Nuwan/ Chandanwari DG Set Rates should be quoted per day and Tentative no of days are 86 Days
Operation and Maintenance by utilizing skilled mechanics (including providing & replacement of M.Oil as per requirement & providing of minor spare parts if any) of 4x10KVA DG Set installed at Sheshnag, 4x10KVA DG Set installed at Pajtarni &4x10KVA DG Set installed at Holy Cave Rates should be quoted per day and Tentative no of days are 86 Days
M/S SHAH ELECTRIC
M/S HILL STAR ELECTRICALS
M/S SABZAR AHMAD DAR
M/S GANIE ELECTRICALS
stage.html
html • 0.02 MB
finance_381578.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .