| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹134.6 CrAccepted-AOC C 102 ANSAL PLAZA HUDCO PLACE KHELGAON MARG NEAR SOUTH EXTENSION NEW DELHI 110 049 | ₹134.6 Cr | L1 | Accepted-AOC Lowest and reasonable |
| 2 | L2₹137.0 CrRejected-Finance | ₹137.0 Cr | L2 | Rejected-Finance Not Lowest bidder |
| 3 | L3₹152.7 CrRejected-Finance | ₹152.7 Cr | L3 | Rejected-Finance Not Lowest bidder |
| 4 | Rejected-Technical 201 202 2ND FLOOR FITWELL HOUSE OPP HOME TOWN LBS MARG VIKHROLI W MUMBAI 400083 | MUMBAI SUBURBAN | MAHARASHTRA | 400083 | - | - | Rejected-Technical Not technically qualified in Cover-1 since not meeting Pre-Qualification criteria w.r.t work experience in Govt Deptt/PSUs |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not technically qualified in Cover-1 due to original/ hard copy of documents including cost of tender fee and EMD not submitted |
Tender Value
₹111 Cr
EMD Value
₹58.8 L
Closing Date
12 Sept 2024, 6:00 pmClosed
DG MAP
DG MAP Kashmir House Rajaji Marg New Delhi
Completion of balance work for construction of dwelling units including allied Service for Officers JCO and ORs at Pune Army and Lonaval Navy
2024_MES_650515_2
84833 MAP PH-II PKG-23
Open Tender
Civil Works
760 days
Pune and Lonavala
As per NIT
2 documents required · 2 mandatory
₹3,000
DG MAP New Delhi
₹58.8 L
New Delhi
13 Nov 2024
9 Jul 2024
19 Sept 2024
9 Jul 2024
12 Sept 2024
29 Jul 2024
9 Jul 2024 - 22 Jul 2024
17 Jul 2024
Amount
Completion of balance work and rectification of defects for construction of Block 32 (Thirty Two) dwelling units in Stilt + Eight (S + 8) contruction of RCC framed structure with covered garages in stilt and external covered garages along with servant quarters along with w/c, wash, seperate staircase of servant quarter, lift shaft / well, lift machine room, etc. with all fixtures, fitments, built in furniture complete as specified and shown in drawing at Station Workshop, Pune for Officers (Maj & above).
(a) BLOCK- 1 (Pocket-I) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-1 and defect list as per Appendix A-1.
BLOCK- 5 (Pocket-I) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-5 and defect list as per Appendix A-5.
Completion of balance work and rectification of defects for construction of Block of 28 (Twenty Eight) dwelling units in Stilt + Seven (S + 7) contruction of RCC framed structure with covered garages in stilt and external covered garages along with servant quarters along with w/c, wash, seperate staircase of servant quarter, lift shaft / well, lift machine room, etc. with all fixtures, fitments, built in furniture complete as specified and shown in drawing at Station Workshop, Pune for Officers (Maj & above).
BLOCK- 2 (Pocket-I) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-2 and defect list as per Appendix A-2
BLOCK- 4 (Pocket-I) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-4 and defect list as per Appendix A-4
Completion of balance work and rectification of defects for construction of Block 20 (Twenty) dwelling units in Stilt + Five (S + 5) contruction of RCC framed structure with covered garages in stilt including servant quarters along with w/c, wash, seperate staircase of servant quarter, lift shaft / well, lift machine room, etc. with all fixtures, fitments, built in furniture complete as specified and shown in drawing at Station Workshop, Pune for Officers (Maj & above).
BLOCK- 3 (Pocket-I) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-3 and defect list as per Appendix A-3
Completion of balance work and rectification of defects for construction of Block 4 (Four) dwelling units in Ground + One (G+1) of RCC framed structure including covered garages & servant quarters with w/c, wash, verandah, & seperate staircase of servent quarter with all fixtures, fitments, built in furniture complete as specified and shown in drawing for Officers complete at AFMC, 12 RF Lines, 8 PW Drive, Pune (Maj & above).
BLOCK- 1 (8 P W DRIVE) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-6 and defect list as per Appendix A-17
BLOCK- 2 (8 P W DRIVE) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-7 and defect list as per Appendix A-18
BLOCK- 1 (12 RF Lines)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in hat yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-8 and defect list as per Appendix A-21
BLOCK- 2 (12 RF Lines)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-9 and defect list as per Appendix A-22
BLOCK- 2 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-11 and defect list as per Appendix A-7
BLOCK- 3 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-12 and defect list as per Appendix A-8
BLOCK- 4 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-13 and defect list as per Appendix A-9
BLOCK- 5 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-14 and defect list as per Appendix A-10
BLOCK- 6 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-15 and defect list as per Appendix A-11
BLOCK- 7 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-16 and defect list as per Appendix A-16
Completion of balance work and rectification of defects for construction of Block 2 (two) dwelling units in ground storey contruction of RCC framed structure including covered garages & servant quarters with w/c, wash, verandah with all fixtures, fitments, built in furniture complete as specified and shown in drawing for Officers complete at AFMC, 3 Alexander Road & AIPT, Pune officers (Maj & above).
BLOCK- 1 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-10 and defect list as per Appendix A-6
BLOCK- 1 (3 Alexander Road)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-21 and defect list as per Appendix A-23
BLOCK- 2 (3 Alexander Road)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-22 and defect list as per Appendix A-24
BLOCK- 1 (AIPT)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-23 and defect list as per Appendix A-19
Completion of balance work and rectification of defects for construction of Block 7 (Seven) dwelling units in ground + three (G + 3) storied construction of RCC framed structure including covered garages & w/c, wash, verandah with all fixtures, fitments, built in furniture complete as specified and shown in drawing at MH CTC Lullanagar, Pune for JCOs complete.
BLOCK- 1 (Lullanagar)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-43 and defect list as per Appendix A-54
BLOCK- 2 (Lullanagar)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-44 and defect list as per Appendix A-55
Completion of balance work and rectification of defects for construction of Block 6 (six) dwelling units in ground + two (G + 2) storied construction of RCC framed structure including covered garages & w/c, wash, verandah with all fixtures, fitments, built in furniture complete as specified and shown in drawing at AFMC & Kohima Lines, Pune for JCOs complete.
BLOCK- 1 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-17 and defect list as per Appendix A-13
BLOCK- 2 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-18 and defect list as per Appendix A-14
BLOCK- 3 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-19 and defect list as per Appendix A-15
BLOCK- 4 (AFMC)(Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-20 and defect list as per Appendix A-16
BLOCK- 1 (Kohima Lines)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-45 and defect list as per Appendix A-25
BLOCK- 2 (Kohima Lines)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-46 and defect list as per Appendix A-26
BLOCK- 3 (Kohima Lines)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-47 and defect list as per Appendix A-27
Completion of balance work and rectification of defects for construction of Block 4 (Four) dwelling units in ground + one storied (G+1) construction of RCC framed structure including covered garages & w/c, wash, verandah with all fixtures, fitments, built in furniture complete as specified and shown in drawing at AIPT, Pune for JCOs complete.
BLOCK- 1 (AIPT)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-24 and defect list as per Appendix A-20
Completion of balance work and rectification of defects for construction of Block 20 (Twenty) dwelling unit in stilt + five (S + 5) storied construction of RCC framed structure including covered garages & w/c, wash, lift shaft / sell, lift machine room along with all fixtures, fitments, built in furniture complete as specified and shown in drawing at Ghorpadi for ORs complete.
BLOCK- 1 (Ghorpadi)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-48 and defect list as per Appendix A-28
BLOCK- 2 (Ghorpadi)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-49 and defect list as per Appendix A-29
BLOCK- 3 (Ghorpadi)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-50 and defect list as per Appendix A-30
BLOCK- 4 (Ghorpadi)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-51 and defect list as per Appendix A-31
BLOCK- 5 (Ghorpadi)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-52 and defect list as per Appendix A-32
BLOCK- 6 (Ghorpadi)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-53 and defect list as per Appendix A-33
BLOCK- 7 (Ghorpadi)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-54 and defect list as per Appendix A-34
BLOCK- 8 (Ghorpadi)(Pocket-III) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-55 and defect list as per Appendix A-35
Completion of balance work and rectification of defects for construction of Block 8 (Eight) dwelling unit in Ground + Three (G + 3) storied construction of RCC framed structure including covered garages & w/c, wash, verandah with all fixtures, fitments, built in furniture complete as specified and shown in drawing at MH CTC Lullanagar, Pune for ORs complete.
BLOCK- 1 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-25 and defect list as per Appendix A-36
BLOCK- 2 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-26 and defect list as per Appendix A-37
BLOCK- 5 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-29 and defect list as per Appendix A-40
BLOCK- 6 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-30 and defect list as per Appendix A-41
BLOCK- 7 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-31 and defect list as per Appendix A-42
BLOCK- 8 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-32 and defect list as per Appendix A-43
BLOCK- 9 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-33 and defect list as per Appendix A-44
BLOCK-10 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-34 and defect list as per Appendix A-45
BLOCK-11 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-35 and defect list as per Appendix A-46
BLOCK-12 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-36 and defect list as per Appendix A-47
BLOCK-13 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-37 and defect list as per Appendix A-48
BLOCK-14 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-38 and defect list as per Appendix A-49
BLOCK-15 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-39 and defect list as per Appendix A-50
BLOCK-16 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-40 and defect list as per Appendix A-51
BLOCK-17 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-41 and defect list as per Appendix A-52
BLOCK-18 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-42 and defect list as per Appendix A-53
Completion of balance work and rectification of defects for construction of Block 6 (Six) dwelling unit in Ground + Two (G + 2) storied construction of RCC framed structure including covered garages & w/c, wash, verandah with all fixtures, fitments, built in furniture complete as specified and shown in drawing at MH CTC Lullanagar for ORs complete.
BLOCK-3 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-27 and defect list as per Appendix A-38
BLOCK-4 (Lullanagar) (Pocket-II) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-28 and defect list as per Appendix A-39
Construction of Garbage bin comprises of two seperate enclosures for dry and other for wet garbage including PCC block masonry construction, foundation, steel gate, saucer drain etc complete all as specified and shown on drawings for Pune pockets.
Completion of balance work and defect rectification in Guard Post of RCC framed structure including w/c, washbasin, verandah with all fixtures, fitments etc. complete as specified and shown in drawings for station workshop , balance work in Pune Pockets at PAGE No 538, S.No. 1
Construction of Guard Post of RCC framed structure including w/c, wash, verandah with all fixtures, fitments etc. complete as specified and shown in drawings for Pune Pockets.
Completion of balance work and rectification of defects for construction of Block 4 (Four) dwelling units for Captains in Ground + One (G + 1) storied contruction of RCC framed structure including covered garages & servant quarters with w/c, wash, verandah, & seperate staircase of servant quarter with all fixtures, fitments, built in furniture complete as specified and shown in drawing etc. complete at LOV 01 (Duke's Nose), Lonavla
BLOCK-2 (Dukes Nose) (Pocket-I) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-55 and defect list as per Appendix A-56
BLOCK-3 (Dukes Nose) (Pocket-I) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-56 and defect list as per Appendix A-57
BLOCK-4 (Dukes Nose) (Pocket-I) Note : The details of work executed in percentage in terms of yardsticks, balance work in that yardsticks, reinforcement steel placed in position but not covered with concrete and photograph of block is enclosed as Appendix K-57 and defect list as per Appendix A-58
Construction of Garbage bin comprises of two seperate enclosures for dry and other for wet garbage including PCC block masonry construction, foundation, PVC gate, saucer drain etc complete all as specified and shown on drawings for Lonavla Pockets
Construction of Guard Post of RCC framed structure including w/c, wash, verandah with all fixtures, fitments etc. complete as specified and shown in drawing for Lonavla Pockets.
Note: The balance work shown in Appendices K-1 to K-58 and list of defects shown in Appendix AA-1 to AA-5 and A-1 to A-58 are for refrence purposes only. The contractor to visit the site and assess the exact quantum of balance work and quantum of defect rectification and quote their lump sum unit rates accordingly.
SCH "A " SECTION - II INTERNAL WATER SUPPLY Total of Sch " A " Section -II B/F from Serial Page No.58
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Total of Sch " A " Section -III B/F from Serial Page No.80
SCH "A " SECTION- IV ROAD,PATH AND CULVERT Total of Sch " A " Section -IV B/F from Serial Page No. 89
SCH "A " SECTION- V AREA DRAINAGE Total of Sch " A " Section -V B/F from Serial Page No. 93
SCH "A " SECTION - VI SECURITY WALL,FENCING & GATES Total of Sch " A " Section -VI B/F from Serial Page No. 104
SCH "A " SECTION - VII RAIN WATER HARVESTING Total of Sch " A " Section -VII B/F from Serial Page No. 108
SCH "A " SECTION - VIII SOLAR HEATING SYSTEM Total of Sch " A " Section-VIII B/F from Serial Page No. 118
Sch 'A' SECTION -IX STREET LIGHTING
Earthing complete with galvanised steel earth plate electrode 600x600x6.3mm thick, burried directly in ground (earth pit not less than 2.25M deep below ground level) with top edge of the plate not less than 1.5M below normal ground level, connected to galvenised earth lead wire 4.0 mm dia by means of bolts, nuts, check nuts and washers of galvenised iron or steel all as shown in electrical plate no.3 " SSR Part 1 of 2009" connected to earthing test point all as specified or indicated including testing on completion.
Earthing complete with galvanised steel earth plate electrode 600x600x6.3mm thick, burried directly in ground (earth pit not less than 2.25M deep below ground level) with top edge of the plate not less than 1.5M below normal ground level, connected to galvenised strip of 25x4mm earth lead by means of bolts, nuts, check nuts and washers of galvenised iron or steel all as shown in electrical plate no.3 " SSR Part 1 of 2009", connected to earthing test point all as specified or indicated including testing on completion.
Earthing complete with galvanised steel pipe electrode 40 mm bore, medium grade, 2.5 meter lenght, burried directly in ground with top edge not less than 1.25 M below ground level, connected with GI earth wire 4 mm dia GI as earthing leadby means of bolts, nuts, check nuts and washers of galvanised iron or steel all as shown in electrical plate No. 2 connected to earthing test point all as specified and indicated including testing on completion.
Supply and installation of earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawin in conduit / pipe or fixed to poles or any other indicated situation for loop earthing etc as required 4 mm dia. GI wire
Supply and installation of earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawin in conduit / pipe or fixed to poles or any other indicated situation for loop earthing etc as required 25 x 4 mm Flat GI Strip
Supply, installation , testing & commissioning of Steel tubular swaged pole complete with base plate, finial taper plug, bolts, nuts & screws as per specified type 410 SP-31 (9 meter long) duly two coated of synthetic enamelled paint over one coat of red oxide above ground level and black bituminous paint below ground complete all as specified and directed
Supply, installation, testing & commisioning of Post top lantern lamp pole (50 mm) shape, complete with base plate, finnial taper plug, bolts,nuts & screws as per specified (2.5 meter long). Duly painted. In garden
Supply and fixing of 50 mm dia. G I Pipe medium grade 1.5 m long on either side of pole for cable protection.
Supply and installation of Reinforced concrete pipes,class NP2,laid and jointed complete with collars. 150 mm Dia
Supply and Sand Filling in trenches for cable laying
Type D2 - Cement concrete in foundations, filling and mass concrete 1:4:8 40mm graded aggregate
Type B1 - Cement concrete in foundations, filling and mass concrete 1:2:4 20mm graded aggregate
Supply and installation underground XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100V grade, cross sectional area .
4 core 25 sq.mm
4 core 16 sq.mm
4 core 06 sq.mm
3 core 06 sq.mm
3 core 2.5 sq.mm
Supply and installation underground XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100V grade, cross sectional area .
4 core 25 sq.mm
4 core 16 sq.mm
4 core 06 sq.mm
3 core 06 sq.mm
Supply and installation underground XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100V grade, cross sectional area .
Excavation and back filling, PCC pit and cast iron cover, funnel with watering pipe, wire mesh, lugs etc., for above GI Plate type earth Electrode.(soft disintegrated rocks)
Supply, laying & terminating of 3 core 2.5 sq.mm, 1100V grade PVC insulated cable from pole junction box to lamp control gear box
Supply, laying & terminating of 3 core 1.5 sq.mm, 1100V grade PVC insulated cable from pole junction box to lamp control gear box
Supply and laying of un-reinforced precast concrete cable cover, class LV, type 1 with peak, size 250mmx150mmx40mm
Supply & fixing of Cable route markers made of galvanized iron with supporting G.I angle, for LT cable route marking
Junction box fitted in the pole & comprising of 6A SP MCB with terminals suitable for terminating incoming and out going cables of 4core 16 sq.mm 1.1 kV grade armoured PVC insulated
supply, erection of 50 mm, medium grade GI pipe fixing street light single bracket with 1.5 M long.The rate should inclusive of supply and erection with necessary clamp, screws, one coat of aluminium painting etc.
supply, erection of 50 mm, medium grade GI pipe fixing street light double bracket with 1.5 M long.The rate should inclusive of supply and erection with necessary clamp, screws, one coat of aluminium painting etc.
Design, supply, erection of 50mm, medium grade GI pipe fixing street light tripal bracket with 1.5 M long.The rate should inclusive of supply and erection with necessary clamp, screws, one coat of aluminium painting etc..
Supply and fixing of street light fitting sodium vapour lamp type 150W single piece die cast/deep drawn, aluminium housing complete with control gear compartment, acrylic cover UV stablized, ballast of dual tapping, dynamic power saving device to reduce power to 100Watt after six hours of peak load, prewired with lamp etc. Light fitting similar to Wipro make WST 76150 or equivalent
Supply & fixing of sodium vapour lamp type 70W Post top lantern type complete with control gear , cover etc. similar to philips make SPC 101/70W , 70 Watt HPSV lamp or equivalent.
Supply, installation, testing and commissioning of cubicle type, free standing, floor mounted, Street Lighting Distribution Board working on 440V 3 phase, 50 Hz, AC, Supply. It shall be with aluminium bus bars, 2mm thick CRCA sheet steel enclosure, pai nted as per the 7 tank process and painted for outdoor, weather proof IP-54 protection installation, as per specification and having the following details and the shown in single line diagrams.
Incomer 1 No. 32A 3P, 25 KA, MCCB & fixed neutral link N with S/C & adj. O/L releases, phase indication lamps , ammeter & voltmeter with fuse.
3 Nos 32Amp Contactors (1 No for 100% lighting,1 No for 66% lighting, 1 No for 33% lighting)
1 No timer electronic type with battery backup for controlling street light with adjustable time range (setting 6 P.M to 6 A.M)
High Mast Supply& fixing ,Testing & commisioning of 30M high mast shaft in two sections suitable for 39 m/sec wind speed, with raising lowering system comprising, head frame, luminaries carriage suitable to install 8 nos supply of foundation bolts manufactured from special steel along with nuts, washers, anchor plates and templates. Luminaries in sysmmetrical arrangement, double drum winch, 5 mm diameter SS wire rope, trailing cable, connector, integral power tool motor, manual handle, junction box, lightning finial.Foundation bolts with nuts and washers and anchor plates templets.Wiring of luminaires with pvc insulated pvc sheathed flexible cable of suitable copper conductor cores of 2.5 sqmm. Construction of shallow foundation with M25 grade concrete for high mast considaring the safe soil bearing capacity at site as 10T/sqmtrs at 2 metre depth with all material and labour.
S & F of GLS Aviation Lamp (twin) at terrace with fixing bracket, wiring and lamps etc.
Supply of non-integral floodlight luminaries type similar to Wipro make WST 52400 or equivalent, with Two no 400 W SV T lamp and its control gear box.
Supply ,Installation & Testing of Outdoor stand mounted feeder mounted feeder pillar with 32A TP MCB + N incomer,single dial time switch,25A TP contactor for the automatic switching of lights, power tool control with 2 no 9A contactors and raise lower push button,Incoming 25 sq.mm and outgoing 16 & 25 sq.mm terminals.
Sch 'A' SECTION- X LIFTS
Supply, Installation, Testing and Commissioning of 13 Passenger (884 kg) Lift having contract speed of 1.5 Metres Per Second serving different floors in the lift shaft as per details given below:-
Lifts shall conform to IS: 14665 with latest amendments
Location of Lifts:Residential Dwelling Unit Blocks as shown in the architectural layout plans.
Location of Lifts Machine room : Top (Above the lift shaft, common machine room as per the architectural layout plans for a group of one lift of 13 Persons and one lift of 8 persons)
(i) Speed: 1.5 MPS
(ii) Floors: Stilt + 8 Floors.
(iii) Travel: Based on Stilt + 8 Floors and architectural plans/sections.
(iv) Stops and openings: On All Floors (Stilt + 8 Floors) on one side (I.e on the same side), entrance opening 2100 mm height x 900 mm wide
(v)Controller: A.C Variable Voltage and Variable Frequency Controller
(vi) Automatic Rescue Device complete with dry maintenance free batteries as required.
(viii) Power; 415V, 3 phase 4 wire system
(ix) Type of doors:
a) Car doors; Power operated, centre opening horizontal sliding stainless steel scratch proof ( moon rock finish)
Car doors opening-
b) Landing doors; Power operated, centre opening horizontal sliding M.S doors finished with spray painting of approoved shade.
Landing Stops and openings-
Stilt + 8 floors
(x)Car size-
Car inside 2000 mm wide and 1100 mm deep
(xi) Emergency light and alarm bell-
Rechargable Ni-Cd battery operated emergency light and alarm bell.
(xii) A hand rail not less than 600 mm long and 900 mm above floor level to be fixed adjacent to control panel in the lift car.
(xiii) Voice announcement system in the car to announce the position of the elevator in the hoistway as the car passes or stops at a floor served by the elevator.
(xiv) Interfacing Connections for the buildings P.A and music system with necesaary flexible cables.
(xv) Voltage stabiliser for the lift for trouble free operation of the lift under supply voltage fluctuations.
(xvi) Fireman's switch
Supply, Installation, Testing and Commissioning of 8 Passenger (544 kg) Lift having contract speed of 1.5 Metres Per Second serving different floors in the lift shaft as per details given below:-
Lifts shall conform to IS: 14665 with latest amendments
Location of Lifts:Residential Dwelling Unit Blocks as shown in the architectural layout plans.
Location of Lifts Machine room : Top (Above the lift shaft, common machine room as per the architectural layout plans for a group of one lift of 13 Persons and one lift of 8 persons)
(i) Speed: 1.5 MPS
(ii) Floors: Stilt + 8 Floors
(iii) Travel: Based on Stilt + 8 Floors and architectural plans/sections.
(iv) Stops and openings: On All Floors (Stilt + 8 Floors) on one side (I.e on the same side), entrance opening 2100 mm height x 800 mm wide.
(v)Controller: A.C Variable Voltage and Variable Frequency Controller.
(vi) Automatic Rescue Device complete with dry maintenance free batteries as required.
(viii) Power; 415V, 3 phase 4 wire system
(ix) Type of doors:
a) Car doors; Power operated, centre opening horizontal sliding stainless steel scratch proof ( moon rock finish)
Car doors opening-
b) Landing doors; Power operated, centre opening horizontal sliding M.S doors finished with spray painting of approoved shade.
Landing Stops and openings-
G + 8 floors
(x)Car size-
Car inside 1300 mm wide and 1100 mm deep
(xi) Emergency light and alarm bell-
Rechargable Ni-Cd battery operated emergency light and alarm bell.
(xii) A hand rail not less than 600 mm long and 900 mm above floor level to be fixed adjacent to control panel in the lift car.
(xii) Voice announcement system in the car to announce the position of the elevator in the hoistway as the car passes or stops at a floor served by the elevator.
(xiv) Interfacing Connections for the buildings P.A and music system with necesaary flexible cables.
(xv) Voltage stabiliser for the lift for trouble free operation of the lift under supply voltage fluctuations.
(xvi) Fireman's switch
Supply, Installation, Testing and Commissioning of 13 Passenger (884 kg) Lift having contract speed of 1.5 Metres Per Second serving different floors in the lift shaft as per details given below:-
Lifts shall conform to IS: 14665 with latest amendments
Location of Lifts:Residential Dwelling Unit Blocks as shown in the architectural layout plans.
Location of Lifts Machine room : Top (Above the lift shaft, common machine room as per the architectural layout plans for a group of one lift of 13 Persons and one lift of 8 persons)
(i) Speed: 1.5 MPS
(ii) Floors: Stilt + 7 Floors
(iii) Travel: Based on Stilt + 7 Floors and architectural plans/sections.
(iv) Stops and openings: On All Floors (Stilt + 7 Floors) on one side (I.e on the same side), entrance opening 2100 mm height x 900 mm wide
(v)Controller: A.C Variable Voltage and Variable Frequency Controller
(vi) Automatic Rescue Device complete with dry maintenance free batteries as required.
(viii) Power; 415V, 3 phase 4 wire system
(ix) Type of doors:
a) Car doors; Power operated, centre opening horizontal sliding stainless steel scratch proof ( moon rock finish)
Car doors opening-
b) Landing doors; Power operated, centre opening horizontal sliding M.S doors finished with spray painting of approoved shade.
Landing Stops and openings-
G + 7 floors
(x)Car size-
Car inside 2000 mm wide and 1100 mm deep
(xi) Emergency light and alarm bell-
Rechargable Ni-Cd battery operated emergency light and alarm bell.
(xii) A hand rail not less than 600 mm long and 900 mm above floor level to be fixed adjacent to control panel in the lift car.
(xiii) Voice announcement system in the car to announce the position of the elevator in the hoistway as the car passes or stops at a floor served by the elevator.
(xiv) Interfacing Connections for the buildings P.A and music system with necesaary flexible cables.
(xv) Voltage stabiliser for the lift for trouble free operation of the lift under supply voltage fluctuations.
(xvi) Fireman's switch
Supply, Installation, Testing and Commissioning of 8 Passenger (544 kg) Lift having contract speed of 1.5 Metres Per Second serving different floors in the lift shaft as per details given below:-
Lifts shall conform to IS: 14665 with latest amendments
Location of Lifts:Residential Dwelling Unit Blocks as shown in the architectural layout plans.
Location of Lifts Machine room : Top (Above the lift shaft, common machine room as per the architectural layout plans for a group of one lift of 13 Persons and one lift of 8 persons)
(i) Speed: 1.5 MPS
(ii) Floors: Stilt + 7 Floors
(iii) Travel: Based on Stilt + 7 Floors and architectural plans/sections.
(iv) Stops and openings: On All Floors (Stilt + 7 Floors) on one side (I.e on the same side), entrance opening 2100 mm height x 800 mm wide
(v)Controller: A.C Variable Voltage and Variable Frequency Controller
(vi) Automatic Rescue Device complete with dry maintenance free batteries as required.
(viii) Power; 415V, 3 phase 4 wire system
(ix) Type of doors:
a) Car doors; Power operated, centre opening horizontal sliding stainless steel scratch proof ( moon rock finish)
Car doors opening-
b) Landing doors; Power operated, centre opening horizontal sliding M.S doors finished with spray painting of approoved shade.
Landing Stops and openings-
Stilt + 7 floors
(x)Car size-
Car inside 1300 mm wide and 1100 mm deep
(xi) Emergency light and alarm bell-
Rechargable Ni-Cd battery operated emergency light and alarm bell.
(xii) A hand rail not less than 600 mm long and 900 mm above floor level to be fixed adjacent to control panel in the lift car.
(xii) Voice announcement system in the car to announce the position of the elevator in the hoistway as the car passes or stops at a floor served by the elevator.
(xiv) Interfacing Connections for the buildings P.A and music system with necesaary flexible cables.
(xv) Voltage stabiliser for the lift for trouble free operation of the lift under supply voltage fluctuations.
(xvi) Fireman's switch
Supply, Installation, Testing and Commissioning of 13 Passenger (884 kg) Lift having contract speed of 1.0 Metres Per Second serving different floors in the lift shaft as per details given below:-
Lifts shall conform to IS: 14665 with latest amendments
Location of Lifts:Residential Dwelling Unit Blocks as shown in the architectural layout plans.
Location of Lifts Machine room : Top (Above the lift shaft, common machine room as per the architectural layout plans for a group of one lift of 13 Persons and one lift of 8 persons)
(i) Speed: 1.0 MPS
(ii) Floors: Stilt + 5 Floors
(iii) Travel: Based on Stilt + 5 Floors and architectural plans/sections.
(iv) Stops and openings: On All Floors (Stilt + 5 Floors) on one side (I.e on the same side), entrance
(v)Controller: A.C Variable Voltage and Variable Frequency Controller
(vi) Automatic Rescue Device complete with dry maintenance free batteries as required.
(viii) Power; 415V, 3 phase 4 wire system
(ix) Type of doors:
a) Car doors; Power operated, centre opening horizontal sliding stainless steel scratch proof ( moon rock finish)
Car doors opening-
b) Landing doors; Power operated, centre opening horizontal sliding M.S doors finished with spray painting of approoved shade.
Landing Stops and openings-
Stilt + 5 floors
(x)Car size-
Car inside 2000 mm wide and 1100 mm deep
(xi) Emergency light and alarm bell-
Rechargable Ni-Cd battery operated emergency light and alarm bell.
(xii) A hand rail not less than 600 mm long and 900 mm above floor level to be fixed adjacent to control panel in the lift car.
(xiii) Voice announcement system in the car to announce the position of the elevator in the hoistway as the car passes or stops at a floor served by the elevator.
(xiv) Interfacing Connections for the buildings P.A and music system with necesaary flexible cables.
(xv) Voltage stabiliser for the lift for trouble free operation of the lift under supply voltage fluctuations.
(xvi) Fireman's switch
Sch 'A' SECTION- XI FIRE FIGHTING
Providing fixing, welding, testing and commissioning of MS pipe (heavy) confirming to IS: 1239 with required accessories and pipe fittings like flange, tee, elbow, bend nipple, coupling, cap, reducer, union, flange joint, CAF insertion, nut bolt eyc and Rediography limited to 10 including fixing the pipe with suitable G.I. flat strip clamp / U-clamp/brckets/ hanger and painting with one coat primer and two or more coats of postal red enamel paint of approved brand, hydrostatic testing etc, as per specifications and instructions of site in charge.
Provding, fixing and commissioning of ISI marked cast iron double flanged Sluice valve complete with companion flanges, pipe fittings, bolts, nuts CAF gasket etc duly painted as per specification.
Hydrant valves Providing and fixing bolting, welding, Radiography testing painting and commissioning of hydrant valves single headed ISI marked 63 mm dia single headed landing valve CI hand wheel CAF gasket, nuts, bolts, etc conforming to IS: 5290-1977 type A for external and internal hydrants as per pecifications and instructions of site incharge.
Providing and fixing Branch pipe & nozzle. ISI marked 63 mm dia male instantaneous inlet spray nozzle made of gun metal to IS: 903 arrangement for straight stream spray, shut-off and trigger type handle as per sepcifications.
Providing and fixing fire fighting delivery hose, PRL Hose pipe 15 m long 63 mm dia ISI marked, non- percolating, flexible, 3 layered synthetic jacketed with electrometric outer covering, resistant to liquids, chemicals, acids, alkalis, solvents, abrasion & heat having 42 Kg /cm2 burst pressure, 18 Kg /cm2 working pressure, conforming to IS: 636-1988 type-B and having TAC MMDapprovals in 15 mtr length with copper wire bounded. Instantaneous type 63 mm fire hose pair of male & female coupling made of aluminium alloy (anodised) / gun metal in each run of hose conforming to IS: 903 as per tender requriements / specifications.
Providing and fixing ISI marked first aid fire hose reel conforming to IS: 884-1985 comprise of reel hose guide, full swing drum fixing bracket, 20 mm bore 36 meters long high-pressure braided rubber hose tubing conform to IS: 1532-1969, 25 mm dia ball valve, stainless steel stop cock and nozzle duly painted as per tender requirements / specifications and instructions of site incharge.
M. S. Box / Cabinets internal hose Cabinet of single shutter glaged door ,made of rectugular metallice sheet section of (1500 x 900 x 450)mm size.
Supplying,painting, installing, testing & commissioning of Air Cushion Tanks.As per spec.
Providing and fixing Air vessel on top of wet riser with 450 mm dia, 1.5m high, fabricated with min 8 mm thick mild steel sheet ,vent drain ball valve (1"NB) ( auto air release valve ) with necessory accessories
Fire Brigade Connection Four way fire brigade inlet with 150 NB with Butterfly valve and NRV with matching flanges.
Providing, supplying, installing, testing and commissioning of horizontally mounted centrifugal type pump running at 2900/3000 rpm capabl e of delivering 900 LPM at 45 MWC, 10 HP complete with tail piece for proper connection to suction and delivery line and bypass arrangement for testing with bronze impellers complete with mechanical seal motor TECF 2900 rpm 415 V (+/-) 3% class FIP 55
Pressure Gauge: Supplying and installing pressure gauge complete in all respect with syphon and plug valves
Non Return Valves: Supplying and installing C.I. double flanged NRV with matching flanges of following sizes complete in all respect
Supply, installation, testing and commissioning of cables laid on trays or wall. Complete in all respect as per specifications.Supply, installation, testing and commissioning of cables laid on trays or wall. Complete in all respect as per specifications. 4C x 6 sq.mm XLPE insulated armoured ‘CU’ Cable ( IS -7098-Part-I)
4C x 2.5 sq.mm XLPE insulated armoured ‘CU’ Cable
Making cable termination of cables by using brass gland connecting to the terminals by using crimping type copper lugs, etc. complete as required. 4C x 6 sq.mm ‘CU’ Termination
4C x 2.5 sq.mm ‘CU’ Termination
Earthing
Supply, fixing of Copper Strip, laying, testing and commissioning of earthling flats using GI spacers and GI clamps for G 1 plate earthing (20 x 3 mm copper strip)
Supplying and fixing various type of MS material like angle, channel flat required for making tray as per requirement, which includes cutting, welding, painting with two coats of zinc rich epoxy and one coat of epoxy paint for 150 mm wide GI perforated cable tray.
Supply & fabrication of mild steel supports, U bolts, clamps, nuts & bolts, anchore fasteners for pipe support with painting (MS angle iron support of size 40X40X5 mm with 'U' Bolts & anchor faster duly painting with two coats of zinc rich epoxy & one coat of epoxy paint in Fire Red shade.)
Y' Type Strainer: Supplying, installing & testing of cast iron 'Y' type strainer with GI / Chromium plated matching flanges with GI nuts, bolts, washers etc. Complete as required as per PN 16, tested upto 24 kg/cm2 pressure.
PORTABLE FIRE EXTINGUISHERS
CO2 extinguisher 4.5 Kgs. capacity - IS 2878 complete with initial charge & supporting
AFFF extinguisher mechanical foam type 9.0 Liters capacity - IS 940 complete with initial charge & supporting
DCP powder type (ABC) 5 Kgs. - IS 2171 complete with initial charge & brackets
FIRE ALARM SYSTEM
Supply,installation,testing and commissioning of microprocessor based UN/EN 54 compliant analog addressable intelligent fire Fire alarm control single panel loop complete with central processing unit. Network communication card RS -485 port , 80 Characters LCD display with primary power supply at 230V with 24/36 volts. seal maintenance free (SMF) batteries backup ( as per IS ) complete with soild state boot/trickle automatic battery charger. The panel shall support Graphics package for central monitoring of all devices.
Supply,installation,testing and commissioning of hard addressable type manual call point, 1 stage with in built LED, lighting up automatically to confirm its actuation complete as per specification as required.
Supply,installtion,testing and commissoning of UL/EN listed wall mounted hooter with strobe (100 bda) complete as per specification as required.
Supply,installation,testing and commissioning of addressable input/out control module for shutting down AHU's,lift pressurization fans and ventilation fans etc. including power supply for dirving the control module as per requirement.
Supply,laying,testing and commissioning of point wiring for sensors and devices with 2 x 1.5 Sq.mm. FRLS PVC insulated multi-stranded single core copper conductor wire in M.S. conduit with conduit accessories including loop circuit from main fire alarm panel located at ground floor in fire control room complete as required.
SCH "A " SECTION - XII Lightening protection & aviation light Total of Sch " A " Section -II B/F from Serial Page No. 126
SCH "A " SECTION - XIII Excavation, Earthwork & Site Clearance Works Total of Sch " A " Section -III B/F from Serial Page No.135
SCH 'A' SECTION - XIV STRENGTHENING MEASURES BASED ON STRUCTURAL AUDIT REPORT in Bldg No. AFMC Major B3, AFMC Major B4, AFMC JCO B3, AFMC JCO B4, Lullanagar Ors B6, Lullanagar Ors B7, Lullanagar Ors B11, Lullanagar Ors B15, Lullanagar B17, Lullanagae Ors B18, 8 PWD Major B2, Lonavala Duke Nose B4.
Dismantling brick masonry in lime or cement mortar and stacking the materils asdirected with all leads, lifts etc.
Chipping of all loose and Spalling of concrete to bottom of slab, beams etc.(wherever required), cleaning of reinforcement, carrying out thorough sand blasting, application of anti- corrosive zinc rich epoxy primer to exposed reinforcement including cost of material, labour, equipment, tools, scaffolding etc. complete.
Providing & Applying DuraClean- WR - for cleaning the TMT bars, steel structure etc. of structure by Waterjet cleaning/ grinding the surface by grinder machine, wire brush, removing existing corrosion from the metal surface also removing loose particles(using other mechanical / manual means) and apply on prepared surface of DuraCap 2 coats corrosion preventive coat on prepared TMT bars, steel structure,metal surface etc. to protect it from corrosion etc. as per manufacturer's specification ( using other manual / mechinical means) complete as per specification including cost of all materials, machinery, labour, insurance charges as directed by the Engineer in charge.
Carry out application of "Bi-polar migratory corrosion inhibitor" on concrete surface. This inhibitor has migratory kind of property which permits the material to migrate to a virtual extent of 100mm, through pores of concrete,inhibiting the corrosion etc complete.
Cathodic Protection/Prevention using Dual Phase Hybrid Fusion anodes system: Providing and fixing self-powered dual phase Hybrid anode Galva shield Fusion T2-135 Type 2 Class C sacrificial zinc anode of Vector/ SRMPL/ Life Anode 65 Krishna Conchem Corrosion Technologies or equivalent make as approved by Engineer-in-Charge to protect and prevent initialization of corrosion of reinforcement in RCC Elements by installing anodes for entire surface of RCC element as per design based on corrosion rates as prescribed in contract document (spacing shall be 400 to 750mm as prescribed in tender document), as per manufacturer specification,covered with mortar with of resistivity less than of parent concrete including making connections with reinforcement steel as per manufacturers specification before applying cementatious overlay system at all heights and including of all design, rebar location, making chases, grooves for wire, checking connectivity with approved multimeter, drilling for rebar connection, establishing connection with rebar with special rebar connector, installing anodes with proper connection using buttom type connector and covering with mortar, material,labour, tools, plant and machineries, etc.complete as directed by Engineer-in-charge.
Providing, drilling and fixing Nipples/ Nozzles for pressure injection grouting of polymer cement grout / epoxy grout etc. Complete
Providing Grounting of nozzles with Low Viscosity Epoxy grout including material, labour complete in all respect.
Providing and fixing in position HCRM/CRS (CorrosionResistantSteel)bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Providing and applying epoxy bonding agent for bonding old to new concrete for structural members prior applying the epoxy mortar to the concrete surfaces etc complete.
Providing Repairing of honey combs and minor damages with Polymer Modified Morter including material, labour complete in all respect.
Re-casting of bracket with micro-concrete and 10 mm agrregate ( 1:1) with leakproof shuttering with all manpower and equipments complete in all respect
SCH 'A' SECTION - XV SEISMIC STRENGTHENING MEASURES BASED ON STRUCTURAL AUDIT REPORT
BLOCK NO. 3 (G+5) and BLOCK NO. 5 (G+8) STATION WORK SHOP
Providing and fabricating structural steel work in rolled sections like joints, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted/bolted/welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc complete.
Providing and fixing hilti bolts of 12mm dia and 100 embedded in concrete including all material and labour etc complete
Providing and fixing hilti bolts of 12mm dia and 150 embedded in concrete including all material and labour etc complete
Providing and fixing 12mm dia 8.8 grade bolts with drilling and grouting including all material and labour etc complete
BLOCK NO. 5 (G+8) STATION WORK SHOP
Removing/sismantling rich mix cement concrete/ PCC including stacking the spoils as directed with all leads, lifts etc complete.
Transportation of material obtained from excavation including soil, rubble, bricks, RCC concrete, kerb stones, steel railing, iron pipes, channels etc. Obtained from dismantling, loading in a truck of minimum 5 Cum. capacity or designed capacity and transporting within the municipal limits or any designated place of corporation as directed by engineer incharge unloading, stacking or spreading of material etc. complete.
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete.(Lift upto 1.5m.) By Mechanical Means
Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete
Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/granite/quartzite/gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant(Pan mixer) etc. complete. With fine aggregate(Crushed sand VSI Grade)
Providing and fixing in position TMT-FE-500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer's recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500-12mm dia 240mm depth
Providing and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/granite/quartzite/gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete.(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant(Pan mixer) etc. complete. With fine aggregate(Crushed sand VSI Grade)
Provisional sum for shifting of Electrical lines from Maharashtra State Electricity Distribution Co. Ltd both for KV and Lullanagar.
SCH "A " SECTION - XVI DEMOLITION /DISMANTLING & CREDIT Total of Sch " A " Section -XV B/F from Serial Page No 139 (R)
SCH "A " SECTION - XVI SCH 'A' SECTION- XVII SCHEDULE OF CREDIT Total of Sch " A " Section -XVI B/F from Serial Page No. 146 AA(R)
sambhu constriction company (BID ID -3094134)
K R TRADERS (BID ID -3076842)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid