| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -0.89% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹8,620.97 (2.97%)Admitted-Finance NAZRUL SARANI ASHRAMPARA SILIGURI | SILIGURI | COOCH BEHAR | WEST BENGAL | +2.05% | ₹3.0 L+₹8,620.97 (2.97%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹12,872.80 (4.43%)Admitted-Finance | +3.50% | ₹3.0 L+₹12,872.80 (4.43%) | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
22 Aug 2026, 12:00 pmClosed
E.E (C)/BR-XVI
4, DIAMOND PARK , KOLKATA-700104
DEVELOPMENT OF FOOTPATH ALONG BOTH SIDE OF JAMES LONG SARANI WITH PAVER BLOCK NEAR MUKUNDA DAS PALLY, GOURNAGAR ROAD ETC. IN WARD NO- 124.
2026_KMC_1037732_1
KMC/E.E(C)/BR-XVI/ 124/009/26-27
Open Tender
CIVIL WORKS
Percentage
30 days
WARD-124
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹6,000
11 Sept 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
22 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 1 | MTR | 8.17 | ₹8.16 |
| 2 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | - | MTR | 8.17 | - |
| 3 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | 1 | MTR | 18.3 | ₹18.28 |
| 4 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | - | MTR | 21.43 | - |
| 5 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 300mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder / footpath) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | - | EA | 265.54 | - |
| 6 | Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) ( Ref :Rate based on PWD Current SOR [PWD(B) 2017, p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, PWD-2018(R & B) p-332 (it -18.05)), Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, ) | 0 | EA | 214.63 | ₹0 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion | 1 | M3 | 4,572 | ₹4,572 |
| 8 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16 Page No.240) | - | SQM | 14.4 | - |
| 9 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 0.28 | %M3 | 93,621 | ₹26,213.88 |
| 10 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | - | SQM | 24 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
TENDER_FORM.pdf
Tender Documents • 0.58 MB
BOQ_2549240.xls
BOQ • 0.30 MB
BOQ.xls
Additional Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .