| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.5 CrAccepted-AOC 807 PEARL BUSINESS PARK NETAJI SUBHASH PLACE PITAMPURA DELHI | DELHI | DELHI | ₹64.5 Cr | L1 | Accepted-AOC Being L1 bidder |
| 2 | L2₹76.2 CrRejected-Finance RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹76.2 Cr | L2 | Rejected-Finance Being L2 bidder |
Tender Value
Refer Docs
EMD Value
₹1.3 Cr
Closing Date
21 Mar 2022, 5:00 pmClosed
DGM FSCL
Faridabad Smart City Limited 3rd Floor, Nain Sadan Building Plot No. 35, 20A, Faridabad, Haryana.
TREATMENT OF WASTE WATER BY CONSTRUCTING DECENTRALIZED WASTE WATER TREATMENT PLANT 08 NOS. ON EPC MODE
2022_HRY_207471_1
FSCL/2022/251
Open Tender
Civil Works - Others
456 days
Faridabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹1.3 Cr
FSCL OFFIICE
21 Apr 2022
10 Feb 2022
22 Mar 2022
10 Feb 2022
21 Mar 2022
17 Feb 2022
15 Feb 2022
Amount
TREATMENT OF WASTE WATER BY CONSTRUCTING DECENTRALIZED WASTE WATER TREATMENT PLANT (08 NOS.) ON EPC MODE
(1) 15 MLD STP AT SECTOR 33, FARIDABAD
Survey, Investigation, Design (including vetting from IIT/NIT), Manufacture, Supply, Erection, Construction, Trial Run for three months and Commissioning of all civil, electrical, mechanical and SCADA works for 15 MLD capacity Sequential Batch Reactor Type Sewage Treatment Plant and Tertiary Treatment including Multi Grade Filter and Activated Carbon Filter, etc. complete with clear water reservoir and pumping station complete on turn-key basis as per detailed scope of work.
Providing, laying and jointing 600 mm diameter Dl pipe line class K-9 with inside cement mortar lining complete with all required appurtenances valves earth work in excavation in all sorts of soil complete job including survey investigation design etc.
Provision of minimum 2.1 m high boundary wall with Gate and 1m high barbed wire fencing above DPC of boundary wall complete with RCC columns with footings, beams, etc.
Operation of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. –Rates are covered under DLP for the 1st year maintenance and hence no rate shall be provided to the contractor for maintenance of 1st year.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 2nd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 3rd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 4th year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 5th year after completion of trial run period and commissioning of project.
(2) 5 MLD STP AT PYALI CHOWK, FARIDABAD
Survey, Investigation, Design (including vetting from IIT/NIT), Manufacture, Supply, Erection, Construction, Trial Run for three months and Commissioning of all civil, electrical, mechanical and SCADA works for 5 MLD capacity Sequential Batch Reactor Type Sewage Treatment Plant and Tertiary Treatment including Multi Grade Filter and Activated Carbon Filter, etc. complete with clear water reservoir and pumping station complete on turn-key basis as per detailed scope of work.
Providing, laying and jointing 300 mm diameter Dl pipe line class K-9 with inside cement mortar lining complete with all required appurtenances valves earth work in excavation in all sorts of soil complete job including survey investigation design etc.
Provision of minimum 2.1 m high boundary wall with Gate and 1m high barbed wire fencing above DPC of boundary wall complete with RCC columns with footings, beams, etc.
Operation of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. –Rates are covered under DLP for the 1st year maintenance and hence no rate shall be provided to the contractor for maintenance of 1st year.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 2nd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 3rd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 4th year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 5th year after completion of trial run period and commissioning of project.
(3) 2 MLD STP AT SECTOR 45, FARIDABAD
Survey, Investigation, Design (including vetting from IIT/NIT), Manufacture, Supply, Erection, Construction, Trial Run for three months and Commissioning of all civil, electrical, mechanical and SCADA works for 2 MLD capacity Sequential Batch Reactor Type Sewage Treatment Plant and Tertiary Treatment including Multi Grade Filter and Activated Carbon Filter, etc. complete with clear water reservoir and pumping station complete on turn-key basis as per detailed scope of work.
Providing, laying and jointing 200 mm diameter Dl pipe line class K-9 with inside cement mortar lining complete with all required appurtenances valves earth work in excavation in all sorts of soil complete job including survey investigation design etc.
Provision of minimum 2.1 m high boundary wall with Gate and 1m high barbed wire fencing above DPC of boundary wall complete with RCC columns with footings, beams, etc.
Operation of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. –Rates are covered under DLP for the 1st year maintenance and hence no rate shall be provided to the contractor for maintenance of 1st year.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 2nd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding thepower charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 3rd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 4th year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 5th year after completion of trial run period and commissioning of project.
(4) 2 MLD STP AT VILLAGE JHARSAINTLY, FARIDABAD
Survey, Investigation, Design (including vetting from IIT/NIT), Manufacture, Supply, Erection, Construction, Trial Run for three months and Commissioning of all civil, electrical, mechanical and SCADA works for 2 MLD capacity Sequential Batch Reactor Type Sewage Treatment Plant and Tertiary Treatment including Multi Grade Filter and Activated Carbon Filter, etc. complete with clear water reservoir and pumping station complete on turn-key basis as per detailed scope of work.
Providing, laying and jointing 200 mm diameter Dl pipe line class K-9 with inside cement mortar lining complete with all required appurtenances valves earth work in excavation in all sorts of soil complete job including survey investigation design etc.
Provision of minimum 2.1 m high boundary wall with Gate and 1m high barbed wire fencing above DPC of boundary wall complete with RCC columns with footings, beams, etc.
Operation of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. –Rates are covered under DLP for the 1st year maintenance and hence no rate shall be provided to the contractor for maintenance of 1st year.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 2nd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 3rd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 4th year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 5th year after completion of trial run period and commissioning of project.
(5) 1 MLD STP NEAR NHPC CHOWK, FARIDABAD
Survey, Investigation, Design (including vetting from IIT/NIT), Manufacture, Supply, Erection, Construction, Trial Run for three months and Commissioning of all civil, electrical, mechanical and SCADA works for 1.5 MLD capacity Sequential Batch Reactor Type Sewage Treatment Plant and Tertiary Treatment including Multi Grade Filter and Activated Carbon Filter, etc. complete with clear water reservoir and pumping station complete on turn-key basis as per detailed scope of work.
Providing, laying and jointing 150 mm diameter Dl pipe line class K-9 with inside cement mortar lining complete with all required appurtenances valves earth work in excavation in all sorts of soil complete job including survey investigation design etc.
Provision of minimum 2.1 m high boundary wall with Gate and 1m high barbed wire fencing above DPC of boundary wall complete with RCC columns with footings, beams, etc.
Operation of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. –Rates are covered under DLP for the 1st year maintenance and hence no rate shall be provided to the contractor for maintenance of 1st year.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 2nd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 3rd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 4th year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 5th year after completion of trial run period and commissioning of project.
(6) BOQ - 1 MLD STP AT TOWN PARK, SECTOR 12, FARIDABAD
Survey, Investigation, Design (including vetting from IIT/NIT), Manufacture, Supply, Erection, Construction, Trial Run for three months and Commissioning of all civil, electrical, mechanical and SCADA works for 1.5 MLD capacity Sequential Batch Reactor Type Sewage Treatment Plant and Tertiary Treatment including Multi Grade Filter and Activated Carbon Filter, etc. complete with clear water reservoir and pumping station complete on turn-key basis as per detailed scope of work.
Providing, laying and jointing 150 mm diameter Dl pipe line class K-9 with inside cement mortar lining complete with all required appurtenances valves earth work in excavation in all sorts of soil complete job including survey investigation design etc.
Provision of minimum 2.1 m high boundary wall with Gate and 1m high barbed wire fencing above DPC of boundary wall complete with RCC columns with footings, beams, etc.
Operation of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. –Rates are covered under DLP for the 1st year maintenance and hence no rate shall be provided to the contractor for maintenance of 1st year.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 2nd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 3rd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 4th year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 5th year after completion of trial run period and commissioning of project.
(7) BOQ - 1 MLD STP NEAR SECTOR 9 DISPOSAL STATION, FARIDABAD
Survey, Investigation, Design (including vetting from IIT/NIT), Manufacture, Supply, Erection, Construction, Trial Run for three months and Commissioning of all civil, electrical, mechanical and SCADA works for 1.5 MLD capacity Sequential Batch Reactor Type Sewage Treatment Plant and Tertiary Treatment including Multi Grade Filter and Activated Carbon Filter, etc. complete with clear water reservoir and pumping station complete on turn-key basis as per detailed scope of work.
Providing, laying and jointing 150 mm diameter Dl pipe line class K-9 with inside cement mortar lining complete with all required appurtenances valves earth work in excavation in all sorts of soil complete job including survey investigation design etc.
Provision of minimum 2.1 m high boundary wall with Gate and 1m high barbed wire fencing above DPC of boundary wall complete with RCC columns with footings, beams, etc.
Operation of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. –Rates are covered under DLP for the 1st year maintenance and hence no rate shall be provided to the contractor for maintenance of 1st year.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 2nd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 3rd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 4th year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 5th year after completion of trial run period and commissioning of project.
(8) BOQ - 1 MLD STP AT VILLAGE SIHI, SECTOR 8, FARIDABAD
Survey, Investigation, Design (including vetting from IIT/NIT), Manufacture, Supply, Erection, Construction, Trial Run for three months and Commissioning of all civil, electrical, mechanical and SCADA works for 1.5 MLD capacity Sequential Batch Reactor Type Sewage Treatment Plant and Tertiary Treatment including Multi Grade Filter and Activated Carbon Filter, etc. complete with clear water reservoir and pumping station complete on turn-key basis as per detailed scope of work.
Providing, laying and jointing 150 mm diameter Dl pipe line class K-9 with inside cement mortar lining complete with all required appurtenances valves earth work in excavation in all sorts of soil complete job including survey investigation design etc.
Provision of minimum 2.1 m high boundary wall with Gate and 1m high barbed wire fencing above DPC of boundary wall complete with RCC columns with footings, beams, etc.
Operation of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. –Rates are covered under DLP for the 1st year maintenance and hence no rate shall be provided to the contractor for maintenance of 1st year.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 2nd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 3rd year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 4th year after completion of trial run period and commissioning of project.
Operation and Maintenance of complete project including Sewage Treatment Plant, Tertiary treatment Plant and treated water supply system complete with all civil mechanical electrical and SCADA related works as per Bid document and all project related buildings complete with all required consumables, chemicals, tools and plants but excluding the power charges. The operation and maintenance has strictly to be done as per O&M specifications and related manuals. The payment of O&M charges will be made on monthly basis @ charges quoted for the year divided by 12. - During 5th year after completion of trial run period and commissioning of project.
ENVIRO INFRA ENGINEERS PVT. LTD.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid