Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 182 INDRA COLONY VILL DAMODARPURA POST TODABHATA TEA BASSI BASSI JAIPUR JAIPUR RAJASTHAN 303301 | JAIPUR | RAJASTHAN | 303301 | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
| 3 | Accepted-Technical | Accepted-Technical ok |
| 4 | Accepted-Technical 311 6 TEJPUR GADBADI INDORE MADHYA PRADESH 452001 | INDORE | MADHYA PRADESH | 452001 | Accepted-Technical ok |
| 5 | Accepted-Technical 15A 17 KRYSTAL HOUSE DUNCAN CAUSEWAY ROAD SION MUMBAI MAHARASHTRA 400022 | MUMBAI | MAHARASHTRA | 400022 | Accepted-Technical ok |
Tender Value
₹7.5 Cr
EMD Value
₹3.8 L
Closing Date
13 Apr 2026, 6:00 pmClosed
cmo office
cmo office
Interception and Diversion of Nallahs with STP works Projectofseoni malwa town under SBM 2.0
2026_UAD_483523_1
266
Open Tender
Miscellaneous Works
Item Rate
365 days
works
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹3.8 L
15 Jun 2026
18 Feb 2026
15 Apr 2026
18 Feb 2026
13 Apr 2026
18 Feb 2026
1 Design and build sewage treatment plant of installed capacity 3.00 MLD and all appurtenant structures and allied works; 2 Construction of Rcc sump well along with providing and installing pumps and pumping main comprising of DIK7 class pipe of 150- & 300-mm diameter having length of 1800 & 50 m respectively from sump well to STP 3 Construction of 2 Nos Interception Diversion Structure. (I&D-1= L-25 m, H-1.0 m, FTL-1.55 MLD) (I&D-2= L-11 m, H-1.0 m, FTL-1.15 MLD) 4 Providing and laying of HT Feeder having the length of 2.40 kms. and Electrical 1 Nos. Substations 5 Reuse of the Treated Sewer water for the Green space comprising of Dik7 pipe of 150mm diameter having the length of 3200 meters.
Operation and Maintenance Cost For 1st Years
Operation and Maintenance Cost For 2nd Years
Operation and Maintenance Cost For 3rd Years
Operation and Maintenance Cost For 4th Years
Operation and Maintenance Cost For 5th Years
Operation and Maintenance Cost For 6th Years
Operation and Maintenance Cost For 7th Years
Operation and Maintenance Cost For 8th Years
Operation and Maintenance Cost For 9th Years
Operation and Maintenance Cost For 10th Years
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 1st year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 2nd year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 3rd year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 4th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 5th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 6th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 7th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 8th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 9th year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B) For 10th year
Power Consuption @ 6.5 Rs per unit For 1st Year
Power Consuption @ 6.5 Rs per unit For 2nd Year
Power Consuption @ 6.5 Rs per unit For 3rd Year
Power Consuption @ 6.5 Rs per unit For 4th Year
Power Consuption @ 6.5 Rs per unit For 5th Year
Power Consuption @ 6.5 Rs per unit For 6th Year
Power Consuption @ 6.5 Rs per unit For 7th Year
Power Consuption @ 6.5 Rs per unit For 8th Year
Power Consuption @ 6.5 Rs per unit For 9th Year
Power Consuption @ 6.5 Rs per unit For 10th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 1st Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 2nd Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 3rd Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 4th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 5th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 6th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 7th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 8th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 9th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) © for 10th Year
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
tenderformreal1.pdf
Tender Documents • 1.80 MB
adddocument.pdf
Additional Documents • 2.63 MB
BOQ_568265.xls
BOQ • 0.26 MB
222.pdf
PDF • 1.84 MB
gggggggggggggggggggggggggggggggggg.pdf
PDF • 1.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .