18 conditions · 6 needing a document upload
Standard Financial Criteria 1 Bidders shall meet such financial criteria as stipulated in tender document to be eligible to quote a bid for this tender.
Document required
1.1 Eligibility in terms of Turnover: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
Document required
1.2 Eligibility in terms of Turnover: The total contract amount received during the last three Financial Years and in the current Financial Year up to the date of Tender opening should be a minimum of 150% of Advertised Tender value. a)Tenderer(s) should submit to this effect certificate in original or an attested certificate from the Govt./Semi Govt./ Public sector undertakings for the work done for them. or b)Audited balance sheet along with P&L A/C duly certified by the Chartered Accountant as detailed in Tender document Note: Supporting documents are to be uploaded in ireps online failing which offer will be rejected.
Special Technical Criteria 1 The tenderer should have valid Electrical Contractors License Grade "A"/33KV or above issued by Govt. Electrical License Board (OR) the site Supervisor should possess necessary "A" Grade/33kV or above License issued by a Government Licensing Authority to carry out works of appropriate voltage.
Document required
2 Technical Eligibility Criteria: (a)(I) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s)any of the following during last 07 (Seven) years, ending last day of month previous to the one in which tender is invited: i. Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or ii. Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or iii. One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Document required
3 (c)Definition of similar nature of work: ""Erection, testing and commissioning of 25 kV Overhead Electric Equipment in Railways. (or) Construction and commissioning of transmission line of 66kV or above voltage of requisite value as per the technical eligibility criteria. In addition, tenderer shall also have experience of having energized 25 kV OHE work of at least 10 TKM or 20% of TKM involved in instant tender whichever is higher from single completed or ongoing work either as separate additional work or as a part of transmission line work produced to satisfy technical eligibility criteria. (or) Provision or modification to sub-stations/switching stations/switch gear equipment, control and protection equipment, reactors, power factor correction equipment, transformers or any other power equipment in 25 kV Railway Sub stations/ Switching stations or any work pertaining to 66kV and above Electrical sub-station of any PSU/Govt. agencies. In addition, tenderer shall also have experience of having energized 25 kV OHE work of at least 10 TKM or 20% of TKM involved in instant tender whichever is higher from single completed or ongoing work either as separate additional work or as a part of above Substations/Switching stations work produced to satisfy technical eligibility criteria." Note: The offer without proper technical eligibility will be treated as ineligible.
Document required
Show 3 more groups Compliance & Declarations 9 conditions · 1 needing a document upload
Commercial-Compliance 1 Tenderer /s are required to submit a scanned / attested copy of following information along with their tender- 1. Bank Account No 2. Name of Bank 3. Indian Financial System Code {IFSC} 4.PAN No 5. Tenderers Contact No Contractor should provide firms PAN, issued by Income Tax Department with his quote or within30 {Thirty} days of award of contract. No payment will be released without submission of PAN. All taxes including surcharge and cess shall be recovered from his payment as per tax provisions in vogue.
Document required
2 Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Document optional
General Instructions 1 The tenderer shall thoroughly go through the entire tender document and strictly adhere the instructions and directions given at different pages.
1.1 It is responsibility of the tenderer that they ensure to see any corrigendum of the tender to check the corrigendum on the website from time to time.
2 All the required/supporting documents should be scanned and uploaded.
3 In case the date of closing mentioned in the Notice Inviting Tender is declared a holiday/bandh/strike etc. on any account, the date of closing tender online will not be changed as the application in the website of IREPS does not permit submission of any offer after closing date and time of the tender. However, opening of tenders online will be on any convenient day after the closing date/time of tenders.
4 Opening of e-tender online:- The e-tenders will be opened online using the IREPS portal. No representative is required to be present for opening of tender and taking notes of rates quoted and ranking as the complete details of rates etc. of all the bidders shall be available to the bidders in the website after the opening of the tender.
Show 1 more group 231 items across 168 schedules · ₹1,70,81,747.12 total
A-SOR item Item- 1 1(a) Preparation of Designs and drawings.
# Description Unit Qty Rate Amount 1 Supply and Erection Per Track KM 1.50 20,066 30,099 Schedule total ₹30,099
A-SOR item Item- 2 1(c)Preparation of Traction Working Rule Diagram along with Working Instructions
A-SOR item Item- 3 1(d)Supply and Installation of Traction Working Rule Diagram Boards
A-SOR item Item- 4 2(a) (i)Concrete for foundations and plinth in hard soil.
A-SOR item Item- 5 2(a)(ii)Concrete for foundations and plinth in Rocky Soil
A-SOR item Item- 6 2(b) Concrete for foundations and plinth in other than Hard and Rock Soil
A-SOR item Item- 7 3(a)Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations.
A-SOR item Item- 8 41580.00 32/3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station under power block
A-SOR item Item- 9 3 (b) Erection of fabricated steel work such as TTC, Portals etc.
A-SOR item Item- 10 32/3(b)Erection of fabricated steel work such as TTC, portals SPS etc. under power block
A-SOR item Item- 11 3(e)Supply and Erection of Guy Rod Assembly
A-SOR item Item- 12 32/3(e)Extra charges on erection of Guy rod assembly under power block
A-SOR item Item- 13 4(a)(i)Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE
A-SOR item Item- 14 43200.00 527760.00 32/4(a) (i) Extra charges on Erection of Single braket assembly suitable for Conventional type OHE (Regulated) under power block
A-SOR item Item- 15 4(a)(ii)Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE
A-SOR item Item- 16 32/4(a) (ii)Extra charges on Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE under power block
A-SOR item Item- 16 32/4(a) (ii)Extra charges on Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE under power block
A-SOR item Item- 18 7436.00 7436.00 32/4(a)(iii)-Extra Rate for Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE Under Power Block
A-SOR item Item- 19 4(b)(i)Supply (without Insulators) and Erection of a Pull Off arrangement for Conventional OHE
A-SOR item Item- 20 10693.00 785.00 11478.00 32/4(b) (i)Extra charges on erection of a pull off arrangement for Conventional type OHE under power block
A-SOR item Item- 21 6(a)Supply and Erection of Regulated Conventional OHE
A-SOR item Item- 22 32/6(a)Extra charges on Erection of regulated conventional OHE under power block.
A-SOR item Item- 22 32/6(a)Extra charges on Erection of regulated conventional OHE under power block.
A-SOR item Item- 24 40000.00 745830.00 32/8(a) (v)Extra charges on Erection of regulating equipment (3 pulley type) with counter weight assembly for Conventional OHE under power block
A-SOR item Item- 25 8(a) (xii)Marking/Painting of temperature and 'Y' - Measurement on OHE Structures at BWA locations.
A-SOR item Item- 25 8(a) (xii)Marking/Painting of temperature and 'Y' - Measurement on OHE Structures at BWA locations.
A-SOR item Item- 32 11(a) (i) Supply and erection of 25 kV solid core cut-in insulator.
A-SOR item Item- 33 32/11(a) (i) Extra charges onerection of 25 kV solid core cut-in insulator under power block.
A-SOR item Item- 34 11(a) (ii) Supply and erection of 25 kV solid core suspension insulator.
A-SOR item Item- 35 32/11(a) (ii) Extra charges on erection of 25 kV solid core suspension insulator under power block
A-SOR item Item- 36 11(b) Supply without insulator and erection of 25 kV Post Insulators.
A-SOR item Item- 37 32/11(b) Extra charges on Erection of 25 kV Post Insulators under power block
A-SOR item Item- 38 12(a)Supply without insulator and erection of 25 kV section insulator assembly (Conventional type)
A-SOR item Item- 38 12(a)Supply without insulator and erection of 25 kV section insulator assembly (Conventional type)
A-SOR item Item- 40 18702.00 18702.00 4(a)(iii) - Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE
A-SOR item Item- 40 18702.00 18702.00 4(a)(iii) - Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE
A-SOR item Item- 42 5782.00 5782.00 13(b)Supply (without Insulators) and Erection of 25 kV Double Pole Isolator without earth contact assembly.
A-SOR item Item- 42 5782.00 5782.00 13(b)Supply (without Insulators) and Erection of 25 kV Double Pole Isolator without earth contact assembly.
A-SOR item Item- 44 13(c)Supply and Erection of Earth Contact Assembly for an Isolator
A-SOR item Item- 46 13(d)Supply and Erection of an Interlocking device
A-SOR item Item- 47 882.00 14712.00
A-SOR item Item- 49 15(b)Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) (excludes copper jumper supply)
A-SOR item Item- 50 5340.00 12756.00 4080.00 16836.00 32/15(b)Extra charges on Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) (excludes copper jumper supply) under power block
A-SOR item Item- 51 16(a) Supply and erection of structure bonds
A-SOR item Item- 52 16(b) Supply and erection of longitudinal bond.
A-SOR item Item- 53 16(c) Supply and erection of transverse and special bonds.
A-SOR item Item- 54 16(aa) Drilling of holes on rails.
A-SOR item Item- 55 16(d) Supply and Erection of Structure Bond on Platform Area
A-SOR item Item- 56 17(a) Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc.
A-SOR item Item- 57 17(b) Supply and Erection of Earth Bus.
A-SOR item Item- 58 25(a) - Supply and Erection of cable for Control and Indication ( 10 or 7 core, 2.5 sq. mm)
A-SOR item Item- 59 11550.00 626450.00 32/25(a)-Extra Rate for Erection of cable for Control and Indication ( 10 or 7 core, 2.5 sq. mm) Under Power Block
A-SOR item Item- 60 25(d) - Supply and Erection of cable for 110 V DC Power supply ( 2 core, 4 sq. mm)
A-SOR item Item- 61 42100.00 2600.00 44700.00 32/25(d)-Extra Rate for Erection of cable for 110 V DC Power supply ( 2 core, 4 sq. mm) Under Power Block
A-SOR item Item- 62 26(a)(ii) - Supply and Erection of 18 mm Copper Bus Bar
A-SOR item Item- 63 32/26(a)(ii)-Extra Rate for Erection of 18 mm Copper Bus Bar Under Power Block
A-SOR item Item- 64 27(a) - Erection of 25 kV/240 V, 5/10/25/50 KVA Auxiliary Transformer
A-SOR item Item- 64 27(a) - Erection of 25 kV/240 V, 5/10/25/50 KVA Auxiliary Transformer
A-SOR item Item- 66 7234.00 7234.00 28 - Supply (without Insulators) and Erection of 25 kV Drop Out Fuse switch for all oil type Auxiliary Transformer of all capacities
A-SOR item Item- 66 7234.00 7234.00 28 - Supply (without Insulators) and Erection of 25 kV Drop Out Fuse switch for all oil type Auxiliary Transformer of all capacities
A-SOR item Item- 68 30(b)(ii) - Supply and Erection of Anti-climbing device for Auxiliary Transformer
A-SOR item Item- 71 31(b)Provision of an additional bracket assembly / assemblies on a mast or support.
A-SOR item Item- 72 23160.00 23160.00 32/31(b)Extra charges on Provision of an additional bracket assembly / assemblies on a mast or support.
A-SOR item Item- 73 31(c)Dismantling of overHead Equipment
A-SOR item Item- 74 32/31(c)Extra charges on Dismantling of overHead Equipment
A-SOR item Item- 75 31(e)Splicing and extension of Over head conductors.
A-SOR item Item- 76 32/31(e)Extra on Splicing and extension of Over head conductors under power block.
A-SOR item Item- 77 31(f) - Dismantling of Section Insulator
A-SOR item Item- 78 32/31(f)-Extra Rate for Erection Dismantling of Section Insulator Under Power Block
A-SOR item Item- 79 31(g)Slewing and Putting back of OHE in original position
A-SOR item Item- 80 32/31(g)Extra on Slewing and Putting back of OHE in original position under power block.
A-SOR item Item- 81 31(h) Dismantling of an Isolator
A-SOR item Item- 82 32/31(h)Extra on Dismantling of an Isolator under power block.
A-SOR item Item- 83 31(i) - Dismantling of Post Insulator
A-SOR item Item- 84 32/31(i)-Extra Rate for Erection Dismantling of Post Insulator Under Power Block
A-SOR item Item- 85 31(j)(i) - Dismantling of Suspension Insulator
A-SOR item Item- 86 32/31(j)(i)-Extra Rate for Erection Dismantling of Suspension Insulator Under Power Block
A-SOR item Item- 87 31(j)(ii) - Dismantling of Cut-in Insulator
A-SOR item Item- 88 32/31(j)(ii)-Extra Rate for Erection Dismantling of Cut-in Insulator Under Power Block
A-SOR item Item- 89 31(k)(i) - Dismantlement of OHE Mast or structure by cutting
A-SOR item Item- 90 122480.00 122480.00 32/31(k)(i)-Extra Rate for Erection Dismantlement of OHE Mast or structure by cutting Under Power Block
A-SOR item Item- 91 31 (k(ii) Dismantlement of Uprights of TTCs/Portals by cutting
A-SOR item Item- 92 32/31(k)(ii) Extra on Dismantlement of Uprights of TTCs/Portals by cutting under power block.
A-SOR item Item- 93 31(m) - Releasing of Pole mounted LT supply transformer
A-SOR item Item- 94 3617.00 3617.00 32/31(m)-Extra Rate for Erection Releasing of Pole mounted LT supply transformer Under Power Block
A-SOR item Item- 95 31(n)Dismantlement of guy rod
A-SOR item Item- 96 32/31(n)Extra charges on Dismantlement of guy rod under power block.
A-SOR item Item- 96 32/31(n)Extra charges on Dismantlement of guy rod under power block.
A-SOR item Item- 98 5240.00 32/31(o)-Extra Rate for Erection Releasing of Multiple Cantilever Crossarm cantilever assemblies where single cantilever assembly is leftover Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators.
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators.
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators.
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators.
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block.
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 537.00 537.00 41(j) - Supply and Erection of Retro-Reflective Sigma Board
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 537.00 537.00 41(j) - Supply and Erection of Retro-Reflective Sigma Board 32/41 (j) Extra Rate for Erection of Retro-Reflective Sigma Board Under Power Block
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 537.00 537.00 41(j) - Supply and Erection of Retro-Reflective Sigma Board 32/41 (j) Extra Rate for Erection of Retro-Reflective Sigma Board Under Power Block 2607.00 537.00 537.00 41(l) - Supply and Erection of set of Isolator operation OPEN/CLOSE boards
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 537.00 537.00 41(j) - Supply and Erection of Retro-Reflective Sigma Board 32/41 (j) Extra Rate for Erection of Retro-Reflective Sigma Board Under Power Block 2607.00 537.00 537.00 41(l) - Supply and Erection of set of Isolator operation OPEN/CLOSE boards 42 Shock Treatment charts Tri - lingual English, Hindi and Marathi (Laminated).
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 537.00 537.00 41(j) - Supply and Erection of Retro-Reflective Sigma Board 32/41 (j) Extra Rate for Erection of Retro-Reflective Sigma Board Under Power Block 2607.00 537.00 537.00 41(l) - Supply and Erection of set of Isolator operation OPEN/CLOSE boards 42 Shock Treatment charts Tri - lingual English, Hindi and Marathi (Laminated). 5157.00 28620.00 2040.00 30660.00 43 - Supply and Erection of Protective Screens at/on ROB/FOBs
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 537.00 537.00 41(j) - Supply and Erection of Retro-Reflective Sigma Board 32/41 (j) Extra Rate for Erection of Retro-Reflective Sigma Board Under Power Block 2607.00 537.00 537.00 41(l) - Supply and Erection of set of Isolator operation OPEN/CLOSE boards 42 Shock Treatment charts Tri - lingual English, Hindi and Marathi (Laminated). 5157.00 28620.00 2040.00 30660.00 43 - Supply and Erection of Protective Screens at/on ROB/FOBs 40(b) - Supply and Erection of Number Plate (Retro-Reflective Type)
A-SOR item Item- 99 31(p) - Dismantling of Drop Arms/Booms/ Temporary Masts 107180.00 107180.00 31(r) Dismantling of Cantilever assemblies including insulators. 15252.00 15252.00 31(t)(iii) - Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire 5920.00 31(t)(iv) - Dismantling of all types of Copper Jumpers 1400.00 32/31(t) (iv)Extra charges on Dismantling of all types of Copper Jumpers under power block. 1400.00 31(t)(ix) - Re-adjustment of OHE Spans, including droppers 31(t)(x) - Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond 8736.00 8736.00 14976.00 14976.00 37(a) Unloading of all type of Copper & Aluminum conductors. 10150.00 10150.00 36(b) Loading of all type of Steel Structures. 1 Item- 114 36(a) Unloading of all type of Steel Structures. 2 Item- 113 131280.00 120.00 39(a) - Erection of Released Guy Rod 32/39 (a) Extra Rate for Erection 39(a) - Erection of Released Guy Rod Under Power Block 23720.00 23720.00 3360.00 3360.00 3360.00 3360.00 1113.00 1113.00 1113.00 1113.00 39(g) - Erection of Released Section Insulator 32/39 (f) Extra Rate for Erection of Released 25 kV Post Insulator Under Power Block 1 Item- 124 23720.00 39(f) - Erection of Released 25 kV Post Insulator 1 Item- 123 23720.00 32/39 (d) Extra Rate for Erection of Released Termination Under Power Block 1 Item- 122 39(d) - Erection of Released Termination 1 Item- 121 2240.00 2240.00 32/39 (b) Extra Rate for Erection Released Cantilever Assembly Under Power Block 1 Item- 120 39(b) - Erection of Released Cantilever Assembly 1 Item- 119 2240.00 4453.00 39(h) - Erection of Released 25 kV Single Pole Isolator 32/39 (h) Extra Rate for Erection of Released 25 kV Single Pole Isolator Under Power Block 2040.00 2040.00 14980.00 14980.00 14980.00 14980.00 20640.00 4000.00 24640.00 32/40 (a) Extra Rate for Erection of Number Plate (Enamel Type) Under Power Block 1 Item- 134 2040.00 40(a)Supply and Erection of Number Plate (Enamel Type) 1 Item- 133 2040.00 32/39 (j) Extra Rate for Erection of Released Anti-creep Under Power Block 1 Item- 132 39(j) - Erection of Released Anti-creep 1 Item- 131 4078.00 4078.00 32/39 (i) Extra Rate for Erection of Released Copper Jumper Under Power Block 1 Item- 130 39(i) - Erection of Released Copper Jumper 1 Item- 129 4078.00 4000.00 4000.00 41(c) Supply and Erection of Enamel type Staff Caution board 41(f) - Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 537.00 537.00 41(j) - Supply and Erection of Retro-Reflective Sigma Board 32/41 (j) Extra Rate for Erection of Retro-Reflective Sigma Board Under Power Block 2607.00 537.00 537.00 41(l) - Supply and Erection of set of Isolator operation OPEN/CLOSE boards 42 Shock Treatment charts Tri - lingual English, Hindi and Marathi (Laminated). 5157.00 28620.00 2040.00 30660.00 43 - Supply and Erection of Protective Screens at/on ROB/FOBs 40(b) - Supply and Erection of Number Plate (Retro-Reflective Type) 3147.00 149.00 Total Item- 145 447.00 3594.00 32/40 (b) Extra Rate for Erection of Number Plate (Retro-Reflective Type) Under Power Block
C-SOR-GENERAL ITEMS Item- 1 18(z)(i) - Supply of Paint and Stenciling/Painting of mast location, RL, MRL, EC socket symbols and implantations on OHE masts/portals
C-SOR-GENERAL ITEMS Item- 1 18(z)(i) - Supply of Paint and Stenciling/Painting of mast location, RL, MRL, EC socket symbols and implantations on OHE masts/portals
C-SOR-GENERAL ITEMS Item- 3 18(z)(iii) - Supply of Paint and Painting of any type of Bond
C-SOR-GENERAL ITEMS Item- 4 18(z)(iv) - White Washing for copping of mast/portal foundations
C-SOR-GENERAL ITEMS Item- 4 18(z)(iv) - White Washing for copping of mast/portal foundations
D-General items 2 Item- 1 31(f)(i) Supply of Contact wire Splice
D-General items 2 Item- 2 31(f)(ii) Supply of catenary wire Splice
D-General items 2 Item- 3 31(f)(iii) Supply of Large span wire ending clamp
D-General items 2 Item- 4 Provision of packing saddles
D-General items 2 Item- 5 Supply of M.S. Flat of size 40x6 mm
B1-Part-I: Steel Items Item- 1 3(as) - Supply of Rolled or Fabricated and Galvanized Traction Masts, Switching Station Masts, AT masts, Feeder masts etc
B1-Part-I: Steel Items Item- 2 3(bs) - Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts
B1-Part-I: Steel Items Item- 2 3(bs) - Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts
B2- Part-II Copper Items Item- 1 6(cs) Supply of 7 mm dia Hard Drawn Round Copper Dropper Wire
B2- Part-II Copper Items Item- 2 6(ds) Supply of 5 mm dia Hard Drawn Round Copper Dropper Wire
B2- Part-II Copper Items Item- 3 7(bs) - Supply of 150 sq.mm Hard Drawn Stranded Copper Cross Feeder Wire
B2- Part-II Copper Items Item- 4 7(cs)Supply of 130 sq.mm Cadmium Copper Large Span Wire
B2- Part-II Copper Items Item- 5 15(as) Supply of 50 sq.mm Annealed Stranded Copper Jumper Wire
B2- Part-II Copper Items Item- 6 15(bs) Supply of 160 sq.mm Annealed Stranded Copper Jumper Wire
B2- Part-II Copper Items Item- 7 15(cs) - Supply of 105 sq.mm Annealed Stranded Copper Jumper Wire
B3-Part-III: Insulator Items Item- 1 4(ax) Supply of Porcelain Stay and Bracket Insulators for Item No. 4(a)(i) / 4(a)(iv)
B3-Part-III: Insulator Items Item- 2 4(bx)(i)Supply of Porcelain Insulator Item no. 4(b)(i)/ 4(b)(ii)
B3-Part-III: Insulator Items Item- 3 4145.00 4145.00 8(bx) - Supply of Porcelain 9-ton Insulator for item no. 8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b) (ix)/9(a)/9(b)/9(c)/9(d)/11(a)(i)/11(a)(ii)
B3-Part-III: Insulator Items Item- 4 11(bx) Supply of 25KV Post insulator for 11(b)
B3-Part-III: Insulator Items Item- 5 12(ax) Supply of Sectioning and 9-ton Insulators for Item no. 12(a)
B3-Part-III: Insulator Items Item- 6 13(ax)Supply of Post and Operating Rod Insulators for Item no. 13(a)
B3-Part-III: Insulator Items Item- 7 13(bx) - Supply of Post and Operating Rod Insulators for Item no. 13(b)
B3-Part-III: Insulator Items Item- 8 28(x) - Supply of Post Insulators for Item No. 28
B4 -SOR-General SUPPLY Item- 8 27(cs) - Supply of 25 KVA, 25 kV/ 240 V Oil filled Auxiliary Transformer
B4 -SOR-General SUPPLY Item- 9 28(s) - Supply of 25 kV Operating Rod For Drop Out Fuse Switch