Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | ₹10.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.6 L+₹70,542.81 (6.48%)Rejected-Finance | ₹11.6 L+₹70,542.81 (6.48%) | L2 | Rejected-Finance L2 |
| 3 | L3₹12.9 L+₹2.0 L (18.7%)Rejected-Finance | ₹12.9 L+₹2.0 L (18.7%) | L3 | Rejected-Finance L3 |
Tender Value
₹13.3 L
EMD Value
₹26,520
Closing Date
23 Apr 2026, 5:00 pmClosed
EE BCD PAKUR
EE BCD PAKUR
RENOVATION AND RAISING OF PROPERTY WALL IN MANDAL KARA BLOCK - PAKUR DIST - PAKUR
2026_BCD_112475_3
05/2026-27/EE/BCD/PAKUR
Open Tender
Civil Works - Buildings
Percentage
60 days
PAKUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
₹26,520
7 Jul 2026
10 Apr 2026
25 Apr 2026
10 Apr 2026
23 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth, watering and disposal of unserviceable materials with all leads all complete as per direction of E/I. | - | Sqm | - | - |
| 2 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | - | cum | - | - |
| 3 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | - | cum | - | - |
| 4 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. | - | cum | - | - |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) | - | cum | - | - |
| 6 | TOR Steel in reinforcement - 8 mm | - | MT | - | - |
| 7 | 10 mm | - | MT | - | - |
| 8 | Cost of shuttering of stiffners | - | Sqm | - | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 10 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_152065.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_152065.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .