Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
29 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Exeutive Engineer REW Kupwara
Exeutive Engineer REW Kupwara
Construction of Culvert on link road Shiekh Mohalla Farkin Ward No. 05
2022_RDPR_185250_4
NIT No115 CDPYT2022-23
Open Tender
Civil Works
Item Rate
Exeutive Engineer REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Exeutive Engineer REW Kupwara
₹6,000
29 Aug 2022
24 Aug 2022
29 Aug 2022
24 Aug 2022
29 Aug 2022
24 Aug 2022
24 Aug 2022 - 24 Aug 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Providing and layig of Stone Soling /RBM including all Carriages
P/l of cement concrete 1:3:6excluding the cost of shuttering etc using 40mm nominal size
Centering band Shuttering etc and removal of formwork for walls, suspended floors etc
Reinforced cement concrete work in walls (any thickness) including attached pilasters, suspended floors ,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:2;4 mix using 20mm aggregates
Reinforcement for RCC works including cuttin g, bending etc TMT bars
Carriage of Sand /Aggregates ( 20KM )
CIB & Photos
FAREED AH BOKDIA GOJAR
PARVEEZ AHMAD QURESHI
SHEIKH TARIQ
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .