| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical As per TCR | |
| 3 | Rejected-Technical DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical As per TCR |
Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
19 Nov 2024, 5:00 pmClosed
Area Engineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Complete repairing and commissioning of boiler WBL 10149 and 9658 of South Samla Colliery.
2024_ECL_320819_1
GM-PND/EandM/24-25/119/696 dated 07/11/2024
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
MSAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,800
19 Dec 2024
9 Nov 2024
20 Nov 2024
9 Nov 2024
19 Nov 2024
9 Nov 2024
9 Nov 2024 - 12 Nov 2024
Amount
Complete repairing and commissioning of boiler WBL 10149 and 9658 of South Samla Colliery. (Inclusive of CMPF and Contractor Profit)
CLEANING OF ASH FROM THE BOTTOM OF THE BOILERS
CLEANING OF SCALE & RUST FROM THE BOILERS SHELL PLATE AT FIRE SIDE & WASHING OF THE SAME.
CLEANING OF SCALE FROM THE BOILERS SHELL PLATE, SCRAPPING, REMOVING OF ALL THE FOREIGN MATERIALS,WASHING OF THE SAME AT WATER SIDE
DISMANTALING OF ALL THE VALVES,FIRE BAR & ALL THE INSPECTION DOOR,CLEANING & DEPOSIT THE SAME AT COLLIERY WORKSHOP
CONDUCTING THE DRY INSPECTION OF THE BOILERS BY THE DY.DIRECTOR OF BOILER'S DURGAPUR
TO BUILD UP THE PITED PORTION OF BOILERS SHELL CROWN BY ARC WELDING & GRIND SMOOTH AS MARK OUT DURING INSPECTION.INCLUDING MATERIAL COST
TO BUILD UP THE UPTAKE TUBE OF THE BOILERS BY ELECTYRIC ARC WELDING & DRESSING TO BE DONE BY GRINDING TO REGINE ITS ORIGINAL CONTOUR.INCLUDING MATERIAL COST
CHANGING THE DEFECTIVE BURN OUT FUSE PLUG THREAD MAKING OF BORE HOLE OF SHELL CROWN PLATE ETC.INCLUDING MATERIAL COST
OVERHAULING LAPPING & NECESSARY REPAIR OF ALL THE VALVES WITH SUPPLY & FITTING OF 2 SET BUSH FOR GAUGE COLUMN COCK.INCLUDING MATERIAL COST
(A)TO BUILD UP THE MUDHOLE CROSS TUBE DOOR & GRIND SMOOTH TO MAKE SPIE GOT CLEARANCE (B) CHANGING OF ALL THE STUD OF MUDHOLE DOOR BY GAS CUTTING & FITTING NEW H.T. STUD BY ARC WELDING (C) COST OF NEW H.T. STUD (3/4" X 6") LONG WITH WASHER.INCLUDING MATERIAL COST.
SUPPLY & FITTING OF 3/4" GAUGE GLASS TUBE 18" LONG
HYDRAULIC TEST OF V/BOILER WITH BLANKING & WATER FILLING & CONDUCTING THE INSPECTION.INCLUDING MATERIAL COST
COMPLETE FITTING OF V/BOILER WITH ALL FITTINGS.INCLUDING MATERIAL COST
FABRICATION OF FIRE BAR WITH DA/OXYGEN
SUPPLY OF NUT BOTLS TAP JOINT STEAM JOINT ETC.
COMMISSIONING OF BOILER WITH ALL PREPARATION FOR FIRING OF THE BOILER & 48 HRS. OBSERVATION
Total impact of GST for the purpose of CTC
GT ENTERPRISE (BID ID -1100633)
SABIR CONSTRUCTION (BID ID -1100639)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .