| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 LAccepted-AOC 4 A 39 2 MACHADO NAGAR OPP APC COLLEGE TUTICORIN 2 | TUTICORIN | TAMIL NADU | 626202 | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹35.8 L+₹4.6 L (14.8%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹35.7 L
EMD Value
₹35,600
Closing Date
21 Sept 2022, 2:00 pmClosed
CE/TTPS/SE/ES
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
TTPS ES Circle EM I Complete preventive maintenance of LT breakers, HT breakers, HT panels, LT panels, LT modules in 6.6kV Switchgear control room, Generators with their auxiliaries, Generator Transformers, UATs, STs USTs SSTs 230kV indoor
2022_EB_249952_1
CE/TTPS/SE/ES/NO. 114/2022-23
Open Tender
Electrical Works
Fixed-rate
180 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹35,600
Yes
1 Apr 2023
5 Sept 2022
22 Sept 2022
5 Sept 2022
21 Sept 2022
5 Sept 2022
Complete cleaning and assisting the periodical preventive maintenance testing like daily, weekly, monthly, quarterly, yearly etc for LT breakers panels & LT Modules panels in USS I,SSSI,N/E I, USS II,SSS II, N/E II, USS III,SSS III,N/E III,DG set of unit I, II & IIIand all other electrical equipments available at LT bus of Unit I, II & III and recording of results as per ISO Procedures
Charges for cleaning the floor at 6.6 kv control room floors in Unit I,II & III for total area of 1500 Sq.m
Complete cleaning and assisting the periodical preventive maintenance testing like daily, weekly, monthly, quarterly, yearly etc for HT breakers in 6.6 kV HT Switch Gear1A, 1B, 2A, 2B, 3A, 3B,C1 & C2 and all other electrical equipments available in entire HT Switch Gear Area and recording of results as per ISO Procedures.
Assisting for daily cleaning and checking of all equipments in the 230 KV indoor switchyard, switchyard floor area, charger room area, Battery room etc., assisting in works like, Daily checking of SF6 gas level, Air pressure, Draining of Condensed water from the breaker, checking the temperature, checking the leakage currents in all Las, checking the battery, specific gravity charger voltage, watering all earth pits, store drawl and devolution, etc., Assisting in checking the tightness of clamps. Checking the healthiness of insulation, SF6 gas filling, Compressor oil changing, Lubricating the isolators, tightness checking of all cable termination, petroleum, jelly applying and in breaker overhauling etc., of Indoor switch yard -I
Assisting for daily cleaning and checking of all Power Transformer yard, Transformer yard, checking transformer temperature, checking and NGR , NGT, Silica gel replacing, attending oil leakage in transformers, replacing the cooling fans, replacing the oil circulating pumps. Assisting in overhauling the fan and pumps. Oil filtrations, Assisting in oil top up, Bucholtz and PRV checking and replacing, releasing and reconnecting of HV – LV neutral and earth connection including Duct opening and closing, Store drawl and devolution etc., of Indoor switch yard -I
Opening of all earth pit in Transformer Yard, Switchyard-I Indoor/Outdoor, cleaning the earth electrode & pit , checking the joints and earthing rod if necessary , Closing the cover after completion of work
Cleaning of the floor at Unit-I,II&III Battery room and Charger Room area for total area of 1500 Sq.m
Assisting for daily cleaning and checking of all Power Transformers, Transformer yard, checking transformer temperature, checking and NGR , NGT, Silica gel replacing, attending oil leakage in transformers, replacing the cooling fans, replacing the oil circulating pumps. Assisting in overhauling the fan and pumps. Oil filtrations, Assisting in oil top up, Bucholtz and PRV checking and replacing, releasing and reconnecting of HV–LV neutral and earth connection including Duct opening and closing, Store drawl and devolution etc of TG I.
Assisting for daily cleaning and checking of all Power Transformers, Transformer yard, checking transformer temperature, checking and NGR , NGT, Silica gel replacing, attending oil leakage in transformers, replacing the cooling fans, replacing the oil circulating pumps. Assisting in overhauling the fan and pumps. Oil filtrations, Assisting in oil top up, Bucholtz and PRV checking and replacing, releasing and reconnecting of HV–LV neutral and earth connection including Duct opening and closing, Store drawl and devolution etc of TG II.
Assisting for daily cleaning and checking of all Power Transformers, Transformer yard, checking transformer temperature, checking and NGR , NGT, Silica gel replacing, attending oil leakage in transformers, replacing the cooling fans, replacing the oil circulating pumps. Assisting in overhauling the fan and pumps. Oil filtrations, Assisting in oil top up, Bucholtz and PRV checking and replacing, releasing and reconnecting of HV–LV neutral and earth connection including Duct opening and closing, Store drawl and devolution etc of TG III.
Charges for cleaning of inside and outside of Hydrogen plant I & II for total area of 1500 Sq.m
KAVIYA FLUID ENGINEERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .