| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹81,001.47Admitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹88,401.60+₹7,400.13 (9.14%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹94,001.70+₹13,000.23 (16.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹99,991.81+₹18,990.34 (23.4%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
24 Nov 2025, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2025_RDPR_295600_12
e-NIT 198 of REW Poonch 2025-26 Date 18-11-2025
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹2,000
1 Dec 2025
18 Nov 2025
25 Nov 2025
18 Nov 2025
24 Nov 2025
18 Nov 2025
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) with 30% stones
Half brick masonry with common burnt clay (non-modular) bricks of class designation Cement mortar 1:3 ( 1 cement : 3 coarse sand)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate.
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Under 20 cm wide
Providing & Fixing Of Doors & ventilators
Add. Cost of Syntex Water
Add cost of Sanitary Fitting with complete job
Add cost of Electric items with complete job
Carriage of sand Bajri by 10 KM by MT
Carriage of brick by 150 KM by MT
Carriage of stone 100 M by HL
Add the Cost of CIB
stage.html
html • 0.03 MB
techsummary_957054.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_957054.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .