Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹16.7 L+₹1.4 L (9.16%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹16.8 L+₹1.4 L (9.36%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹16.9 L+₹1.6 L (10.1%)Rejected-Finance NO 1 4 56 Y SRI BHARATHI NAGAR OPP PARVATHI THEATER CUMBUM ROAD THENKARAI PERIYAKULAM THENI DT 625 601 | PERIYAKULAM | THENI | TAMIL NADU | 625601 | L4 | Rejected-Finance L4 | |
| 5 | L5₹19.3 L+₹4.0 L (26.0%)Rejected-Finance 3 358 A BAGAWATH SINGH ROAD PARAMAKUDI RAMANATHAPURAM 623707 | PARAMAKUDI | RAMANATHAPURAM | TAMIL NADU | 623707 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | T.SANKARESWARAN CONTRACTOR L6 | A KALIPPAN L3 | ALAGAPPA CONSTRUCTIONS L2 | guadalupe associates L5 | Priyadharshini Construction L4 | HRITHIC CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Jungle clearnce Removal of weeds,vegetation in the yard area and seiving the existing blue metal | 500 | m2 | 3 ₹1,500 | 6 ₹3,000 | 1 ₹500 Lowest | 7 ₹3,500 | 5 ₹2,500 | 1 ₹500 Lowest |
| 2.00 | Earthwork excavation in hard stiff clay stiff black cotton hard red earth shales murram gravel stoney earth earth mixed with small size boulders and hard gravelly soil with initial lead of 10m and lift of 2m. | 222 | m³ | 240 ₹53,280 | 200 ₹44,400 | 100 ₹22,200 Lowest | 235 ₹52,170 | 103 ₹22,866 | 200 ₹44,400 |
| 3.00 | Supplying and filling of M.sand in SS area for fire prvention materials as per standard specification including cost of all materials lead lift etc complete. | 50 | m³ | 1,800 ₹90,000 | 1,000 ₹50,000 Lowest | 2,000 ₹1,00,000 | 1,855 ₹92,750 | 2,003 ₹1,00,150 | 1,700 ₹85,000 |
| 4.00 | PCC 1:3:6 mix using 20mm HBG machine crushed metal for LAS plinth concrete with fom work top neatly finishing including cost of all labour materials lead lift curing etc complete. | 14 | m³ | 6,210 ₹86,940 | 6,000 ₹84,000 | 3,000 ₹42,000 Lowest | 6,070 ₹84,980 | 5,000 ₹70,000 | 5,000 ₹70,000 |
| 5.00 | RCC 1:1.5:3 using 20 mm metal for RAFT foundation without form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete,but excluding cost of steel reinforcement. | 22 | m³ | 9,000 ₹1,98,000 | 6,500 ₹1,43,000 | 6,000 ₹1,32,000 Lowest | 8,900 ₹1,95,800 | 6,440 ₹1,41,680 | 6,000 ₹1,32,000 Lowest |
| 6.00 | PCC 1:2:4 using 20 mm metal for foundation without form work ncluding cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 33 | m³ | 6,600 ₹2,17,800 | 7,000 ₹2,31,000 | 5,000 ₹1,65,000 Lowest | 6,555 ₹2,16,315 | 5,450 ₹1,79,850 | 5,000 ₹1,65,000 Lowest |
| 7.00 | PCC 1:2:4 using 20 mm metal for foundation with form work ncluding cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 17 | m³ | 8,001 ₹1,36,017 | 7,000 ₹1,19,000 | 5,000 ₹85,000 Lowest | 7,435 ₹1,26,395 | 7,970 ₹1,35,490 | 5,000 ₹85,000 Lowest |
| 8.00 | Brick work in CM 1:5 using II Class chamber bricks including cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 30 | m³ | 7,350 ₹2,20,500 | 8,000 ₹2,40,000 | 9,000 ₹2,70,000 | 7,590 ₹2,27,700 | 6,980 ₹2,09,400 Lowest | 7,300 ₹2,19,000 |
| 9.00 | Plastering CM 1:3 12mm thick including cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 345 | m³ | 330 ₹1,13,850 | 150 ₹51,750 Lowest | 300 ₹1,03,500 | 320 ₹1,10,400 | 320 ₹1,10,400 | 200 ₹69,000 |
| 10.00 | MS / RTS Reinforcement for RCC works including cost of binding wire including cost of all materials, labour charges, lead, lift, etc complete | 2,000 | m³ | 96 ₹1,92,000 | 70 ₹1,40,000 Lowest | 80 ₹1,60,000 | 85 ₹1,70,000 | 77 ₹1,54,000 | 75 ₹1,50,000 |
Tender Value
Refer Docs
EMD Value
₹18,500
Closing Date
21 Oct 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC/MDU
SE/GCC/MDU
Civil work Enhancement of existing 110 22 KV power transformer capacity at Cumbum 110 22 KV SS
2026_EB_712443_1
SE/GCC/MDU 023/2026-27
Open Tender
Civil Works - Others
Works
180 days
Cumbum
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,500
5 Nov 2026
9 Oct 2026
22 Oct 2026
9 Oct 2026
21 Oct 2026
9 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearnce Removal of weeds,vegetation in the yard area and seiving the existing blue metal | 500 | m2 | - | - |
| 2 | Earthwork excavation in hard stiff clay stiff black cotton hard red earth shales murram gravel stoney earth earth mixed with small size boulders and hard gravelly soil with initial lead of 10m and lift of 2m. | 222 | m³ | - | - |
| 3 | Supplying and filling of M.sand in SS area for fire prvention materials as per standard specification including cost of all materials lead lift etc complete. | 50 | m³ | - | - |
| 4 | PCC 1:3:6 mix using 20mm HBG machine crushed metal for LAS plinth concrete with fom work top neatly finishing including cost of all labour materials lead lift curing etc complete. | 14 | m³ | - | - |
| 5 | RCC 1:1.5:3 using 20 mm metal for RAFT foundation without form work including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete,but excluding cost of steel reinforcement. | 22 | m³ | - | - |
| 6 | PCC 1:2:4 using 20 mm metal for foundation without form work ncluding cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 33 | m³ | - | - |
| 7 | PCC 1:2:4 using 20 mm metal for foundation with form work ncluding cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 17 | m³ | - | - |
| 8 | Brick work in CM 1:5 using II Class chamber bricks including cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 30 | m³ | - | - |
| 9 | Plastering CM 1:3 12mm thick including cost of all materials,curing, all labour charges, lead, lift, etc. complete. | 345 | m³ | - | - |
| 10 | MS / RTS Reinforcement for RCC works including cost of binding wire including cost of all materials, labour charges, lead, lift, etc complete | 2,000 | m³ | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_855839.xls
BOQ • 0.32 MB
corrigendum023cumbum.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .