Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.5 LAccepted-AOC SWAGAT CO OP HSG SOCIETY LTD 22 303 CHATRAPATI SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKTA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹74.5 L Quoted ₹77.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹94.9 LRejected-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON W MUMBAI 400 104 | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹94.9 L | L2 | Rejected-AOC NOT L1 |
| 3 | L3₹96.8 LRejected-AOC MATHOSHREE PLOT NO 55 SR NO 787 A BEHIND ASHWANI HOSPITAL GOVIND NAGAR NASIK 422 009 | NASIK | NASHIK | MAHARASHTRA | 422009 | ₹96.8 L | L3 | Rejected-AOC NOT L1 |
| 4 | L4₹99.0 LRejected-AOC | ₹99.0 L | L4 | Rejected-AOC NOT L1 |
| 5 | L5₹99.1 LRejected-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | ₹99.1 L | L5 | Rejected-AOC NOT L1 |
| Sl No | Description | Qty | Unit | sapana enterprises L7 | Veer High Tech Solution L8 | BRITE INDUSTRIES L4 | Shree Ayyappa Engineering L2 | OM SAI POWER SYSTEMS L10 | pk Enterprises L9 | cooltech engineering services L1 | Chakshu Enterprise L6 | shakti engineering and electrical works L5 | DURGAI ELECTRICALS L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of existing unserviceable FRP Cold Water Basin and supply and fixing FRP Cold Water Basin at the bottom of the cooling tower for collects the cooled water and directs it to the pump suction line of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 1,45,030 ₹5.8 L | 1,45,010 ₹5.8 L | 1,40,008 ₹5.6 L | 1,15,405 ₹4.6 L | 1,05,090 ₹4.2 L | 1,44,000 ₹5.8 L | 1,15,415 ₹4.6 L | 1,25,020 ₹5.0 L | 1,45,200 ₹5.8 L | 74,000 ₹3.0 L |
| 2.00 | Dismantling of existing unserviceable FRP frame/casing and supply and fixing FRP frame/casing of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 1,00,030 ₹4.0 L | 1,00,010 ₹4.0 L | 69,000 ₹2.8 L | 79,000 ₹3.2 L | 1,00,050 ₹4.0 L | 1,00,000 ₹4 L | 79,010 ₹3.2 L | 1,00,000 ₹4 L | 1,00,050 ₹4.0 L | 35,000 ₹1.4 L |
| 3.00 | Dismantling of existing unserviceable Fill Media (fins) and supply and fixing Fill Media (fins) in cooling tower complete as per existing which increases the surface area for air and water interaction to enhance heat transfer and evaporation of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 1,09,530 ₹4.4 L | 1,09,520 ₹4.4 L | 89,000 ₹3.6 L | 95,000 ₹3.8 L | 1,00,540 ₹4.0 L | 1,08,500 ₹4.3 L | 94,000 ₹3.8 L | 1,05,520 ₹4.2 L | 1,09,550 ₹4.4 L | 30,000 ₹1.2 L |
| 4.00 | Dismantling of existing unserviceable Water Distribution System and supply and fixing Water Distribution System (Includes pipes, distribution basins, and nozzles) complete as per existing to uniformly distribute hot water over the fill of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 35,503 ₹1.4 L | 35,520 ₹1.4 L | 34,000 ₹1.4 L | 22,000 ₹88,000 | 30,060 ₹1.2 L | 35,500 ₹1.4 L | 21,000 ₹84,000 | 30,520 ₹1.2 L | 35,580 ₹1.4 L | 34,000 ₹1.4 L |
| 5.00 | Dismantling of existing unserviceable Drift Eliminators and supply and fixing Drift Eliminators complete as per existing for minimize the amount of water droplets lost to the atmosphere with the exhaust air of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 29,000 ₹1.2 L | 35,520 ₹1.4 L | 39,000 ₹1.6 L | 22,000 ₹88,000 | 22,000 ₹88,000 | 35,500 ₹1.4 L | 2,100 ₹8,400 | 30,520 ₹1.2 L | 35,509 ₹1.4 L | 30,000 ₹1.2 L |
| 6.00 | Dismantling of existing unserviceable Fan Assembly with motor capacity 7.5 HP/5.5 KW and supply and fixing Fan Assembly with motor capacity 7.5 HP/5.5 KW complete as per existing for the cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 98,000 ₹3.9 L | 98,000 ₹3.9 L | 98,000 ₹3.9 L | 82,000 ₹3.3 L | 1,03,550 ₹4.1 L | 1,03,500 ₹4.1 L | 81,000 ₹3.2 L | 1,01,520 ₹4.1 L | 1,03,509 ₹4.1 L | 47,000 ₹1.9 L |
| 7.00 | Dismantling of existing unserviceable Gearbox / Speed Reducer and supply and fixing Gearbox / Speed Reducer of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 5,200 ₹20,800 | 1,200 ₹4,800 | 5,200 ₹20,800 | 3,400 ₹13,600 | 4,950 ₹19,800 | 4,900 ₹19,600 | 3,200 ₹12,800 | 4,990 ₹19,960 | 5,400 ₹21,600 | 4,000 ₹16,000 |
| 8.00 | Dismantling of existing unserviceable Air Inlet Louvers and supply and fixing Air Inlet Louvers to prevent water splash-out and block sunlight from entering the basin (which inhibits algae growth) of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 13,150 ₹52,600 | 8,500 ₹34,000 | 9,000 ₹36,000 | 8,000 ₹32,000 | 12,160 ₹48,640 | 12,150 ₹48,600 | 7,000 ₹28,000 | 15,000 ₹60,000 | 5,000 ₹20,000 | 12,000 ₹48,000 |
| 9.00 | Dismantling of existing unserviceable Float Valve assembly and supply and fixing Float Valve assembly of suitable size for automatically regulates the make-up water level in the basin of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 3,200 ₹12,800 | 6,000 ₹24,000 | 3,000 ₹12,000 | 5,200 ₹20,800 | 7,240 ₹28,960 | 2,000 ₹8,000 | 4,000 ₹16,000 | 8,000 ₹32,000 | 5,000 ₹20,000 | 6,000 ₹24,000 |
| 10.00 | Dismantling of existing unserviceable Access Ladder and supply and fixing Access Ladder for maintenance and inspection of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge. | 4 | Each Job | 3,120 ₹12,480 | 5,110 ₹20,440 | 9,000 ₹36,000 | 4,100 ₹16,400 | 5,160 ₹20,640 | 2,000 ₹8,000 | 4,000 ₹16,000 | 3,200 ₹12,800 | 2,100 ₹8,400 | 4,000 ₹16,000 |
Tender Value
₹97 L
EMD Value
₹1.7 L
Closing Date
8 Jan 2026, 6:00 pmClosed
COL SAIKAT DE CWE NAVY VASCO
CWE NAVY VASCO VASCO DA GAMA GOA 403802
REPAIR/MAINT/SERVICING OF COOLING TOWER INCLUDING CHIMNEY OF CAPTIVE POWER PLANT AT NSRY AND DG SETS AT SITE A UNDER GE (SB) KARWAR
2025_MES_744044_1
86036
Open Tender
Civil Works
KARWAR
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
GE(SB) KARWAR
₹1.7 L
Yes
24 Feb 2026
11 Dec 2025
10 Jan 2026
11 Dec 2025
8 Jan 2026
1 Jan 2026
Dismantling of existing unserviceable Float Valve assembly and supply and fixing Float Valve assembly of suitable size for automatically regulates the make-up water level in the basin of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge.
Dismantling of existing unserviceable Access Ladder and supply and fixing Access Ladder for maintenance and inspection of cooling tower of capacity 19 KL type MTG-B-5, Make M/s Himagiri cooling Tower (P) Ltd,Manufacurer's ser No F4405287at Captive power Plant at NSRY all as directed by the Engr In Charge.
Dismantling of existing LT water duplex filter and supply and fixing LT water duplex filter of water circulating system, complete as per existing for 2.5 MW HT 11 KV DG set at Captive power Plant at NSRY all as directed by the Engr In Charge.
Dismantling of existing raw water pump with motor and supply and fixing raw water pump with motor of water softening system, RPM 2870, type KDS 550++, complete as per existing for 2.5 MW HT 11 KV DG set at Captive power Plant at NSRY all as directed by the Engr In Charge.
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
Material and labour for replacement of battery lead set of 2 Nos 1.5 mtr long copper lead of 35 Sqmm size including GM terminals at one end and copper lug at other end all as directed
(a) 250 KVA DG set
(b) 400 KVA DG set
(c) 500 KVA DG set
(d) 750 KVA DG set
Supply and toping up of engine oil 15W40, as per manufacturers recommendations for topping up or replacement.
Supply and toping up of radiator coolants as per the recommendation of engine manufacturer all as directed.
Material and labour for carrying out 'B' check for DG set 750 KVA, as per manufacturer's recommendation including replacement of fuel filters, air filters and oil filters, 'O' rings, engine oil, gasket, coolant etc complete. Make of Engine: Greaves Cotton/Kirloskar/Sterling
Disconnecting and removing existing unserviceable battery and Supply and fix maintenance free battery 12V 180 AH with minimum 2 years warranty all as specified and as directed by Engineer-in-Charge.
Checking complete wiring for AMF panel and identifying fault in the safety and control system wiring from AMF panel to engine control gadgets like HWT. LLOP, and shut down valve, dynamo self-starter etc for 500/750 KVA DG set engine and rectifying fault in the AMF system including replacement of EC-2 Relay, suitable capacity of contactor, burnt control wiring cable with thimbles and ferrules, blown out fuses for proper functioning and testing the DG set all as directed
Supply and fix in repair AVR with functions to adjust generator output voltage, prevent voltage hunting, set under frequency roll off knee point, set generator droop to 5% at full load, match AVR input to accessory output, set the over excitation cut off level, set initial frequency related voltage dip, over-voltage protection cut off level, maximum short circuit current with sensing input voltage range 170 - 250 V AC max, 50 -60 HZ frequency with output max up to 120 V DC, continuous current 2.7A and transient 6A for 10 sec including necessary control wiring complete from alternator to AVR complete testing and commissioning for DG sets of capacity 250/400 KVA
Supply and fix in repair AVR with functions to adjust generator output voltage, prevent voltage hunting, set under frequency roll off knee point, set generator droop to 5% at full load, match AVR input to accessory output, set the over excitation cut off level, set initial frequency related voltage dip, over-voltage protection cut off level, maximum short circuit current with sensing input voltage range 170 - 250 V AC max, 50 -60 HZ frequency with output max up to 120 V DC, continuous current 2.7A and transient 6A for 10 sec including necessary control wiring complete from alternator to AVR complete testing and commissioning for DG sets of capacity 500/750 KVA
Material and labour for Plates (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes, without any attachment Fe 410 -W (Gde- E- 250) quality-A, including fabrication complete all as specified and directed including lifting and shifting of MS plate section to a height up to 30m with necessary safety precautions.
Supply and fix in repair microprocessor based integrated power command controller for DG set monitoring and metering protection and control system with built in torque matched volts/Hz over load control preferably the gen set function including (i) Digital governing (ii) Digital voltage control (iii) Digital engine control (iv) operator interface (v) protection parameters i.e. RPM, Battery Voltage, lube oil pressure failure, coolant temperature, running hour, high water temperature, high/low dc voltage, weak batery, over speed fail to crank , fail to start sense (vi) advance control function (vii) alternate protection should be under voltage , over voltage, over current, under/over frequency, loss of sensing including necessary control wiring complete , testing and commissioning for DG sets of capacity 500/750 KVA
Supply and fix Joist, channel, angle, or tee sections in vertical posts, fixed independently, with / without connecting plates, and column bracings etc. conf to Fe-410-w or E-250 quality A including fabrication complete all as specified and directed including lifting and shifting of MS channel,plate,angle sections to a height up to 30m with necessary safety precautions.
Supply and Laying in repair GI tubing light grade with necessary fittings as in cable protection in trenches/fixed on wall / floor including necessary clamps bolts and nuts complete all as specified and as directed of sizes 40mm dia
Supply and Laying in repair GI tubing heavy grade with necessary fittings in trenches/fixed on wall / floor including necessary clamps bolts and nuts complete all as specified and as directed of sizes 50 mm dia
Supply and fix in repair butterfly valves of sizes 80mm dia complete all as specified
Supply and fix in repair gate valves of sizes 50 mm dia complete all as specified
Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m depth for laying/taking out cable and getting out in soft/loose soil all as specified and as directed.
Returning, filling in including spreading, leveling, watering and well ramming in layer not exceeding 25 cm in soft/loose soil all as specified and as directed.
Supply and Laying in repair MS pipe heavy grade with necessary fittings cooling tower in trenches/fixed on wall / floor including necessary clamps bolts and nuts complete all as specified and as directed of sizes 80mm dia
Supply and lay un-reinforced pre-cast concrete cable cover, class HV, type 1, flat, size 300mm x 180mm x 40mm complete all as specified and as directed.
Supply, jointing and testing straight through type cable joininting kit heat shrinkable 11 KV HT joint kit suitable for 3 core 120 Sqmm to 185 Sqmm PVC / XLPE insulated stranded aluminium conductor all as specified and as directed.
Taking down of old unserviceable LT UG cable of size 3.5 core 240 sqmm and Supply and Laying LT UG cable 1100 Volts grade XLPE insulated PVC sheathed amoured, heavy duty, in trenches/walls/poles/passing through pipes with multistranded aluminium conductor including lugs/thimble/ferules connection, testing and commissioning complete of size 3.5 core 240 sqmm. Note: [i] Earth work, excavation, GI tubing/DWC pipe for protection etc shall be measured separately under relevant items of this schedule work
Supply and fix DWC high density polyethylene pipes having 100/95 mm dia with all fittings/coupler/connecting accessories confirming to IS : 16098 Part-02 for cable protection fixed on poles/walls/laid under roads crossing etc and made good the disturbed surfaces/area complete all as specified and directed
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
86036.pdf
Tender Documents • 0.76 MB
BOQ_833128.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid