| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC NEAR GAYATRI PEETH MANDIR JAY NAGAR TEH NAJIBABAD DISTT BIJNOR | ₹4.8 L | L1 | Accepted-AOC accepted |
| 2 | L2₹5.3 L+₹52,460.75 (10.9%)Rejected-AOC | ₹5.3 L+₹52,460.75 (10.9%) | L2 | Rejected-AOC rejected |
| 3 | L3₹5.8 L+₹97,838.93 (20.3%)Rejected-AOC | ₹5.8 L+₹97,838.93 (20.3%) | L3 | Rejected-AOC rejected |
| 4 | L4₹6.6 L+₹1.8 L (36.4%)Rejected-AOC 1098 BAZAR KHOHAL GORAKHPUR UTTAR PRADESH | ₹6.6 L+₹1.8 L (36.4%) | L4 | Rejected-AOC rejected |
| 5 | L5₹6.6 L+₹1.8 L (36.4%)Rejected-AOC | ₹6.6 L+₹1.8 L (36.4%) | L5 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | RAJENDRA SINGH L4 | M/S PARVEEN SINGH L5 | M/S SANJEEV KUMAR CONTRACTOR L2 | KAUSHIK CONSTRUCTION AND SUPPLIERS L1 | M/S DELTA CONSTRUCTION L6 | CHAUDHARY CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||||||
| 1.01 | Providing and Filling E.C. bags with ordinary earth i/c placing in position within lead of 60M including all cost of E.C. bags, labour, T&P etc. for complete the work. | 6,911 | Nos. | 10 ₹69,110 | 10.65 ₹73,602.15 | 11 ₹76,021 | 8.6 ₹59,434.6 Lowest | 13 ₹89,843 | 10.22 ₹70,630.42 |
| 1.02 | Providing of Nylon crate size 1.0×1.0×1.0 M with mesh size 20.00×20.00 cm and weight not less than 300 gram. i/c all cost of material, labour & T&P etc. complete. | 194 | Nos. | 55 ₹10,670 Lowest | 100 ₹19,400 | 70 ₹13,580 | 64.8 ₹12,571.2 | 102 ₹19,788 | 77 ₹14,938 |
| 1.03 | Providing, Laying and fixing of R.C.C porcupine set M20 grade (1:1.5:3) as directed by Engineer-in-charge, including all cost of material, labour, T&P, carriage, etc. required for proper completion of work. | 78 | Nos. | 6,000 ₹4,68,000 | 5,500 ₹4,29,000 | 4,078 ₹3,18,084 Lowest | 4,176 ₹3,25,728 | 6,300 ₹4,91,400 | 5,040 ₹3,93,120 |
| 1.04 | Providing & fixing of bamboo bracing 50 to 80 mm dia and Avg 6.00 mt length in studs i/c cost of all material, labour, T&P and taxes etc. required for completion of work. | 1,212.75 | RM. | 46 ₹55,786.5 | 65.6 ₹79,556.4 | 60 ₹72,765 | 41 ₹49,722.75 Lowest | 60 ₹72,765 | 49.21 ₹59,679.43 |
| 1.05 | Providing & filling Jhakhar or Jhau and placing in position including carriage upto 1 km. all cost of Labour, T&P etc. Complete of work as directed by Eng-in-Charge. | 430.5 | Cum. | 110 ₹47,355 | 115 ₹49,507.5 | 110 ₹47,355 | 70 ₹30,135 Lowest | 110 ₹47,355 | 84.7 ₹36,463.35 |
| 1.06 | Providing of 8 Swg G.I. Wire for tying of porcupines or other works as tying tree branches etc. including all cost of Materials, Labour, T&P etc. Complete of work. | 49.94 | Kg. | 100 ₹4,994 | 100 ₹4,994 | 110 ₹5,493.4 | 65 ₹3,246.1 Lowest | 98 ₹4,894.12 | 77 ₹3,845.38 |
Tender Value
₹8.3 L
EMD Value
₹17,000
Closing Date
8 Jun 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER AFZALGARH IRRIGATION DIVISION DHAMPUR
LOT 07 Janpad Bijnor mein Dhara Nadi ke daaye kinare par Pili Bandh ke Km 13.000 ke nikat bandh ki suraksha hetu kataav nirodhak karya.
2026_UPIDC_1156368_7
02/EEAID/2026-27
Open Tender
Civil Works
Item Rate
12 days
DHAMPUR
AS PER NIT
2 documents required · 2 mandatory
₹766
₹17,000
16 Jun 2026
2 Jun 2026
8 Jun 2026
2 Jun 2026
8 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Providing and Filling E.C. bags with ordinary earth i/c placing in position within lead of 60M including all cost of E.C. bags, labour, T&P etc. for complete the work. | 6,911 | Nos. | 14.6 | ₹1,00,900.6 |
| 1.02 | Providing of Nylon crate size 1.0×1.0×1.0 M with mesh size 20.00×20.00 cm and weight not less than 300 gram. i/c all cost of material, labour & T&P etc. complete. | 194 | Nos. | 110 | ₹21,340 |
| 1.03 | Providing, Laying and fixing of R.C.C porcupine set M20 grade (1:1.5:3) as directed by Engineer-in-charge, including all cost of material, labour, T&P, carriage, etc. required for proper completion of work. | 78 | Nos. | 7,200 | ₹5,61,600 |
| 1.04 | Providing & fixing of bamboo bracing 50 to 80 mm dia and Avg 6.00 mt length in studs i/c cost of all material, labour, T&P and taxes etc. required for completion of work. | 1,212.75 | RM. | 70.3 | ₹85,256.33 |
| 1.05 | Providing & filling Jhakhar or Jhau and placing in position including carriage upto 1 km. all cost of Labour, T&P etc. Complete of work as directed by Eng-in-Charge. | 430.5 | Cum. | 121 | ₹52,090.5 |
| 1.06 | Providing of 8 Swg G.I. Wire for tying of porcupines or other works as tying tree branches etc. including all cost of Materials, Labour, T&P etc. Complete of work. | 49.94 | Kg. | 110 | ₹5,493.4 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.58 MB
BOQ_2166805.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .