| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹25.7 LAccepted-AOC | ₹25.7 L | 1ST | Accepted-AOC SUCCESSFUL |
| 2 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
| 3 | Rejected-Technical CLASS 1 CONTRACTOR OPP 8895 14 0000 | - | - | Rejected-Technical UNSUCCESSFUL |
| 4 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
| 5 | Rejected-Technical | - | - | Rejected-Technical UNSUCCESSFUL |
Tender Value
₹25.7 L
EMD Value
₹25,690
Closing Date
26 Mar 2026, 5:00 pmClosed
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Construction of drain and Box Culvert near Central School towards urvashi vihar in ward no.19
2026_ORULB_127314_2
43/SMC_SBP/2025-26
Open Tender
Civil Works - Others
Percentage
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹25,690
Yes
30 Jun 2026
17 Mar 2026
30 Mar 2026
17 Mar 2026
26 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of Engineer. | 193.72 | cum | 276.9 | ₹53,641.07 |
| 2 | Dismentaling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead | 133.2 | cum | 858.6 | ₹1,14,365.52 |
| 3 | Supply fillimg sand in F & P including cost, conveyance & royalty od sand cost of all labour cess, Watering, raming etc | 54.14 | cum | 815.5 | ₹44,151.17 |
| 4 | Cement Concrete (1:4:8) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete | 34.03 | cum | 5,432.2 | ₹1,84,857.77 |
| 5 | Cement Concrete (1:2:4) using 12mm size B.H.G. (C. B.) Chips including cost, conveyance , royalty & taxes of all materials etc. complete | 2.62 | cum | 7,458.5 | ₹19,541.27 |
| 6 | Rigid & smooth centering & shuttering for C.C.works including dismantling for reuse after casting etc. complete.
Drain wall | 845.34 | SQM | 248.7 | ₹2,10,236.06 |
| 7 | Abutment | 235.38 | SQM | 904.29 | ₹2,12,851.78 |
| 8 | R.C.C. M20 grade using 20mm and down graded size chips including cost conveyance etc. complete | 146.82 | SQM | 5,952.5 | ₹8,73,946.05 |
| 9 | Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification | 99.94 | qntl | 8,559.3 | ₹8,55,416.44 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585349.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_585349.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .