| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹31.9 L+₹12,393.33 (0.39%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SA Constructions L2 | PUGALMATHI AND CO L1 |
|---|---|---|---|---|---|
| 1.001. Construction of 60000 Litres OHT at Karandapalli Village H/o Karandapalli - Rs.32.07 /- Lakhs | |||||
| 2.00Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | |||||
| 3.00 | Fisrt Depth of 0 to 2m | 67.64 | CUM | 264.47 ₹17,888.75 | 263.44 ₹17,819.08 Lowest |
| 4.00 | Second Depth of 2 to 3m | 11.77 | CUM | 264.47 ₹3,112.81 | 263.44 ₹3,100.69 Lowest |
| 5.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 3.36 | CUM | 5,577.29 ₹18,739.69 | 5,555.6 ₹18,666.82 Lowest |
| 6.00Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | |||||
| 7.00 | Below1.5 m From GL | 7.43 | CUM | 9,447.8 ₹70,197.15 | 9,411.05 ₹69,924.1 Lowest |
| 8.00 | 0m to 1.5m Below GL | 2.53 | CUM | 9,308.67 ₹23,550.94 | 9,272.46 ₹23,459.32 Lowest |
| 9.00 | 0m to 1m Above GL | 0.49 | CUM | 9,450.11 ₹4,630.55 | 9,413.35 ₹4,612.54 Lowest |
| 10.00 | 1 m to 4.5m Above GL | 3.51 | CUM | 9,450.11 ₹33,169.89 | 9,413.35 ₹33,040.86 Lowest |
Tender Value
₹32.1 L
EMD Value
₹33,000
Closing Date
30 Dec 2025, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Construction of 60000 Litres OHT at Karandapalli Village in Karandapalli Thally Block Krishnagiri DT_DMFT_TN 04 KRI 278
2025_RDTN_632918_1
RocNo_6360_2025_R4_02_12_2025
Open Tender
Civil Works - Water Works
Item Rate
180 days
Thally
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹33,000
DRDA Krishnagiri
21 Feb 2026
16 Dec 2025
30 Dec 2025
16 Dec 2025
30 Dec 2025
16 Dec 2025
22 Dec 2025
Amount
1. Construction of 60000 Litres OHT at Karandapalli Village H/o Karandapalli - Rs.32.07 /- Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Fisrt Depth of 0 to 2m
Second Depth of 2 to 3m
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Below1.5 m From GL
0m to 1.5m Below GL
0m to 1m Above GL
1 m to 4.5m Above GL
4.5 m to 7.32m above GL
7.32 m to 10.98 m above GL
10.98 m to 14.64m Above GL
14.64m to 18.30m Above GL
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Plane Surface
Below GL
From GL to 3.30m
From 3.31m to 4.30
From 5.31 m to 6.30m
From 6.31 m to 7.30m
From 8.31 m to 9.30
From 9.31 m to 10.30m
From 11.31m to 12.30m
Square Column
Below GL and Upto 3.30 M above GL
3.31 m to 4.30m Height
4.31 m to 5.30m Height
5.31 m to 6.30m Height
6.31 m to 7.30m Height
7.31 m to 8.30m Height
8.31 m to 9.30m Height
9.31 m to 10.30m Height
10.31 m to 11.30m Height
11.31 m to 12.30m Height
Curved Surface
Upto 3.30m Height
3.31 m to 4.30m Height
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Cement paint (New wall )Two Coats with approved cement Paint over one prime coat of Cement primer over Plastered surface including cost and conveyance of materials and labour charges etc complete.
Providing outside M.S Ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps fixed at 30 cm centre to centre etc.and providing of Landing slabs with hand rails using 32mm GI pipe and 40mmx6mm MS flat etc. as per approved design
Providing Hand Rails Over the Roof Slab by Using 50mm GI Pipe with 40mm X6mm MS Flat and Fixed at 30cm
Vertical Pipes at 0.45m Spacing (3.142X5.34M/0.45M=38 Nos)
Horizontal Pipes Over Vertical Pipes (3.142X5.34m=16.77m)
Supply and Delivery of MS Base Plate 40X6mm thick for hand Rails at 0.45m Height (Horizantal) weight 1.99Kg/m=3.14*5.34m=16.77m
Supply and Delivery of MS Base Plate of 100X100X6mm thick Over the Slab for Fixing of 32mm GI Pipes (Medium) Pipes Vertical (approximately 0.75Grams for Each
Supply and fixing of Anchoor Fastner Bolt 12mm dia of 75mm long in the base plates
Labour charges for fabrication of MS Flates and GI Pipes
50mmDia GI Pipes Cutting
50mm Dia GI Pipes Welding
MS Plates Cutting Charges
MS Flates Welding
Painting of iron works
MS Flats (40X6mm) 80+12=92mm
50mm Dia GI Pipes Horizantal
Supplying and Fixing of RCC inner access Ladder in RCC 1:11/2:3mix etc. , Complete complying with stanard specification.
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Providing GI Ventilation Arrangement 2 nos Mosquito Proof nylon net with 65mm GI Pipe and Spls as Directed by the Department Officers
Providing cut stone slab in CM 1:3 of size 0.3X0.3X0.15M and as Directed by Departmental Officers
Supply and Fixing in position CI Manhole covers with CI Frames (Heavy Duty) of size 60Cm X 60cm of Best Approved materials
Provision for Pipe Connection Arrangements for Inlet, Outlet Scour and Over flow etc., Including cost of Pipes etc., .
65mm Dia GI Pipes
75mm Dia PVC Threaded Coupler
65mm Dia GI Tee
65mm Dia GI Elbow
65mm Dia GM Gate Valve
65mm Dia GM Flangeset
65mm Dia GI Coupling
65 mm GI Dummy
63mm PVC 4Ksc Pipe
63mm PVC Bend
75 mm X 90mm PVC Reducer
90mm Dia PVC Threaded Coupler
Refilling the Foundation with Excavated earth including Consolidation as directed by the Departmental Officers
Provision for soak pit as per Sub Estimate
Earthwork excavation and depositing on bank with initital lead of 10 m and lift of 2.00 m iin Hard stiff clay, stiff black cotton soil Hard red earth shales, murrams and earth mixed with small size in various classification of soil cofirm to SS.20B refilling of excaveted the earth etc. complete.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in Cement mortar 1:5 mix using country brick of size 22 x 11 x 7 cm including cost and conveyance and all labour charges etc.,
Supply and filling of 40 mm HBG metal (Jelly ) including cost and conveyance and all labour charges etc., complete
Supply and filling of Sand as per specification including cost and conveyance and all labour charges etc., complete
Plastering with CM 1:5 mix to 12 mm thick including cost and conveyance and all labour charges etc.,
Provision for Fencing Arrangement
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
CC1:2:4 Mix Using 20mm ISS HBG Metal Including cost and Conveyance of all Materials to Site and Labour Charges for mixing, Laying, Compacting and Curing etc., Complete
Supply of erection of centering for Sides and soffits including all labour charges
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply & fixing of Chain Link 2'' X 2'' Using Gauge Galvanised Iron wire (of All Size) All cost and Conveyance etc., all Complete
Provision for Grill gate including all cost and all labour charges
Provison for Distribution Line
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete 63mm 4KSCPVC Pipe
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
63mm 4KSCPVC Pipe laying & jointing
63mm PVC Elbow
63mm PVC Tee
63mm PVC End Cap
63mmPVC Ball Valve
Provison for Pumping Main
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick 75mm 6KSCPVC Pipe
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete 75mm 4KSCPVC Pipe
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
75mm 6KSCPVC Pipe laying & jointing
75mm PVC Elbow
75mm PVC Tee
75mm PVC End Cap
75mmPVC Ball Valve
PROVISION FOR CHLORINATOR DOSING PUMP
Provision towards pipe line arrangements for FHTC including all cost and conveyance etc., all complete
90mm dia PVC pipe
63mm dia PVC pipe
32mm dia PVC pipe
63 x20mm PVC saddle
90 x63mm PVC reducer coupler
63mm x 50mm PVC reducer coupler
PVC gate valve 90mm dia
PVC gate valve 63mm dia
32mm PVC Elbow
32mm PVC End cap
90mm PVC End cap
Cost of brackets for PVC pipes
Labour charges for fixing the PVC pipes and specials including all charges
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SA Constructions (BID ID -1541328)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
tb278.pdf
Tender Documents • 0.91 MB
BOQ_757215.xls
BOQ • 0.35 MB
pb278.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .