Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-Finance 0 WARD NO 9 PIPERTAR KATHAN KHAMARIA POLICE CHOWKI SANT RAVIDAS NAGAR UTTAR PRADESH 221306 | BHADOHI | UTTAR PRADESH | 221306 | 1 | Accepted-Finance DUE TO LOWEST ONE | |
| 2 | 2₹8.6 L+₹2,667.94 (0.31%)Rejected-Finance AWAS VIKAS COLONY DISTRICT ETAH | ETAH | ETAH | UTTAR PRADESH | 2 | Rejected-Finance DUE TO SECOND LOWEST | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SHRI BALAJI CONSTRUCTION L1 | M/S KASON CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all type of soil including initial lift up to 1.50 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth into the space between the structure and the sides of foundation trenches and disposal of surplus earth as directed by the Engineer-in-charge up to 30 meter distance from the foundation. | 277.75 | CUM | 79.35 ₹22,039.46 Lowest | 79.6 ₹22,108.9 |
| 2.00 | Providing and laying of Cement Concrete M-10 (CC 1:3:6) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 25.16 | CUM | 5,849.23 ₹1,47,166.63 Lowest | 5,867.5 ₹1,47,626.3 |
| 3.00 | Providing first class M-150 Brick work in 1:4 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 69.48 | CUM | 4,574.64 ₹3,17,850.56 Lowest | 4,589 ₹3,18,848.31 |
| 4.00 | Providing and laying of Cement Concrete M-20 (RCC 1:1.5:3) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 32.89 | CUM | 7,107.95 ₹2,33,780.48 Lowest | 7,130.17 ₹2,34,511.29 |
| 5.00 | Providing and laying of Cement Concrte M-25 (CC 1:1:2) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 1.84 | CUM | 7,562 ₹13,951.89 Lowest | 7,585.88 ₹13,995.95 |
| 6.00 | Providing and fixing Cantering & shuttering for C.C. Works including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . | 33.32 | SQM | 464.2 ₹15,467.14 Lowest | 465.66 ₹15,515.79 |
| 7.00 | Supply and Fixing drainage 75 mm Dia PVC. Pipe Including cost of all material T&P, labours etc complete. | 9 | RM | 247.97 ₹2,231.73 Lowest | 248.75 ₹2,238.75 |
| 8.00 | Providing 12 mm thick plaster in 1:4 cement mortar incl. cost of all labour, T&P material etc complete as per direction of Engineer - in charge. | 65.31 | SQM | 152.75 ₹9,976.1 Lowest | 153.23 ₹10,007.45 |
| 9.00 | Providing Brick on edge pitching on canal section incl. cost of all labour, T&P material etc complete as per direction of Engineer - in charge. | 4.5 | SQM | 541.57 ₹2,437.07 Lowest | 543.27 ₹2,444.72 |
| 10.00 | Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. | 468.17 | CUM | 192.42 ₹90,085.27 Lowest | 193 ₹90,356.81 |
Tender Value
₹8.6 L
EMD Value
₹17,220
Closing Date
3 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MGCCD8 BULANDSHAHR
EE MGCCD8 BULANDSHAHR
Construction of fall of Dilgaura Minor at KM 0.300
2026_UPIDC_1200823_1
03/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Sambhal
TENDER FEE EMD TECHNICAL QUALIFICATION AS PER TD
2 documents required · 2 mandatory
₹858
₹17,220
7 Nov 2026
27 Oct 2026
4 Nov 2026
27 Oct 2026
3 Nov 2026
27 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in all type of soil including initial lift up to 1.50 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth into the space between the structure and the sides of foundation trenches and disposal of surplus earth as directed by the Engineer-in-charge up to 30 meter distance from the foundation. | 277.75 | CUM | - | - |
| 2 | Providing and laying of Cement Concrete M-10 (CC 1:3:6) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 25.16 | CUM | - | - |
| 3 | Providing first class M-150 Brick work in 1:4 cement mortar including cost of all material, labour and T&P etc. complete required for proper complition of work. | 69.48 | CUM | - | - |
| 4 | Providing and laying of Cement Concrete M-20 (RCC 1:1.5:3) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 32.89 | CUM | - | - |
| 5 | Providing and laying of Cement Concrte M-25 (CC 1:1:2) including cost of all material, labour and T&P etc. complete required for proper complition of work. | 1.85 | CUM | - | - |
| 6 | Providing and fixing Cantering & shuttering for C.C. Works including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . | 33.32 | SQM | - | - |
| 7 | Supply and Fixing drainage 75 mm Dia PVC. Pipe Including cost of all material T&P, labours etc complete. | 9 | RM | - | - |
| 8 | Providing 12 mm thick plaster in 1:4 cement mortar incl. cost of all labour, T&P material etc complete as per direction of Engineer - in charge. | 65.31 | SQM | - | - |
| 9 | Providing Brick on edge pitching on canal section incl. cost of all labour, T&P material etc complete as per direction of Engineer - in charge. | 4.5 | SQM | - | - |
| 10 | Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge. | 468.17 | CUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
LOT1TD03EE2627.pdf
Tender Documents • 3.11 MB
BOQ_2272110.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .