| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC | ₹30.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.5 LRejected-AOC | ₹30.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SRI SRI SAI EMISSION TESTING CENTRE L1 | HARI CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.01Construction of Causeway (piped Culvert) at Kannarapattu Road | |||||
| 1.03 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course | 40.5 | m2 | 5,706 ₹2,31,093 | 6,500 ₹2,63,250 |
| 1.04 | Supplying and erecting centering shuttering including necessary supports for plane surface I foundation and superstructure | 311.64 | m3 | 543 ₹1,69,220.52 | 560 ₹1,74,518.4 |
| 1.06 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure | 120.22 | m3 | 7,001.49 ₹8,41,719.13 | 7,001.49 ₹8,41,719.13 |
| 1.07 | Laying Well Gravelincluding cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. | 185.74 | m3 | 474.4 ₹88,115.06 | 474.4 ₹88,115.06 |
| 1.09 | Construction of Granular sub base by providing well graded material (25mm to 4.75mm IRC HBG metal @ 65% 4375 to 2.36mm IRC HBG metal @ 20% & spreading in uniform layers with lota grader on prepared as per specification | 99 | m2 | 2,477.59 ₹2,45,281.41 | 2,477.59 ₹2,45,281.41 |
| 1.10 | Guard Stone (Top 0.7m Chised dressed and 0.50m bottom roughly dressed) 0.23 x 0.23 x 0.90 long ( Two line dressed top 45cm) 23cm dia0.90m long including cost and conveyance of material | 129 | m2 | 250 ₹32,250 | 250 ₹32,250 |
| 1.12 | Supplying of NP3Class RCC pipe conforming to IS 458/2003 including cost of proce as a finshed work including all other incidental charge testing charges includng loading unloading transport and delivery directed by the Departmental officers and as per standard specifications | 225 | m2 | 4,088.9 ₹9,20,002.5 | 4,088.9 ₹9,20,002.5 |
| 1.13 | Hoisting and fixing of NP3 Class RCC Pipe and Collars in proper gradient including all labour charges and all other incidential charges | 60 | m3 | 247.17 ₹14,830.2 | 247.17 ₹14,830.2 |
| 1.15 | Provision for Name board charges etc., | 1 | m3 | 4,500 ₹4,500 | 4,500 ₹4,500 |
Tender Value
₹30.4 L
EMD Value
₹31,000
Closing Date
30 Dec 2025, 3:00 pmClosed
The Additional Collector
DRDA, Viluppuram
TNVPM/Savings/002
2025_RDTN_635165_2
TNVPM/Savings
Open Tender
Civil Works
180 days
Viluppuram District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹31,000
Yes
29 Apr 2026
23 Dec 2025
30 Dec 2025
23 Dec 2025
30 Dec 2025
23 Dec 2025
Amount
Construction of Causeway (piped Culvert) at Kannarapattu Road
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Supplying and erecting centering shuttering including necessary supports for plane surface I foundation and superstructure
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure
Laying Well Gravelincluding cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete.
Construction of Granular sub base by providing well graded material (25mm to 4.75mm IRC HBG metal @ 65% 4375 to 2.36mm IRC HBG metal @ 20% & spreading in uniform layers with lota grader on prepared as per specification
Guard Stone (Top 0.7m Chised dressed and 0.50m bottom roughly dressed) 0.23 x 0.23 x 0.90 long ( Two line dressed top 45cm) 23cm dia0.90m long including cost and conveyance of material
Supplying of NP3Class RCC pipe conforming to IS 458/2003 including cost of proce as a finshed work including all other incidental charge testing charges includng loading unloading transport and delivery directed by the Departmental officers and as per standard specifications
Hoisting and fixing of NP3 Class RCC Pipe and Collars in proper gradient including all labour charges and all other incidential charges
Provision for Name board charges etc.,
Provision for Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
HARI CONSTRUCTION (BID ID -1549768)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Pack2.pdf
Tender Documents • 0.88 MB
BOQ_760097.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid