| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹22.6 CrAccepted-AOC | ₹22.6 Cr Quoted ₹23.5 Cr | L-1 | Accepted-AOC AOC |
| 2 | L-2₹24.3 CrRejected-Finance | ₹24.3 Cr | L-2 | Rejected-Finance Reject |
| 3 | L-3₹25.4 CrRejected-Finance | ₹25.4 Cr | L-3 | Rejected-Finance Reject |
| 4 | L-4₹26.0 CrRejected-Finance | ₹26.0 Cr | L-4 | Rejected-Finance Reject |
Tender Value
₹23.5 Cr
EMD Value
₹35.3 L
Closing Date
7 Jan 2022, 12:00 pmClosed
OFFICE OF THE SE BANDA CIRCLE P.W.D. BANDA
OFFICE OF THE SE BANDA CIRCLE P.W.D. BANDA
The work of widening and strengthening work in Km 1 to 21.300 of Baberu-Oran ODR in Banda district
2021_CEJNS_666828_1
3452/35C-BANDA CIR-20-21 DATE-20-11-2021
Open Tender
Civil Works
365 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,260
₹35.3 L
Yes
OFFICE OF THE SE BANDA CIRCLE P.W.D. BANDA
23 Aug 2022
1 Jan 2022
7 Jan 2022
1 Jan 2022
7 Jan 2022
1 Jan 2022
5 Jan 2022
Amount
Scarifying existing bituminous surface to a depth of 50mm and disposal of scarified material with a lift up to 3 m. and lead up to 1000 m. as per Technical specification cluse 301.4 by mechanical means The Rate of Including Labour Cess
Earth work in trench cutting in proper camber according to required depth for laying garnular sub base including rolling with road roller upto required M.D.D., dressing, cost of labour, T&P and hire charges of machinery etc. complete work as per The Rate of Including Labour Cess
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. The Rate of Including Labour Cess
Construction of Granular sub base by providing close graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and compacting with vibtatory roller to achive the desired density complete as per clause 401. The Rate of Including Labour Cess
Providing laying, spreading and compacting graded stone aggregate to wet mix macadam specification inlcuding premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with machanical paver in sub-base/base course on wall prepared surface and compacting with vibratory roller to achieve the desired density. As per MOR&TH specification No. 406 The Rate of Including Labour Cess
Providing laying, spreading and compacting graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixe material by tipper to site, laying 1% OPC cement and 3.5% Emlusion in uniform single layer on sub base/subgrade and compacting with the road roller to acheive the desire density.The Rate of Including Labour Cess
Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.30 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. As per MORT&H on wmm steblization as perClause 503 The Rate of Including Labour Cess
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. The Rate of Including Labour Cess
Providing and applying tack coat with V.G. 10 grade bitumen using emlusion pressure dristributor @ 0.30 kg. per sqm. on the prepared bituminous surface cleaned with machenical broom. As per MORT&H on wmm steblization as perClause 503 The Rate of Including Labour Cess
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects The Rate of Including Labour Cess
Earth filling in patri in including rolling with road roller upto required M.D.D., dressing the surface to required level and slope & also including 1.50 m. lift and 30 m. lead, cost of labour, T&P and hire charges of machinery etc. complete work as per direction of Engineer-in-Charge. The Rate of Including Labour Cess
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form of slip form paver, spread, compacted and finished in a continuous operation inlcuding provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compunt, finishing to lines and grades as per drawing. Clause 602 The Rate of Including Labour Cess
Construction of 1000 mm dia, 600 mm dia, 350 mm dia Hume pipe Culvert and 2×4.00 M. Slab Culvert work Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251) The Rate of Including Labour Cess
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Km from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) The Rate of Including Labour Cess
Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. The Rate of Including Labour Cess
Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. The Rate of Including Labour Cess
Providing and laying reinforced concrete pipe NP3 in single row for culverts on 'Type A' (Concrete cradle) bedding with M 15 grade cement concrete including fixing coller with cement mortar 1:2 but excuding excavation protrction work, backfilling, concrete and masonary works in head walls and parapets clause 1106 as per Data Book item No. 9.3 (B) 1000 mm Dai Hume Pipe. The Rate of Including Labour Cess
Providing and laying reinforced concrete pipe NP3 in single row for culverts on 'Type A' (Concrete cradle) bedding with M 15 grade cement concrete including fixing coller with cement mortar 1:2 but excuding excavation protrction work, backfilling, concrete and masonary works in head walls and parapets clause 1106 as per Data Book item No. 9.3 (B) 600 mm Dai Hume Pipe. The Rate of Including Labour Cess
Providing and laying reinforced concrete pipe NP3 in single row for culverts on 'Type A' (Concrete cradle) bedding with M 15 grade cement concrete including fixing coller with cement mortar 1:2 but excuding excavation protrction work, backfilling, concrete and masonary works in head walls and parapets clause 1106 as per Data Book item No. 9.3 (B) 350 mm Dai Hume Pipe. The Rate of Including Labour Cess
12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. As per SI. No.-584 The Rate of Including Labour Cess
Cement concrete with 2cm gauge approved stone ballast, approved coarse sand. cement in the proportion 1:2:4 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. The Rate of Including Labour Cess
Mild steel or iron wirk in plain work such as reinforced. Concrete or brick work (When not included in an over all rates) Wrought to required shape as necessary including binding for proper completion of the work and including supply of all steel wastage and over laping and hooks. The Rate of Including Labour Cess
Earthwork in ordinary soil for cushion with approved material obtained from road side land or borrow pits with a lift upto 1.5 m and lead upto 30 m, spreading in layers bringing to appropriate moisture content and mechanically compacted with static rol The Rate of Including Labour Cess
R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone ballast in the propotion of 1 : 1.5 : 3 in bed of causeway excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. bind As Per SI No. 283 The Rate of Including Labour Cess
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall return wall to the full hight, compacted to firm condition complete as per drawing and technical specification clause 1204.3.8 Per SOR Chapter 12 (12.11) The Rate of Including Labour Cess
Providing weep holes with 75mm dia PVC pipe complete Material Rate Chapter-1 As Per SI No. 36(33) The Rate of Including Labour Cess
Shri Krishna And Company
Ms Highway Construction co
M/s Chopra Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf