Loading…
Loading…
Tender Value
₹16.2 L
EMD Value
₹32,400
Closing Date
28 Jul 2026, 3:00 pm3d left
Ex. Eng., Meerut Division Ganga Canal, Meerut
Office of the Ex. Eng., Meerut Division Ganga Canal, Meerut
02/EE/2026-27 Reconstruction of Box Culvert (V.R.B) at Km 2.680 of Aghera minor in District Meerut. (Lot-02)
2026_UPIDC_1171721_3
02/EE/2026-27
Open Tender
Civil Works - Canal
Piece-work
60 days
As per Tender Notice
As per Tender Notice
2 documents required · 2 mandatory
₹944
₹32,400
23 Jul 2026
23 Jul 2026
28 Jul 2026
23 Jul 2026
28 Jul 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling bricks work or stone work and cement concrete in cement mortar and inlcuding stacking of material with in a distance of 6M as per direction of Engineer-in-Charge. | - | Cum | - | - |
| 2 | Earth work in embankment by power tranported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders. | 1 | Cum | - | - |
| 3 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-incharge up to a distance of 30M from the foundation trenches. | 1 | Cum | - | - |
| 4 | Providing and Fixing RCC 900 mm dia Hume pipe NP-3 (S&S) I.S.I. Mark including loading, unloading, and shifting. | - | RM | - | - |
| 5 | Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work etc. | - | Sqm | - | - |
| 6 | Providing and laying Cement concrete M-15 (1:2:4) with A-20 including cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work as directed by engineer-in-charge. | 1 | Cum | - | - |
| 7 | Providing and laying Cement concrete M-20 (1:1.5:3) with A-20 including cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work as directed by engineer-in-charge. | - | Cum | - | - |
| 8 | Centering and shuttering for R.C.C. work in box culvert including cost of centering and shuttering up to 3 m height | 1 | Sqm | - | - |
| 9 | Providing and laying Reinforced Cement concrete M-25 (1:1:2) with A-20 including cost of all material, labour, mechanical mixing & vibration T&P etc. required for proper completion of work as directed by engineer-in-charge. | - | Cum | - | - |
| 10 | Providing steel reinforcement including cost of material, Bending, binding, cutting and placing of reinforcement including cost of binding wire. | - | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.29 MB
Tendernotice_2.pdf
PDF • 2.07 MB
BOQ_2199845.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].