Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Finance | ₹11.4 L | L1 | Admitted-Finance |
| 2 | L2₹12.5 L+₹1.1 L (9.50%)Admitted-Finance | ₹12.5 L+₹1.1 L (9.50%) | L2 | Admitted-Finance |
| 3 | L3₹12.5 L+₹1.1 L (9.67%)Admitted-Finance | ₹12.5 L+₹1.1 L (9.67%) | L3 | Admitted-Finance |
| 4 | L4₹12.5 L+₹1.2 L (10.2%)Admitted-Finance | ₹12.5 L+₹1.2 L (10.2%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Contractor is Debared from this Division |
| Sl No | Description | Qty | Unit | RIDHIAKSH ELECTRICAL CONTRACTORS L4 | M/S BANDAY ELECTICALS L2 | LEGACY ENTERPRISES L3 | TOHEED ALAM L1 |
|---|---|---|---|---|---|---|---|
| 1.00Creation of 25 KVA Distribution Substations at BHELLAN IN CHINTA FEEDER UNDER UT CAPEX.Sub Station in SD-Bhaderwah.( All items are SITC) | |||||||
| 2.00 | 11/0.433kV, 3-phase 25 KVA Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, as per amendment 4 of IS 1180-2014 (Aluminium wound) | 1 | No | 85,000 ₹85,000 | 1,20,000 ₹1,20,000 | 80,000 ₹80,000 Lowest | 85,000 ₹85,000 |
| 3.00 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 1 | Set | 6,500 ₹6,500 | 3,500 ₹3,500 | 2,500 ₹2,500 Lowest | 2,700 ₹2,700 |
| 4.00 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 5,000 ₹5,000 | 6,000 ₹6,000 | 8,500 ₹8,500 | 2,650 ₹2,650 Lowest |
| 5.00 | 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 5,500 ₹5,500 | 3,500 ₹3,500 | 3,500 ₹3,500 | 2,650 ₹2,650 Lowest |
| 6.00 | 9 Mtr. Long Pole( ST-410 SP33) | 2 | Nos | 15,000 ₹30,000 | 17,000 ₹34,000 | 18,000 ₹36,000 | 14,300 ₹28,600 Lowest |
| 7.00 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 3 | Nos | 255 ₹765 | 200 ₹600 Lowest | 320 ₹960 | 300 ₹900 |
| 8.00 | GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn gap | 220 | Kgs | 160 ₹35,200 | 110 ₹24,200 Lowest | 130 ₹28,600 | 120 ₹26,400 |
| 9.00 | Nuts and Bolts. | 10 | Kgs | 145 ₹1,450 | 100 ₹1,000 | 130 ₹1,300 | 85 ₹850 Lowest |
| 10.00 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 2 | Nos | 2,000 ₹4,000 | 1,300 ₹2,600 | 1,500 ₹3,000 | 1,000 ₹2,000 Lowest |
Tender Value
₹13.5 L
EMD Value
₹27,000
Closing Date
14 Sept 2026, 4:00 pmClosed
XEN ED Doda
ED DODA
Creation of 2x25 KVA Distribution Substations at BHELLAN and DHAREJA ROAD IN DHAREJA FEEDER in SD-Bhaderwah Under UT Capex
2026_PDD_323559_1
ED Doda/JPDCL/64 of 2026-27
Open Tender
Electrical Works
Turn-key
60 days
ED DODA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
XEN ED-Doda
₹27,000
Yes
18 Sept 2026
5 Sept 2026
15 Sept 2026
5 Sept 2026
14 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Creation of 25 KVA Distribution Substations at BHELLAN IN CHINTA FEEDER UNDER UT CAPEX.Sub Station in SD-Bhaderwah.( All items are SITC) | - | - | - | - |
| 2 | 11/0.433kV, 3-phase 25 KVA Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, as per amendment 4 of IS 1180-2014 (Aluminium wound) | 1 | No | - | - |
| 3 | Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 1 | Set | - | - |
| 4 | 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | - | - |
| 5 | 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | - | - |
| 6 | 9 Mtr. Long Pole( ST-410 SP33) | 2 | Nos | - | - |
| 7 | 11kV Polymeric composite Disc Insulator 12kV,min failing load 45KN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 3 | Nos | - | - |
| 8 | GI Channel/Angle/Flat of sizes including clamps for L.A set/G.O set/Horn gap | 220 | Kgs | - | - |
| 9 | Nuts and Bolts. | 10 | Kgs | - | - |
| 10 | Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover. | 2 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.91 MB
Tendernotice_3.pdf
PDF • 7.52 MB
BOQ_1089512.xls
BOQ • 0.33 MB
CORRIGENDUM.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .