Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -23.11% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
15 Jan 2026, 6:00 pmClosed
Executive Engineer Flood Control Division Kakapora
Executive Engineer Flood Control Division Kakapora
Restoration of Sloughed Embankment on left side of River Jhelum RD 33000m at Goripora by way of RCC Cantilever Retaining Wall and Stone Pitching
2026_IFC_299807_4
e-NIT NO 27 of 2025-2026
Open Tender
Civil Works
75 days
Kakapora
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Superintending Engineer Hydraulic Circle Pulwama H
₹4.0 L
Superintending Engineer Hydl.Circle Pul HQ..Shopai
19 Feb 2026
3 Jan 2026
16 Jan 2026
3 Jan 2026
15 Jan 2026
3 Jan 2026
7 Jan 2026
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil
Extra for, in or under water and/ or liquid mud, incl. pumping out water as required
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil 1st lift.
2nd lift
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). Depth exceeding 3 m but not exceeding 4.50m
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered). Depth exceeding 1.5 m but not exceeding 3m
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, band beams, bases for columns etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Dry stone pitching (any thickness) excluding cost of stones. On slopes
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100 sq m on horizontal/side slopes; complete including curing.
6mm thick ply for Expansion joint
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bars
Dumping of Stones. Vertical (slope)
Horizontal
Supply of quarry stones
Carriage of materials from source to road site by mechanical transport including loading, unloading and stacking. Stones avg lead 11 km
Cement from avg. 02 km
Sand from avg. 05km
Aggregative from avg. 08km
Steel for an avg. 02 km
PVC pipes 3'' in dia for weepholes
Rapidite
Taking , editing & printing of HD photographes , before during and after execution of work ( Photograph Size 6"x 4")
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_972710.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid