| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-Finance AKHADAPURA MOTH DISTT JHANSI | JHANSI | JHANSI | UTTAR PRADESH | ₹4.3 L | L1 | Accepted-Finance Low Rate |
| 2 | L2₹4.3 LRejected-Finance | ₹4.3 L | L2 | Rejected-Finance High Rate |
Tender Value
Refer Docs
EMD Value
₹9,000
Closing Date
9 Apr 2026, 1:30 pmClosed
Executive Engineer
UPSCIDCO Jhansi
Vill. Laron Block Bangra Tehsil Mauranipur Janpad Jhansi ke Composite School Bakhtiya me Divyang Toilet ka nirman karya. Under scheme B.V.N. 2025-26 Hon ble Shri Babulal Tiwari Ji, MLC Jhansi
2026_SCIDC_1132455_1
119/EE/Jhansi/ET/2025-26
Open Tender
Civil Works - Others
Percentage
90 days
composite school Bakhatiya Laron Jhansi
Please refer the tender documents
2 documents required · 2 mandatory
₹826
Yes
UPSCIDCO
₹9,000
Yes
2 May 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
2 Apr 2026 - 9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Toilet Block | |||||
| 1.01 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 50 mt.& including filling, watering and ramming of excavated earth . dsr 2.6.1 | 1 | CUM | 0.8 | ₹0.8 |
| 1.02 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.. 2.25(A) | 1 | CUM | 0.2 | ₹0.2 |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. Dsr.2.27 | - | CUM | 0.8 | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural
sources : 8 graded stone aggregate 40 mm nominal size.dsr 4.1.8 | - | CUM | 0.6 | - |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form work for :R.C.C. work in lintel band at G.F.dsr 5.9.5 | - | SQM | 0.8 | - |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form work for : R.C.C.work in slab at G.F.dsr 5.9.3 | 1 | SQM | - | - |
| 1.07 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). sunshade SLAB PLINTH BEND | - | CUM | 0.4 | - |
| 1.08 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). sunshade SLAB LINTEL BEND | 1 | CUM | 0.4 | ₹0.4 |
| 1.09 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). sunshade SLA R.C.C.work in slab at G. | 1 | CUM | 0.4 | ₹0.4 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.21 MB
laronnit.pdf
Tender Documents • 6.19 MB
BOQ_2113592.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].