Loading…
Loading…
| # | Company | Rank | Status |
|---|---|---|---|
| 1 | L1Accepted-Finance | L1 | Accepted-Finance Accepted |
| 2 | L1Accepted-Finance BARUA MARKET TRP ROAD FENCY BAZAR GUWAHATI 781001 | KAMRUP METRO | ASSAM | 781001 | L1 | Accepted-Finance Accepted |
| 3 | L1Accepted-Finance | L1 | Accepted-Finance Accepted |
| 4 | L1Accepted-Finance | L1 | Accepted-Finance Accepted |
| 5 | L1Accepted-Finance | L1 | Accepted-Finance Accepted |
Tender Value
Refer Docs
Closing Date
18 Mar 2022, 4:00 pmClosed
CE PHE Water Assam
Hengrabari, Guwahati-36
Pkg 08 Fixation of Rates for different items required for execution of Mini Piped Water Supply Schemes to be implemented under various divisions under Nagaon Circle of PHE Department under Jal Jeevan Mission Assam
2022_PHED_24494_8
PHE_19_JJM_PB_21_22_T_29006_12
Open Tender
Civil Works - Water Works
Item Rate
All Assam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
24 Jun 2022
25 Feb 2022
19 Mar 2022
25 Feb 2022
18 Mar 2022
25 Feb 2022
Amount
1. Construction of ESR of different capacities for a minimum 70 kN/sqm SBC of soil (SBC is to be determined as per a separate item) with RCC staging of 12 m height including earthwork in excavation for foundation including refilling (return filling) the quantity as necessary after completion of work; RCC works; plastering, painting; underdrainage works in filter beds; placing the filter materials in two rapid gravity sand filters; construction of aeration system; various pipes, e.g. inlet, outlet, overflow pipes, wash water pipes, vent pipe and sluice valves as required; aviation lamp; lightening arrestor; MS ladder; all formworks including cantering, shuttering, scaffolding; all materials and labour as per approved drawings and specifications all complete as directed in the jurisdiction of different divisions of PHED, Assam with the following main components: 1) Aeration System at 10 m level. 2) Gravity type Rapid Sand Filter with 1 working and 1 stand by bed at 3 m level. 3) Pump House at the Ground Floor. 4) Water tank made of food grade virgin Plastic (ISI marked) at 12 m level conforming to IS 12701: 1996 1.A.10,000 litres Water tank Capacity.
1.B. 15,000 litres Water tank Capacity
2. Construction of ESR of different capacities for a minimum 70 kN/sqm SBC of soil (SBC is to be determined as per a separate item) with MS staging of 10 m height including earthwork in excavation for foundation including refilling (return filling) the quantity as necessary after completion of work; RCC works in foundation; various pipes, e.g. inlet, outlet, overflow pipes, vent pipe and sluice valves as required; aviation lamp; lightening arrestor; MS ladder; all formworks including cantering, shuttering, scaffolding; all materials and labour as per approved drawings and specifications all complete as directed in the jurisdiction of different divisions of PHED, Assam. 2A. 5,000 Litres Water tank Capacity
2B. 10,000 litres Water tank Capacity
3. Construction of RCC under ground reservoir of various capacities by excavating necessary earthwork, including dewatering if necessary, stabilising side earth, preparation of sub soil etc. with PCC; using M30 grade of concrete with use of admixtures; water proofing compound; plastering and painting; inlet, outlet pipes, vent pipe and other pipe connections; all formworks including cantering, shuttering, scaffolding; all materials and labour as per approved drawings and specifications all complete as directed in the jurisdiction of different divisions of PHED, Assam for storage of treated drinking water as per approved drawings and specifications. 3A. 5,000 Litres
3B. 10,000 Litres
4. Supply, installation, testing and commissioning of standalone water purification plant of FRP with different capacities solar pump set fitted with tube well, capable of removing specified contaminants along with bacteriological disinfection (by chlorine dosing system) from the raw water bringing the filtered water quality as per the acceptable limits of IS: 10500:2012 including 3 (three) months trial run and 33 (thirty-three) months operation and maintenance after the trial run under PHED of Assam. The work broadly comprises of supply, installation, testing and commissioning of standalone community water purification of BLDC motor based solar pump set fitted with existing well and pressure filter having specified filtration rate. The plant will be aided by photovoltaic submersible solar pumps within the bore well with a specified minimum yield. The plant is capable to work on specified solar energy (PV panel), lithium-ion batteries which are to be installed. The lithium-ion battery shall be capable of providing a minimum of 2 hours backup. Filtration process technology shall require approval by CSIR-IMMT or NEERI with complete test report. 4A. Two stage treatment (i) Solar pump capacity: 0.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period (v) Solar panel and battery: 670 Wp (335 Wp – 2 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4B. 'Two stage treatment (i) Solar pump capacity: 1.0 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period (v) Solar panel and battery: 1005 Wp (335 Wp – 3 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4C. Two stage treatment (i) Solar pump capacity: 1.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period (v) Solar panel and battery: 1340 Wp (335 Wp – 4 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4D. 'Three stage treatment (i) Solar pump capacity: 0.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period (v) Solar panel and battery: 670 Wp (335 Wp – 2 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4E. 'Three stage treatment (i) Solar pump capacity: 1.0 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period (v) Solar panel and battery: 1005 Wp (335 Wp – 3 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4F. Three stage treatment (i) Solar pump capacity: 1.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period (v) Solar panel and battery: 1340 Wp (335 Wp – 4 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4G. Three stage treatment (i) Solar pump capacity: 0.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period (v) Solar panel and battery: 670 Wp (335 Wp – 2 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4H. Three stage treatment (i) Solar pump capacity: 1.0 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period (v) Solar panel and battery: 1005 Wp (335 Wp – 3 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
4I. 'Three stage treatment (i) Solar pump capacity: 1.5 HP DC submersible type (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period (v) Solar panel and battery: 1340 Wp (335 Wp – 4 No.) lithium-ion battery of 96 V-24 Ah of required numbers for 2 (two) hours backup
5. Supply, installation, testing and commissioning of standalone water purification plant with specified single phase electric submersible pump set coupled with wet type submersible electric motor drive of adequate power suitable for operation at 230 V, 50 Hz fitted with tube well, capable of removing specified contaminant along with bacteriological disinfection (by Chlorine dosing system) from the raw water bringing the filtered water quality as per the acceptable limits of IS: 10500:2012 including 3 (three) months trial run and 33 (thirty-three) months operation and maintenance after the trial run under PHED of Assam. The work broadly comprises of supply, installation, testing and commissioning of standalone community water purification plant fitted with existing well and pressure filter having specified filtration rate. The submersible pump placed within the bore well shall be of specified minimum yield. Filtration process technology shall require approval by CSIR-IMMT or NEERI with complete test report. 5A. '(i) AC pump capacity: 0.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period
5B. (i) AC pump capacity: 1.0 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period
5C. '(i) AC pump capacity: 1.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period
5D. '(i) AC pump capacity: 0.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period
5E. '(i) AC pump capacity: 1.0 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period
5F. (i) AC pump capacity: 1.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and arsenic 2.0 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period
5G. (i) AC pump capacity: 0.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 1,000 litres/hours (iv) Yield of tube well: not less than 5,000 litres/day with 5 hours working period
5H. '(i) AC pump capacity: 1.0 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 2,000 litres/hours (iv) Yield of tube well: not less than 10,000 litres/day with 5 hours working period
5I. '(i) AC pump capacity: 1.5 HP single phase submersible type (pump of make Crompton Greaves/Acquatic/CRI/GEC/V-Guard or equivalent) (ii) Contaminant: maximum level of contamination of iron 5 ppm and fluoride 20.0 ppm (iii) Filtration rate of pressure filter: not less than 3,000 litres/hours (iv) Yield of tube well: not less than 15,000 litres/day with 5 hours working period
6. Providing, installation and commissioning of 100 mm dia deep tube well by hand boring within the jurisdiction of different divisions of PHED, Assam including preparation of site, drilling the DTW including extraction of drill pipes etc, lowering, fitting, fixing 100 mm diameter UPVC pipe assembly comprising of strainer, pipes and cone in potable water bearing strata, washing the bore well etc., supplying necessary jointing materials, developing the DTW with air compressor Make- Kirloskar / Cumins/ or equivalent for a period of 12 hours and supplying and packing pea gravel of size 3 mm to 10 mm around the periphery of casing including screening washing etc. all complete as directed for maximum 80 m depth
7. Odex : Providing installation and commissioning of 200 mm dia DTW by Odex boring with 8 mm thickness 200 mm dia MS pipe (Best quality) within the jurisdiction of different PHE divisions including preparation of site for placing of drilling rig, air compressor, transportation of rig and ancillary equipments. Construction of temporary accommodation and low cost sanitary facility for drilling staff and providing water supply facilities at drilling site. Drilling of bore well by using drilling rig having ODEX system including welding of pipe joints. Developing of the D.T.W. with air compressor, Make- Kirloskar / Cumins all complete as directed by the department.
FAKAR UDDIN
SHABBIR AHMED ANSARI
MAHDI ALAM
Tomir Uddin Ahmed
MD. FAZLUR RAHMAN(T)
HABIBUR RAHMAN
Ajoy Bhagawati
NABAJYOTI BORAH
NOOR UDDIN
Kishalay Gupta
Madhab Enterprise
Contractor
Nabendu Bhusan Roy
Jitu Bhuyan
Fazar Ali
Suman Das
Shyamal Paul
Ranju Kumar Yadav
Baharul Islam
MANTAZ UDDIN
Alauddin Choudhury
Anup Biswas
Sri Achyut Saikia
SAMAR GHOSH
Raju Kar
Ranjit Dey
Bakul Nath
Muzibur Rahman
Khokan Ch Shil
REHANA BEGUM
Indreswar Borah
Sri Ratul Boruah
Shanu Paul
Gouab saha
Sri Biraj Bhusan Borah
SANJAY SARKAR
JAKIR HUSSAIN
Sri Bhaba Kumar Borah
M/S Nur Enterprise
Bharat Sarmah
PRAN JYOTI SAIKIA
DULAL CHANDRA BORAH
Md. Abul Hussain
Nigam Ghosh
Uttam Das
Sri Rajib Kumar Bordoloi
RAJ DEY
Sri Khitish Mahanta
Abdul Kayum
Amit Nath
Sri Jiten Borah
Krishna Kanta Das
Lokeswar Prasad Gupta
Keshab Chandra Das
MD SAIF UDDIN
Syed Shakir Hussain
BRAHMAPUTRA COMMERCE AND TRADE
RD Enterprise
Dochania and Company Private Limited
M/S KAKOTI ENTERPRISE
Mehrajul Islam
Bhrigujit Choudhury
Moidul Islam Khan
Moin Uddin Ahmed
MANOJ KR. HARLALKA
ZSEE SMART SOLUTION INDIA PRIVATE LIMITED
Bapdhan Saikia
Abdul Salam
Kamal Uddin
Sri Uday Baishya
Haren Mahanta
DHRUBAJYOTI BORGOHAIN
GOPANKA PATHAK
MS MH ENTERPRISE PVT LTD
DIPU HAZARIKA
Lakshya Jyoti Hazarika
KULADIP BORAH
BHAWANI MARKETING PVT.LTD
SUNINDIA POWER AND INFRA LLP
CMPLUS POWER & INFRA PVT. LTD.
Manab Jyoti Bora
RAJ KISHORE BORA
Gopal Mazumdar
Dipu Saikia
Sanjib Kumar Bora
ABU NASAR WAHID CHOUDHURY
MOTIOR RAHMAN
Dipak Kumar Deka
M/s Macrocosm Builders
IMTIAS NASRIN
Dynamic Engineers and Company
ANGSHUMAN GAUTAM
Contractor
Mainul Hoque Chowdhury
Contractor
M/S NARAYAN MANDAL
Abdul Wahab Choudhury
JAFARUDDIN AHMED
Fardushi Rahman
ATUL CH BORA
Md Jakir Hussain
Sharif Uddin Ahmed
HAZRAT ALI
JM SQUARE ENTERPRISE
JAIDEV BUILDERS
SALIM AHMED MAZID
HAMENDRA SAIKIA
M/S BABA CONSTRUCTIONS
AZAHAR UDDIN
PADUM KUMAR CHOWDHURY
MIHIR KANTI BISWAS
Amdadul Hussain
M/S MA LAKSHMI INDUSTRIES
BRAHMAPUTRA RIVER VALLEY TRADING PVT. LTD.
NIKITA AHMED
K S Infratech
Idrish Ali
Apurba Goswami
GOKUL KUMAR CHETRY
DIPANKAR MANDAL
SUBRATA BHOWMICK
M/S SHARMIN ENTERPRISE
Contractor
ANUWAR HUSSAIN
Rahan Uddin Ahmed
NAWAZ SHARIF
REHENA SULTANA
Partha Pratim Bezbaruah
BABUL CHANDRA NATH
Shyaam Enterprise
RANGLUIT ENTERPRISE
ABDUL HANNAN
Md Gazibur Rahman
Mourya Enterprise
Mustafa Kamal
SHAK FARUQUE ABDULLA
Md. Mannas Ali
Musfikur Rahman
M/S KIRAN HAZARIKA
Aminul Haque Choudhury
NAKUL CHANDRA SARMAH
Kamal Kumar Modi
SRI KUMUD CH. DUTTA
atw india pvt ltd
Saidul Islam
Dhananjay Bhattacharjee
AJ Enterprise
IMDADUL HUSSAIN
DEEPAK CHOUDHURY
Shree Construction
Dipankar Bordoloi
SURUJ KUMAR SAIKIA
GAGAN PATAR
KESHAB GOGOI
MR. LAKHI PRASAD GOGOI
Idrish Ahmed
KAUSHIK SAIKIA
Durllav Patar
REKIBUDDIN AHMED
MATIUR RHAMAN
AJAHARUL ALAM
Sri Utpal Kalita
MAINUL ISLAM
ARIF KHAN
BHAJAN MANDAL
Contractor
HAFIJUL ISLAM
ARIFUL WAZID
RANJAN RABHA
BILOB SAIKIA
DHRITISHMAN MEDHI
Purnima Begum
Contractor
SUBAL CHANDRA SAHA
Azizur Rahman Choudhury
Sajan Ahmed
Miss Runu Bharali
M/S S.D TRADERS
B Enterprise
Rohit Construction
SARUWAR ALAM
DHRUVA NARAYAN SHARMA
M/s S.B. Engineering
MAINUL ALAM SHAH
MD SIRAJ ALI
ARIFUL KABIR
SAJAL BARDHAN
NAVA PRATIM DEKA
Md. Samsul Ali
Ayub Ali
Ms Appu Enterprise
Diganta Kumar Medhi
Prasanta Kumar Borthakur
MD ASRAFUL HUSSAIN
M/S SAFIQUAL ISLAM KHAN
Hibjur Rahman
Arihant Sales Corporation
SHAKIL AHMED
Suzat Rahman
AAMIR SHOHAIL
Asraful Alom
M/S D.K. (ASSAM) ASSOCIATES PVT. LTD.
M/s Kriti Constructions Pvt. Ltd
SADANANDA HAZARIKA
FARUK AHMED
Manikanchan Traders
MUSFIQUR RAHMAN
MD & SONS TRADERS
Md Abu Hanifa
ASHIM MAHANTA
JYOTISH BAISHYA
Suleman Ali
Md Ikramul Hussain
Md. Dulal Uddin
Md Shirajul Islam
Subhrajyoti Saikia
MD ROSHIDUL HOQUE
BPLAB KUMAR TARAFDAR
M/S NURMAN ALI
AZIZUL HOQUE
RAFIKUL ISLAM
Sri Dhrubajyoti Kakati
TASHLIMUDDIN AHMED
Dil Muhammad
PINTU ROY
GLOBAL ENTERPRISE
SIDDIQUR RAHMAN
M/S BHOWMIK ENTERPRISE
M/S FOUR STAR CONSTRUCTION
Motiur Rahman
BIRAJ KR NANDI
Utpal Bora
IMDAD HUSSAIN
M/S RAJ ENTERPRISE
Contractor
Landmark Engineering
BABUL HUSSAIN
Contractor
M/S P. G. AUTO COLOUR
MD AMRADUL ISLAM
COMPUTECH SYSTEM
TOMEZ UDDIN AHMED
Md Easin Ali
FIROJ KHAN
Fakar Uddin
ABU BAKKER SIDDIQUE
Alaluddin
MD.IMRAN HUSSAIN
MD ABU JOHIR
ABDUL WAHAB
NIPUL KUMAR BORTHAKUR
MUKTAZUL HOQUE
NUTECH COMMERCIAL
Mainul Haque
NITESH KUMAR AGARWAL
M/S PATKAI CONSTRUCTIONS PRIVATE LIMITED
Md Saidur Rahman
Debadib Das
M/S ASSAM STEEL ENTERPRISE
M/s Chakraborty Enterprise
M/S DAS ENTERPRISE
Contractor
RAGHAV MANDAL
DWIBAN KUMAR BARO
Rofique Ahmed
Jayanta Bordoloi
Rishav Pradipta Changkakati
PRABAL RAJKHOWA
M/S A J ENTERPRIZE
GLOBAL INCORPORATE
ZUBAIR AHMED
Md. Ashique Ikbal
A R ASSOCIATES
ICB INFRATECH
M/s B.S. Enterprise (Prop. Bittu Sarkar)
UDDHAB SAIKIA
AHIDUL ISLAM
M/S R.S. ENTERPRISE
Md Nawshad Ali
HARADHAN KUNDU
Md. Jakir Hussain
SUDIP BHOWMICK
Jatindra Narayan Bora
Subhansu Pratim Saikia
Mrinal Jyoti das
KAMALESH KAKATI
Tanvir Rahman
DEBOJIT PHUKAN
Contractor
GULAP MASTAFA
ABUZAR HUSSAIN
Dulal Hussain
SUMAN SAHA
HARUN RASHID
NIPEN BISWAS
Umme Habiba Foraji
Shamsul Alam
ATAUR RAHMAN
NRIPEN SHARMA
PRABHAT HIRA
MOFIDUL ISLAM
DULAL KALITA
MD TAFAZZUL ALI
BISHNU SAIKIA
MOIN KHAN
ACHARUDDIN
PRAMUD SAIKIA
RUPAM BHUYAN
NURUL HOQUE
SHONIT KR. DEKA
MEHDI ALAM
M/S PAKHI CONSTRUCTION
SAMSUL HOQUE
Nizamuddin Ahmed
Baharul Islam
Contractor
INDRA MOHAN DEKA
Bishal Senapati
Partha Pratim Konwar
BANDHAN KR. JAIN
MANAB AMPHILI
Pankaj Tamuli
NURUZ ZAMAN
MD EYAJUL HAQUE
bhubeneswar deka
JEKIBUR RAHMAN
RAMESH BISWAS
NAGEN DAS
TAPAN SHARMA
Contractor
TAYABUR RAHMAN FARUQUI
MRIDUL BORDOLOI
MD GULZAR HUSSAIN
Kamaleswar Deka
MD. ASMAT ALI
M/S S.A TRADING
PRADIP BAISHYA
Contractor
Mubarak Hussain
GAUTAM DAS
M/S - MANAS AGRO INDUSTRIES
Sri Manoj Pareek
NASIR UDDIN
ABDUL KADER
M/S SATYAJIT ELECTRICALS
ALOK KUMAR SINGH
ANOWAR HUSSAIN
ABHIMA ENGINEERS PRIVATE LIMITED
MD HAFIZUL ISLAM
Safikur Rahman
R D Water System Pvt. Ltd
R S PROJECTS
SAIFUL ISLAM
ABDUL HANNAN
PRADIP INFO ENTERTAINMENT PVT LTD
SULEKHA DEVI
ASHOK KUMAR BAJAJ
MS PRAGATI ENTERPRISE
FAKHRUL HASSAN
Mehbuba Sultana
OHIDUL ISLAM CHOUDHURY
M/S BORGHULI ROSE ENTERPRISE
MAINUL HAQUE
MD ANUWAR HUSSAIN
Abdus Subhan
VERSHA TECHNOTRADE PVT LTD
M/S ANAND
Bidyut Das
Aminul Islam
MS Unique Construction
HI-Tech Water Solutions Pvt. Ltd
Mousum Bora
MD IQBAL HOQUE CHOUDHURY
SULAIMAN ISLAM
M/S J.F. ASSOCIATE & SONS
SSK INDUSTRIES
MD DILOWAR HUSSAIN
SRI PULAKESH KAKATI
M/S RANJIT KAUSHIK
Arsiddh Infraprojects
Aquasolution
OK Enterprise
ZAKI ENTERPRISE
M.H. CONSTRUCTION
BRAHMAPUTRA CONSTRUCTIONS
ARUNABHA BARUAH
Susmita Sarma
BJS TRADING
M/S East India Construction
JITU HAZARIKA
G Net Infratech
DEEPAK CHETRY
SONJIB DAS
PARAG DUTTA
MONMI KAKOTI
Granth Associates
Bikash Enterprises
MS S B B Associates
Contractor
Achintya Kalita
M/S R.R.ENTERPRISE
Bhubaneswar Borah
M/s Nawab Enterprise
Contractor
Sabina Yeasmin Nehar
M/S. MAA ENTERPRISE
M/S Kalpana Construction
Contractor
Abu Bakkar Siddique
Arupjyoti Saikia
Biki Gope
Rajat Singh Gour
Contractor
Dipjyoti Saikia
Krishna Kanta Nath
Md. Elias Khan
S A Traders
Sofiqul Islam
Choudhury Enterprise
Jiten Hazarika
Abul Kalam Azad
Dipu Borah
Contractor
Amdadul Islam
M/s H.R. Trades Corporation
Rashiful Huda
Contractor
MUSTAFIZUR RAHMAN
Jahirul Islam
S.B. Enterprise
Altaf Ahmed
Contractor
Al-Kabir Enterprise
Lakhi Ranjan Kakati
Dilip Kumar Hazarika
Mantu Baruah
Anamur Rahman
Jul Haque
Partha Sarathi Borah
Rabin Chandra Borah
Elan Construction
MD SAHA KAMAL
Ganesh Saikia
Ranjit Saikia
Plabon Borah
M/S BMS GROUP
Ashish Mandal
Fatima Parbin Begum
Md Abdul Jabber
RABIN CHANDRA SARMAH
M/S M.R. Enterprise
Zahirul Islam
Ranjeet Kumar Roy
Prabal Saikia
Nirika Langthasa Das
M/S T. R. ENTERPRISE
Inamul Hoque
Jiarul Hoque Fakir
Rinju Moni Baruah
M/S Sajidur Rahman
Bimal Ch. Borah
Ranjan Hazarika
M/S Sanwar Mal More
Iqbal Hussain
Gunindra Khakhlari
Naba Kumar Borah
Tapika Mandal
Sheikh Serajdullah Hazarika
M/s Synergy Enterprise
KAMAL KUMAR SURANA
Prahlad Das
Bidyut Bora
Habibur Rahman
Ijajul Hoque
Ajmol Hussain
M/S Biswas & Co.
BHUYAN CORPORATION
Jakir Hussain
Contractor
Mantu Kumar Nath
Huzzatul Islam
M/s Abhinab Enterprises
Kstan Jain
Abu Ansari
Mahar Ali
Jayanta Das
Contractor
Bharat Borah
Riaz Uddin Ahmed
Gautom Saikia
A.R. Enterprise
Hifjur Rahman
Contractor
Sri Prasanta Kumar Bora
Tusanta Kalita
Vinod Poddar
Pabitra Borah
Porag Bordoloi
Pintu Chakraborty
Kashi Prasad Poddar
Star Hardware
M/s Gargi Enterprise
Tuki Uddin Faruk Islam
Mamoni Borah
Nikita Enterprise
M/S H.C Enterprise
Ashim Hazarika
Contractor
Azaharul Islam
Tosa Associate
Contractor
Abdul Kayum
Amin Ali
M/s S.A. Enterprise
Bhaba Kailta
Md. Saiful Islam
Paritosh Mandal
M/S Electrical & Electronics
Darpan Enterprise
Jamina Ahmed
Habiqul Islam
M/S A K Traders
Gulap Hussain
Mitali Goswami Sarmah
Uttam Deka Raja
Harit Baran Sarmah
Prabhat Kumar Agarwalla
Dipak Nath
Dipak Kr Borah
MD AZIZUR RAHMAN KHAN
Manik Tossa
Anuwer Hussain
Siddhartha Mandal
P.M.P. WORKS & SUPPLIERS
Shuhail Jahangir
Jahirul Islam
Rezaul Huda Farazi
Pabitra Oja
AZ Constructions
Contractor
Ashadullah Choudhury
M/s J.R. Enterprise
Sri Bhabani Saikia
Badrul Islam
Mazibur Rahman
Pratap Ch. Sarmah
Najmoon Nehar
Sri Mousum Das
L&B Associate
Md. Anowar Hussian
SANJIB SAIKIA
Sahabuddin Ahmed
Shaikhul Islam
Nitesh Kumar Kanoi
NRIPEN NATH
Rubia Khatun
Monmi Kataki
Sharuwar Alam
M/s Shanti Enterprise
Shahjahan Ali
Contractor
A B Enterprise
Contractor
Fakrul Islam
Mukuta Borah
Nilutpal Sundilya
Samadur Rahman Matabbor
Nurul Amin
M/s Borah Enterprise
Abdul Bareque
Abu Nasar Ansary
Contractor
Biddyut Kumar Borthakur
Pradip Kumat Nath
TRIDIP RANJAN DUTTA
SHREE ANANT UDYOG
M/S ARNAB JYOTI NATH
Bora Electricals
FREE POWER TECHNOLOGY PRIVATE LIMITED
SRI SWAPAN BANIK
Giri Kt. Goswami
Milton Borah
Paban Kumar Borah
Lulu Saikia
M/s R.S. Enterprise
Puja Borah
Purnananda Das
Paran Kumar Mahanta
SALIM AHMED MAZUMDER
Samsun Nehar
Ahmed Ali
Iftikar Hussain
Pranjit Borah
Lokman Hakim
M/s Jyoti Enterprise
PANKAJ LASKAR
Nikita Marketing Services Pvt. Ltd.
B.R. Enterprise
M/S N.K. Construction & Infrastructure Group
Gawsul Azam Mehadi
Apurba Debnath
M/s Toufik Enterprise
Abhijit Borah
Prasannajit Kalita
HUSSAIN AHMED MAZUMDER
PPP Enterprise
Gunjan Mahanta
Badrul Haque Chowdhury
Anshuman Sarmah
Partha Pratim Mahanta
Dip Kumar Bora
SWAROOP JYOTI BORA
Madan Gupta
Bhaskar Jyoti Bora
Ariful Islam
Kamal Prasad Chauhan
M/S A.H. Enterprise
Atul Chandra Nath
Grassroots Support Organization
Asraful Alam
M/s Subarna Construction
M/S Biswanathen Enterprise
HARIDAS BANIK
shoiab khan
ASOMI CONSTRUCTION & SUPPLY SYNDICATE
r r enterprise
Saidul Islam
Sanjib Bhattacharjee
aaravii
M/S MANSAROVAR ENGINEERS
KESHAB PURKAYASTHA
SOUMITRA DAS
Sri Kedarnath Pumps & Co.
Shree Raghu Sales Corporation
PCI Wires Pvt Ltd (Formerly Power Cable Industries)
TACENT INDUSTRIES PRIVATE LIMITED
Step Industries Pvt Ltd
MK Plastic
Md. Mahmudul Hassan
Uttam Ch. Barman
Chitta Ranjan Nath
Muzammil Hoque
Ram Ch. Roy
Anupam Barkataki
BISHNU RAM BORA
Contractor
Dibya Jyoti Das
PRANJIT KUMAR NATH
Sudip Saha
Abu Bakkar Siddique
Md Mojibur Rahman
Contractor
Rabindra Karmakar
Ikram Hussain
Eusul Ali
BADIU JAHAN
ASHADUZ ZAMAN
Ripan Mandal
Deben Aryya
Bubul Ch. Borah
MADHURJYA JYOTI BORAH
PLABANJYOTI BORA
Nepal Sarkar
Nilamoni Kakati
Rinku Karmakar
Sri Jatin Ch Saikia
Mrinal kr Bora
Biswajit Sutradhar
Ikbal Hussain
Kalpa Bora
Contractor
Trolokya Kumar Borah
Tikendrajit Sarmah
Pranab Jyoti Saikia
Biswajit Medhi
M/S OM CONSTRUCTION
SRI PALLAB JYOTI BORA
Contractor
M/S Krishna Enterprise
Abdul Mutalib
Sarat Hazarika
Bipul Sarkar
Birinchi Bhattacharjee
Tosheswar Kalita
Mojibur Rohman
M/S Kusumbi Enterprise
Contractor
Ponkit Das
Zamal Uddin
Mridul Saikia
Prakash Dugar
Paltu Banik
Md. Abu Bakkar Siddique
Sri Charu Goswami
ALI AKBAR
Mursidul Alam
Samir Bhuyan
Pradip Ghosh
Karuna Bora
Muddasir Hussain
Sri Satyajit Bora
Sajal Kumar Sarkar
Momin Ali
Diganta Kumar Borah
Mamtaz Begum
Sushil Kr. Khound
Tarun Nath
Paritosh Mitra
Kapinjal Sarmah
Pintu Deb
PABAN SHARMA
RITURAJ BORAH
INNOVUS INFRATECH
GRAVITY ENGINEERING CONSORTIUM
Natsakee Incorporation
M/S ONE STAR ENGINEERING
TREMEND DRILLCO PVT LTD
Osman Ali
Mokibur Sarkar
Progressive Enterprises
Buildrite Constructions
GAUTAM BORGOHAIN
SINTU KHATONIAR
SARAWGI AND SONS
SAMRAT BUILDTECH (INDIA) PRIVATE LIMITED
UMESHWAR ROY
PAWAN KUMAR SINGH
PRABHASH KUMAR SINGH
Rania Technovations
Sarawgi Infracon Private Limited
Power Tools & Engineering
Power Tools and Engineering
RIPUNJOY BORTHAKUR
KRISHNA ENGINEERINGS
KAMAKHYA ENTERPRISE
Bidder Name
RD Enterprise
Sri Uday Baishya
DULAL CHANDRA BORAH
NABAJYOTI BORAH
Madhab Enterprise
Sri Achyut Saikia
Sri Biraj Bhusan Borah
Indreswar Borah
MD SAIF UDDIN
Dochania and Company Private Limited
BRAHMAPUTRA COMMERCE AND TRADE
Jitu Bhuyan
SANJAY SARKAR
Sri Rajib Kumar Bordoloi
REHANA BEGUM
Anup Biswas
Syed Shakir Hussain
Ranju Kumar Yadav
RAJ DEY
Krishna Kanta Das
Raju Kar
JAKIR HUSSAIN
Alauddin Choudhury
Sri Ratul Boruah
Fazar Ali
Sri Khitish Mahanta
Md. Abul Hussain
Kishalay Gupta
Contractor
MANTAZ UDDIN
SAMAR GHOSH
Bakul Nath
NOOR UDDIN
Nigam Ghosh
Shanu Paul
Suman Das
Sri Bhaba Kumar Borah
Ranjit Dey
Amit Nath
Nabendu Bhusan Roy
Haren Mahanta
M/S Nur Enterprise
PRAN JYOTI SAIKIA
Shyamal Paul
Baharul Islam
Muzibur Rahman
Gouab saha
Bapdhan Saikia
Khokan Ch Shil
Ajoy Bhagawati
Bharat Sarmah
Lokeswar Prasad Gupta
Abdul Kayum
Keshab Chandra Das
Moin Uddin Ahmed
Uttam Das
Moidul Islam Khan
Mehrajul Islam
Sri Jiten Borah
Kamal Uddin
Abdul Salam
stage.html
html • 2.24 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .