Tender Value
₹12.7 L
EMD Value
₹26,000
Closing Date
22 Jun 2026, 9:00 amClosed
EE RED FATEHPUR
VIKAS BHAWAN FATEHPUR
Amar Shaheed Jodha Singh Ataiya Thakur Dariyaon Singh Medical College Fatehpur me Kratim Ango Ke Bhandaran Hetu Bhandaran Kaksh Nirman.
2026_REDUP_1160963_1
290/RED/E-Tender/2026-27 Date 16-05-2026
Open Tender
Civil Works
Percentage
90 days
FATEHPUR
PREFIRED NIT
3 documents required · 3 mandatory
₹765
₹26,000
VIKAS BHAWAN FATEHPUR
18 Sept 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam,clay and
sand) including lift upto 1.50 m and lead 50 m & including
filling, watering and ramming of excavated earth into the
trenches to the space between the building and the sides of
foundation trenches or into the plinth and removal and
disposal of surplus earth D.S.R No. 2.6.1 | 74.38 | Cum | 122.78 | ₹9,132.72 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (Under Floor) as per DSR.No. 2.25 (a) | 36 | Cum | 484.56 | ₹17,444.05 |
| 3 | Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone ballast 40 mm nominal size) and curing complete, including cost of form- work, in foundation.(DSR-4.1.8) | 17.27 | Cum | 4,712.03 | ₹81,381.44 |
| 4 | Providing and injecting chemical emulsion for pre constructional -creating a chemical barrier under the around the column pits, walltrenches,effacement excavation top surface of plinth ,filling junction of wall and floors ,along the external perimeter of building expansion joints etc complete Plinth area of the building at ground floor only shall be measured as per IS 6313 (part II 1981) Aldrine emulsifiable concentrate or any other approved material such as chloropyriphos or heptatachlor or chlodrance will be used the rate of aplication of chemical emulsion shall be as follows- i)Treatment for masonary and foundation/top surface of plinth filling/soil under apron along external perimeter 5 Itr per sqm (ii) backfill in immediate contact with foundation/junctions of walls and floors /soil along external perimeter of building @ 7.5 ltr per sqm As per D.S.R No. 2.35.3.1 | 150 | sqm | 214.47 | ₹32,170.8 |
| 5 | Providing and laying in cement concrete 1:3:6 (6: stone
ballast 40 mm gauge nominal size: 4 coarse sand: 1
cement) including supply of all materials,labour and T&P
et.required for proper completion of the work and curring
complete,also including cost of form work In foundation and
floors. As per D.S.R. No. 4.1.5 | 4.75 | Cum | 5,045.93 | ₹23,978.24 |
| 6 | M-150 class brick work in 1:4 cement and coarse sand
mortar in in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of thework As per DS.R. No. 6.1.1 | 16.54 | cum | 5,098.46 | ₹84,323.43 |
| 7 | M-150 class brick work in 1:4 cement and coarse sand
mortar in Super Structure including supply of all materials,
labour and T&P etc. required for proper completion of the
work as Per D.S.R. NO. 6.4.1 | 18.19 | cum | 6,463.71 | ₹1,17,594.36 |
| 8 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dresing complete.DSR 2.27 | 12 | Cum | 1,469.05 | ₹17,628.62 |
| 9 | R.C.C. work with cement approved coarse sand and 2 cm. Gauge approved stone grit in propottions of 1:2:4 in lintels of door and windows excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc required forproper completion ofthe work including cost of binding wire. The rate excludes making of drip course which shall be paidextra as per D.S.R. No. 5.1.3 | 23.94 | cum | 5,937.35 | ₹1,42,158.52 |
| 10 | P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. DSR 5.22.6 | 35.71 | Qtl | 7,460.25 | ₹2,66,413.82 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
Tendernotice_2.pdf
PDF • 1.55 MB
BOQ_2175937.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .