Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹36.3 LAccepted-AOC 220 A P COLONY GAYA BIHAR 800023 | PATNA | BIHAR | 800023 | ₹36.3 L | L-1 | Accepted-AOC L1 |
| 2 | L-2₹47.0 L+₹10.7 L (29.6%)Rejected-Finance 801 RAMESHWAR APARTMENT JALARAM T STREET NO 2 3 UNIVERSITY ROAD RAJKOT 360005 GUJRAT | RAJKOT | GUJARAT | 360005 | ₹47.0 L+₹10.7 L (29.6%) | L-2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical NUAPATANA P O BANGUARI P S BALIANTA KHURDA 751032 | KHORDHA | ODISHA | 751032 | - | - | Rejected-Technical The bidder has not submitted documents as per the clarification sought during shortfall. Hence, not eligible for opening of financial bid. |
| Sl No | Description | Qty | Unit | Parikh Kashyap Indulal L2 | M/s Awadhesh Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Supplying of aqua based non reflective type road marking paint of required make and shade confirming to the specification of AAI complete as approved by Engineer-in-charge. (The rate is exclusive of GST and inclusive of cost of material, transportation, unloading at designated AAI store at B.P.I Airport, Bhubaneswar )
a) White | 6,204 | Ltrs | 161 ₹9,98,844 | 155 ₹9,61,620 Lowest |
| 2.00 | Supplying of aqua based non reflective type road marking paint of required make and shade confirming to the specification of AAI complete as approved by Engineer-in-charge. (The rate is exclusive of GST and inclusive of cost of material, transportation, unloading at designated AAI store at B.P.I Airport, Bhubaneswar )
b) Yellow | 1,936 | Ltrs | 161 ₹3,11,696 Lowest | 165 ₹3,19,440 |
| 3.00 | Supplying of aqua based non reflective type road marking paint of required make and shade confirming to the specification of AAI complete as approved by Engineer-in-charge. (The rate is exclusive of GST and inclusive of cost of material, transportation, unloading at designated AAI store at B.P.I Airport, Bhubaneswar )
c) Red | 374 | Ltrs | 190 ₹71,060 | 170 ₹63,580 Lowest |
| 4.00 | Supplying of aqua based non reflective type road marking paint of required make and shade confirming to the specification of AAI complete as approved by Engineer-in-charge. (The rate is exclusive of GST and inclusive of cost of material, transportation, unloading at designated AAI store at B.P.I Airport, Bhubaneswar )
d) Black | 1,276 | Ltrs | 161 ₹2,05,436 | 140 ₹1,78,640 Lowest |
| 5.00 | Painting runway/taxi track/apron or other airfield markings of any size and length i/c letter & numeral markings with cold applied water based non-reflective paint using suitable airless paint spray machine i/c cleaning of the area to be painted of all dirt, dust, stains, oily substances and other foreign material all complete as per specifications and direction of Engineer-in-Charge. (Paint shall be supplied by AAI free of cost. Payment shall be made for labour, machinery and all materials except paint)
One or more coats | 45,761 | Sqm | 19 ₹8,69,459 | 15 ₹6,86,415 Lowest |
| 6.00 | Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign mater;al etc. and lining out complete. (Paint shall be supplied by AAI )
Old work (One or more coats) | 49,069 | Sqm | 30 ₹14,72,070 | 15 ₹7,36,035 Lowest |
| 7.00 | Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign mater;al etc. and lining out complete. (Paint shall be supplied by AAI )
New work (Two or more coats) | 2,500 | Sqm | 40 ₹1,00,000 | 29 ₹72,500 Lowest |
| 8.00 | Supplying of reflective type road marking paints of approved make Rapid Acrylic Water Based Trafic Paint and shade confirming to the specification and as approved by Engineer-in-charge. | 2,000 | Kg | 265 ₹5,30,000 | 249 ₹4,98,000 Lowest |
| 9.00 | Supplying of glass beads confirming to the specification complete and as approved by Engineer-in-charge. | 1,050 | Kg | 135 ₹1,41,750 | 105 ₹1,10,250 Lowest |
Tender Value
₹81.4 L
EMD Value
₹2.4 L
Closing Date
22 Aug 2025, 6:00 pmClosed
Senior Manager (Engg-Civil)
O/o DGM (E-C), BPI Airport, Bhubaneswar
Annual Maintenance Contract for painting of markings on runway, taxiway, apron and other pavements at BPI Airport Bhubaneswar
2025_AAI_243535_1
AAI/BS/ENGG(C)/NIT-05/2025-26
Open Tender
Civil Works
Works
730 days
B.P.I. Airport, Bhubaneswar
Please refer Tender documents.
16 documents required · 16 mandatory
₹1,180
₹2.4 L
10 Aug 2026
1 Aug 2025
25 Aug 2025
1 Aug 2025
22 Aug 2025
1 Aug 2025
1 Aug 2025 - 8 Aug 2025
Amount
Supplying of aqua based non reflective type road marking paint of required make and shade confirming to the specification of AAI complete as approved by Engineer-in-charge. (The rate is exclusive of GST and inclusive of cost of material, transportation, unloading at designated AAI store at B.P.I Airport, Bhubaneswar ) a) White
Supplying of aqua based non reflective type road marking paint of required make and shade confirming to the specification of AAI complete as approved by Engineer-in-charge. (The rate is exclusive of GST and inclusive of cost of material, transportation, unloading at designated AAI store at B.P.I Airport, Bhubaneswar ) b) Yellow
Supplying of aqua based non reflective type road marking paint of required make and shade confirming to the specification of AAI complete as approved by Engineer-in-charge. (The rate is exclusive of GST and inclusive of cost of material, transportation, unloading at designated AAI store at B.P.I Airport, Bhubaneswar ) c) Red
Supplying of aqua based non reflective type road marking paint of required make and shade confirming to the specification of AAI complete as approved by Engineer-in-charge. (The rate is exclusive of GST and inclusive of cost of material, transportation, unloading at designated AAI store at B.P.I Airport, Bhubaneswar ) d) Black
Painting runway/taxi track/apron or other airfield markings of any size and length i/c letter & numeral markings with cold applied water based non-reflective paint using suitable airless paint spray machine i/c cleaning of the area to be painted of all dirt, dust, stains, oily substances and other foreign material all complete as per specifications and direction of Engineer-in-Charge. (Paint shall be supplied by AAI free of cost. Payment shall be made for labour, machinery and all materials except paint) One or more coats
Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign mater;al etc. and lining out complete. (Paint shall be supplied by AAI ) Old work (One or more coats)
Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign mater;al etc. and lining out complete. (Paint shall be supplied by AAI ) New work (Two or more coats)
Supplying of reflective type road marking paints of approved make Rapid Acrylic Water Based Trafic Paint and shade confirming to the specification and as approved by Engineer-in-charge.
Supplying of glass beads confirming to the specification complete and as approved by Engineer-in-charge.
Parikh Kashyap Indulal (BID ID -886444)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .